Alexander Ct-CS080813
,.........,
DEVELOPMENT FEES
PROJECT NAME: Alexander Court
ENGINEER: Bennett Engineering
ORIGINATION DATE: 5/2/2007 (Revised 8/11/2008)
SENT ASSESSMENT ASSESSED FEE AMOUNT PAI[ DATE
Revised 8/13/2008 Water Impact Fee $46,584.00
Revised 7/31/2008 Water Impact Fee $2,997.00 $2,997.00 cd 7/31/2008
Revised 8/13/2008 Wastewater Impact Fee $43,587.00
Park Fee $37,265.00 $37,265.00 RA 8/8/2007
Roadway Impact-Zone n/a --
Street Sign $380.19 $380.19 CD 5/14/2008
Street Light $1,170.40 $1,170.40 ra 3/17/2008
Construction Inspection $21,189.00 $21,189.00 cd 8/8/2007
EG or Bore Permit
Overtime Inspection
Flood Study Review $2,000.00 $2,000.00 ra 5/2/2007
Revised 8/13/2008 Water Tap Inspection $1,500.00
Revised 7/31/2008 Water Tap Inspection $50.00 $50.00 cd 7/31/2008
Wastewater Tap Inspection $1,450.00
Revised 8/13/2008 Water Meter (Domestic) $1,895.44
Water Meter (Fire/lrrig) $163.80
Revised 7/31/2008 Water Meter (Fire/lrrig) $163.80 $163.80 cd 7/31/2008
Meter Deposit (Domestic) $870.00
Meter Deposit (Fire/lrrig) $30.00
Revised 7/31/2008 Meter Deposit (Fire/lrrig) $30.00 $30.00 cd 7/31/2008
Utility Final Inspection $1,450.00
Subtotal to Enq. $62,004.59 $62,004.59 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $162,775.63 $65,245.39 $97,530.24
NOTES
Prior To Construction Date Received Prior To Final Acceptance
Erosion Control Approved As Built Plan Reed.
E.PA-N.O.!. Reed. Paving Bond Reed.
Const. Plan Approved Utilities Bond Reed.
Erosion Control Maint.
/'.
.--,
DEVELOPMENT FEE TABLE
Project: Alexander Court
Date: 6/8/2007 revl-8/17/2007 rev2-7/31/08, 8/13/2008
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $46,584.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $1,500.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,895.44
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationlFireline) $163.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $870.00
(100% due at Issuance of Water Meter)
IrrigationlFireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $43,587.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $1,450.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,450.00
(100% due at Issuance of Building Permit)
Park Fee $37,265.00 $37,265.00
(100% due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOT AL II $134,795.241
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $37,265.00
-----
.---..
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Alexander Court
6/8/2007 revl-8/17/2007 rev2-7/31/08, 8/13/2008
Water Impact Fee:
Domestic Meter(s): 29 - 1 inch = 48.43 ESU's
Irrigation Meter(s): 0 = 0 ESU's
1 - 1 1/2 inch = 3.33 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 51.76 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
$46,584.00
Water Tap Inspection Fee:
Total #:
30 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$1,500.00
Domestic Water Meter Fee:
Total #: 29 Domestic Meter(s) @ $65.36
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$1,895.44
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @
Total #: 1 Additional Irrigation Meter(s) @
Total #: n/a Fireline Meter(s) @
(100% due prior to issuance of water meters)
$0.00
$163.80
$0.00
$0.00
$163.80
meter provided by developer
Domestic Water Meter Deposit Fee:
Total #: 29 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$870.00
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$30.00
Wastewater Impact Fee:
Total Domestic Meters ESU's: 48.43 @ $900.00 ea.
(Due prior to issuance of building permit)
$43,587.00
Wastewater Tap Inspection Fee:
Total #: 29 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
$1,450.00
Utility Final Inspection Fee (All developments):
Total #: 29 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$1,450.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
29 Single-family @ $1,285.00 per lot
o Multi-family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Zone 1
$37,265.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available
-------
ROADW A Y IMP ACT FEE CALCULATIONS
PROJECT:
DATE:
Alexander Court
6/8/2007 revl-8/17/2007 rev2-7/31/08, 8/13/2008
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
No. LotslUnits
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
ct Fee due = (Development Units) x
'cle Miles per Development Unit x Fee er Vehicle Mile) =
1
Residential
Residential (Medium/Low)
29
29.00
4.24
$150
$18,444.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
6311 Sq. Ft of land to be dedicated as R.O. W by the plat, the property value per the Dallas
County Appraisal District is $3.44/sq.ft. For a credit of 631IX$3.44 = $21709.84.
