Coppell OV 1A-CS081229
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: PD-238-HC. Coppell Office Villae:e. zoning change request from HC (Highway
Commercial) to PD-238-HC (Planned Development-238-Highway Commercial) to
attach a detail site plan to allow a one-story", 23,200-square-foot office building on
2.02 acres of property located along the south side ofS.H. 121, approximately 400
feet east of Denton Tap Road, at the request of Terry Holmes, Holmes Commercial.
STAFF REP.: Marcie Diamond PROJECT ID# PD-08-0048
DRC DATE: December 29,2008 and January 2,2009
CONTACT: Kenneth M. Griffin, P.E., D;r.ofEmdneer;nJ!/Public Works 972/304-3686
COMMENT STATUS: -/PRELIMINARY 1<'T1\~4~ REVISED
..... ......J..1'
APTER P&Z
1. Provide a copy of the agreement for the shared water line.
2. The domestic and irrigation meters should be installed in the public ROW.
3. Show the off-site drainage, drainage will be evaluated further during engineering plan
review.
4. The site plan and the utility plan do not match.
5. Remove "utility easement" from the fire lane on the utility plan.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Connell Office Villae:e. Lot 1. Block A. Renlat. a replat of the V-Haul Addition,
Lot 1, Block 1, to relocate and revise easements to allow the development of an
office building on 2.02 acres ofland located along the south side ofS.H. 121,
approximately 400 feet east of Denton Tap Road, at the request ofL. Lynn Kadleck,
Kadleck & Associates.
STAFF REP.: Marcie Diamond PROJECT ID# RP-08-0049
DRC DATE: December 29, 2008 and January 2,2009
CONTACT: Kenneth M. Griffin, P.E., Dir.of Enf!ineerinwPublic Works 972/304-3686
COMMENT STATUS: ~PRELIMINARY FLVAL REVISED
AFTER P&Z
1. Remove "utility easement" from the fire lane.
2. Include a 20' utility easement for the sanitary sewer main.
3. Include a 5' drainage easement on the east side of the property.