Percent of Credit Toward Roadway Impact Fees
Total Credit
l //AMQQiVtPlIith\<
100%
$18,444.00
.:::.::...:..:.......:./H:.~;()O:I
DEVELOPMENT FEES
PROJECT NAME: Alexander Court
ENGINEER: Bennett Engineering
ORIGINATION DATE: 5/2/2007 Revised 7/31/2008
/
SENT ASSESSMENT ASSESSED FEE DATE
Water Impact Fee $26,100.00
Revised 7/31/2008 Water Impact Fee $2,997.00 cd 7/31/2008
Wastewater Impact Fee $26,100.00
Park Fee $37,265.00 RA 8/8/2007
Roadway Impact-Zone n/a
Street Sign $380.19 $380.19 CD 5/14/2008
Street Light $1,170.40 $1,170.40 ra 3/17/2008
Construction Inspection $21,189.00 cd 8/8/2007
EG or Bore Permit
Overtime Inspection
Flood Study Review $2,000.00 $2,000.00 ra 5/2/2007
Water Tap Inspection $1,450.00
Revised 7/31/2008 Water Tap Inspection $50.00 $50.00 cd 7/31/2008
Wastewater Tap Insp~ ion $1,450.00
Water Meter (DOm~ IC) $730.80
Water Meter (Fir:1: rig) $163.80
Revised 7/31/2008 Water Meter (Fir Irrig) $163.80 $163.80 cd 7/31/2008
Meter Deposix6omestiC) $870.00
Meter De~i (Fire/lrrig) $30.00
Revised 7/31/2008 Meter Dep sit (Fire/lrrig) $30.00 $30.00 cd 7/31/2008
Utility Fi Ilnspection $1,450.00
$62,004.59 $62,004.59 $0.00
Total Fees Fees Paid Amount Owed
$123,589.99 $65,245.39 $58,344.60
NOTES
Prior To Construction Date Received Prior To Final Acceptance
Erosion Control Approved As Built Plan Recd.
E.PA-N.O.1. Recd. Paving Bond Recd.
Const. Plan Approved Utilities Bond Recd.
Erosion Control Maint.
ilEVELOPMENT FEE TA. ~E
Project: Alexander Court Irrigatiolll~leter
Date: 7/3//2008
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $2,997.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationlFireline) $163.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee SO.OO
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) \I
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOTAL II $3,240.80 I
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00
-----., r-...
)EVELOPMENT FEE WORK~ EET
PROJECT:
DATE:
Alexander Court Irrigation Meter
7/31/2008
Water Impact Fee:
Domestic Meter(s): 0 = 0 ESU's
Irrigation Meter(s): 1 - 1 1/2 inch = 3.33 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 3.33 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
$2,997.00
Water Tap Inspection Fee:
Total #:
1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$50.00
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
so.oo
IrrigationlFireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$163.80
$0.00
$0.00
$163.80
$0.00
meter provided by developer
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$0.00
IrrigationlFire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$30.00
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $900.00 ea.
(Due prior to issuance of building permit)
$0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
$0.00
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$0.00
Park Fee (For Residential Developments Only):
Page 1
JEVELOPMENT FEE WORK~~EET
* Preliminary plat approved:
o
o
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees: ,
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available
I PAY -Ct1~
lj TOTHE . e
'~ ;;~e - nJ
1"11 cffiba n k~
CITIBANK. N.A. BR. #64
Ir 840,NCENTRALEXPY TE100 ~
li~ II/... I DALLAS. TX 75225
; FOR-I-!--2---~ ' ~ ---------- - - - ,
t _ _ __ _ UI ~.? ~ 2 td III '.:.:!._ :1 5 :1~ 2': 9 .? ? ._ ~ 5 ~ 7 0 ,III _ _ __ _ _I
I...r.~~~~.u;!:!bd~~~..;,.;:~~-.,.u"~~...=,,...,.'~..~-.~~~~~~~~~.;u~~-~~~~~~~~~~~~~~~~, ~<.'~~~~e~_
~~~=-~~~~~~~~~~J{~~.~~M~~~~~-:~-.~:....-~~~~,:~~~~::~\:~~~~~..~~_2~~.;~~~~q~.......~~~~.~,_...;..__'?'i
~,: ' '" ' !~J
" MIRA MAR DEV. CORP. 1261 [;.1.;,
6003 SUNDERLAND DRIVE .
COLLEYVILLE, TX 76034 DATE '1:3/-08 88-9353-1131 i
I $ 0Z4D~ :;1
~/tJ()
~
- DOLLARS
6J =:::;; ~.
I
.~------_._~---_._-------~
!I
_ ~ 0)
~rii >;;
0. ~ In N
::lI".. Sl!
g.&l~?5
(.) ><'
~Qlf.'l
"4 S' f- :a:
O~=N
--'"' o<;l (I) I-
.;:. 0.. 0. (TI
-~ 0.
U Il) 0
lOCo)
C\!
--------------!------------- ------------
I
i
,I
i
t
I
Date'
-{II";
, I :'-.' I :....'
l". / ..") _ {ij -(
!
j \-;l~- +1 /~\)
Address
f
t J '.'
For
I -'
; '1--')
I / ..1.
L~7' -- t;
!
;f
'..,
AMI PAID Iii ' -,'j' I ;."
f r.__ ..(.Ll /.
BAlANCE
DUE
/f',. CMEC,tt
MONEY ORDER 0
CREDlrCARDO
j.....-.....-.J. /
hr.J. .
By
r--
"
THE.CITY.OF
COPPELL
May 9, 2008
"'!.::.~ ,";' r~~ L""'~""El,:i.J\/d/-J.ii~'
" ~'::;,~, ,",', M .,,",;,...),. 'je'u?' ,t::NF""~.."~,,,
......1- (..:::."1:;~..~,,,-_\\f~\(~ '" fr.,.-y;.~..t'.;\.<-:- -,......
l" ~,","'~\~:\' 56-"'~,:A...~ \)
z:.. c.;;-,r:~'~,~', ~~~,"C..-~;.'...~...
<C X ~Ij q""" "''''''7 '0 q
John L. Hawkins, President
Mira Mar Development Corp.
6003 Sunderland Drive
Colleyville, Texas 76034
Re: Alexander Court
Street Sign Fee Assessment
Dear Mr. Hawkins:
Enclosed with this letter is the street sign assessment for Alexander Court. Prior to final
acceptance of this project, a check in the amount of $380.19 should be made payable to
the City of Coppell and forwarded to the Engineering Department, along with a copy of
this street sign fee assessment letter. The Engineering Department will process the
payment and notify the Finance Director to ensure successful completion of this project.
If you have any questions, please contact me at your convenience.
Sincerely,
~~M-
Kenneth M. Griffin, P.E.
Director of Engineer/Public Works
Office Phone: (972) 304-3686
Fax: (972) 304-7041
e-mail: kgriffin@ci.coppell.tx.us
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
~
CRB 111-3
City of Co
255 Parkwa ppell
Coppell T Y Boulevard
972i46~~~~:019
I
I I i
I I I
I I
II r
'II ~
I ~ j
Ilj~_,
r~=>7~==~~~.'iI5;'Zl'='-~--
I ~g b:i ~~~ "~i
1:'1,: R ~mi~!',
i:I:': I",r
" '
~ ~ '
~ -; h j'~i\) I
~Df..( ~" ·
~r;, ; ~ ~!g Q i ~ "
"".... !"n~ r+ I I
. '" '"' _ t
l~ " h. ~~> gO!
'.~' -. IJ I 'O~ ::J I
I, ,," A;:'
,- -
,,0 0"": ,I,
t,- 0 o8l> !
~l: '" ~' rW',~
" _ " ~ w ;: I
:~~':, ~ ~ &' ~ ~ ~ S;~:ii~.
I~ I ,~ !f1 ~ C r
il ~ ') J'; r:. ~>m i
i~ ~ I ~~'~ ~o ~~~ r.
~ ~ ~~O I
~ .JJ I ' m~ I
I"' t'-I !
~("\ii,, :: ~i~ I ,,:',
, 0 ~
~ LI1 ~ .~
I', - I
~ .' i
II "' :
1~ 0 ,I ,~
:~! 0 I I~
. '
rl I 0 f
~ > i
~ ~'
tl Ilf "- t~
.1 .~ I '
r .!
I I L I~ !
~ ~ <>'l I~ I
,~. ~ 't,f:h I !r-
" ~ ~ .
~ w I\.: i
,,] ~"'
I 8>'-.) ~ '
~i, HI ~l' ~ ~ ~:
I~~ H ~ ~ 3 '" \
- -~ . . ~ '" '
- ~-'-''''''~~:''''''''''''''''","~~~''''''''I,=~~~~=--g;;~!
r-
,-
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
DATE:
May 1, 2008
Kenneth Griffin, P.E., Director of Engineering I Public Works
TO:
FROM:
Per Birdsall, Traffic Control I Streets Operations Manager
RE: Street Division Sign Fee For - Alexander Court
The following fee should be assessed and collected on the above referenced project. 1 00% due prior
to final acceptance of project.
Street Sians Fee
The following assessment is being made in accordance with the City of C()ppell Subdiyision
Ordinance Appendix A Chapter VIII A. The following costs of those sign materials required are
based on current pricing which is reviewed on a regular basis.
SIGN
UNIT PRICE
No Parking
$68.91
Speed Limit
$70.99
$72.51
Street Names
Yield - wlnames
$136.67
Stop - wI names
$123.05
Warning Sign
$80.83
$70.99
Keep Right(median)
Object Markers(L&R)
$45.97
SIGN "NO OUTLET'
SIGN
OTHER.
LABOR
$15.00
5% Adminstrative Cost
$0.05
* cost breakdowns may be obtained by written request
Sign Fee
QUANTITY EXTENDED PRICE
Q $0.00
1 $70.99
Q $0.00
Q $0.00
~ $246.10
Q. $0.00
Q $0.00
Q $0.00
Q $0.00
Q $0.00
~ $45.00
$362.09 $18.10
T.OTAL $380.19
Revised 4/2104
/'
THE.CiTY.OF
,.,t'
-.
COPPELL
~.~ ~.(,;,l;~:; l;,~~', (''',','111'2,'\,'-';/ ,~
v ~ "'''.'' '" ,\ \1':3 ~ ' \L
"f"" 8-"'~,,,:-.:, "''','':"~,',x"'''/'",, ~.~ -r.
/' .. ,.l";''''''v' -'., ",y y.:(~;JJ
I: -:-~~/ : ~-...- q \)
, 1\ [, , , \ I'>
February 6, 2008
John L. Hawkins, President
Mira Mar Development Corp.
6003 Sunderland Drive
Colleyville, TX 76034
RE: Alexander Court Subdivision
Street Light Fee Assessment
Dear Mr. Hawkins:
The following assessment represents the number of light units as established by Oncor Electric
Delivery Company for Alexander Court Subdivision:
4 lights @ $292.60 per light = $1,170.40
Prior to the final acceptance of this project, a check in the amount of $1,170.40 should be made
payable to the City of Coppell and forwarded to the Engineering Department.
If you have any questions, or need any additional information or clarification, please feel free to
contact me at your convenience.
Si~:,t1Jv
Kenneth M. Griffin, P.E.
Director of Engineer/Public Works
Office Phone: (972) 304-3686
Fax: (972) 304-7041
E-mail: kgriffin@ci.coppell.tx.us
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
f-
I"=-~=_~,~-;....~",",____~_n.,,,,,_..,..~_='r"_n'~~~==~_..~'~--='~--"""",~"'""""""""'.._~--=...'\
I I. .. D".~/LZI-t?X---------- 073406 J
\ " m ! """e;ved fmm ._--~.~.~&~"''>l------.-..-._.-_.--~--..~---i
_ ell,... ! . ~
1 t ~ ~ Add'oS' ..8klS:~-D.eR-_-C.L--.--.-------_.---~~-c----l
8 ~ ~ N ~_---~---~--- Doll.". ~Ll1
'5 ~:~ Fo, '5~~ .uGftr _AsseSS/AkI:!-r .. .. .-." .'.
::>. ell Q) ,... '. . '.' . ... . .,
.. Cl. a. al. .. ...
._ a. .. '.'
" ~ 8;l;" ------..--.----..-~- . ..
.. ~;;:, l 1-.":"'-- _ _f-------~c---~
l __~~~~~l' LZ~l!:t-cl .CHE~__t/L ~ ~. . . d". '.~
! _" '. .',' -, n' I - \ . . . .
BAL,\NC. I Ir."NEYORU,JI.-j , By__ - -. - .--.---------
_.=~J.;;.~--~I.=-1-...-..~t~~~~~J;J-~.,,'-,.J.-~......-.-=.~~~.,=-~~-="~----,,~~;,~.....,~~~""""...-----~
:~-~.14m~~~~.-
. ,;"_;,,,~ ~.;.:.-,,-- .~;.~:.:-.l>....-.;.~,---~-'_;,~
"w..- ,~.,-L..;; ~-_:J.l.-.;-;:; "':";' -';'--;;;-;;:;',1) ;r.;.rrx'_
~.:.~;..~:.-';_L~-;-;--' .,-.:-~ -'1M":- ..,'" ' ..;:.~:,,:... ':'''r:-:-,;;:=-~'-.-;;..;~,-
113 8 II
. i
MIRAMAR DEVELOPMENT CORPORATION
6003 SUNDERLAND DRIVE
COLLEYVILLE, TX 76034
DATE3
-/4 -()8 88-9353-1131
$ J/'l{)~
DO LaRS 9- =,..~..
L!J 0.,.." "u 1Iu.
.-
cltlbankO
.; FOR h, G/-. ~~\Tj~'j ~ e 1b5C'5511 ett7:-:------
~~~L"~~~..,.,.,,~~~~~811... I:~ ~_~ . g ~ 5 ~ 21: g 77 .0 5 ~ 70011----- ! i
~.. _:!"""'_"c=--="-~l=,r:~,=-=-~-=o:j,-,',,"-_-~J'~l1L.'_~~;;C.-~~~::~--....-r^=,-=,~",,=~i
PAY
TO THE
! I ORDER OF
:!.
,~
T E.CITY.OF
COPPELL
Ii
Tim Bennett
Tim Bennett Engineering
203 Jackson Street
Wylie, Texas 75098
RE: Alexander Court
Fee Assessment Letter (revision of meter)
Dear Mr. Bennett
August 17, 2007
Enclosed is a revision of a copy of the City of Coppell Development Fee Assessment table, along with a
copy of the Development Fee calculations for the referenced development. The water meters have been
reduced from a 1" to a 5/8". The fee assessment table reflects the change in the meter sizes and the
impact fees associated with them.
The fees for water and sewer taps, and for the final utility inspection need to be paid by check at the
Public Works Service Center, 816 S. Coppell Road. Fees for the water meters and meter deposits should
be paid by separate check to the Building Inspections Department, 500 Southwestern Blvd. Meters will
be ordered when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely, ,
'X ~ Jl..{t--'
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * P,O,BOX 9478 * COPPELL TX 75019 * TEL 972/4620022 * FAX 972/304 3673
,--..
L~VELOPMENT FEE TABLE
Project: Alexander Court
Date: 6/8/2007 rev(8/17/2007)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $26,100.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $1,450.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $730.80
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $870.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $26,100.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $1,450.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,450.00
(100% due at Issuance of Building Permit)
Park Fee $37,265.00 $37,265.00
(100% due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOT AL II $95,415.80 I
TOT AL AMOUNT DUE PRIOR TO FILING FINAL PLAT $37,265.00
DL.. JELCn....MENT FEE WORKSHEt:T
~
PROJECT:
DATE:
Alexander Court
6/8/2007 rev(8/17/2007)
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
29 - 5/8 inch X 3/4 inch =
o =
o =
o =
Fireline Meter(s):
Total #:
29 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fce:
Total #:
29
o
o
29 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 29 Domestic Meter(s) @ $25.20
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: nla Fireline Meter(s) @
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 29 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$0.00
$0.00
$0.00
ESU's
ESU's
ESU's
ESU's
$26,100.00
$1,450.00
$730.80
$0.00
$0.00
meter provided by developer
$870.00
$0.00
Wastewater Impact Fee:
Total Domestic Meters ESU's: 29 @ $900.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 29 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 29 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
Page 1
$26,100.00
$1,450.00
$1,450.00
Dt.. vELOt"MENT FEE WORKSHEt:T
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
29 Single-family @ $1,285.00 per lot
o Multi-family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Zone 1
$37,265.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available
---.
ROAL~AY IMPACT FEE CALCULA'rl0NS
PROJECT:
DATE:
Alexander Court
6/8/2007 rev(8/17/2007)
ROADW A Y IMPACT FEE:
Service Area * I
Category ** Residential
Land Use ** Residential (Medium/Low)
No. Lots/Units 29
Development Units ** 29.00
Vehicle Miles per Development Unit ** 4.24
Fee per Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $18,
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
6311 Sq. Ft of land to be dedicated as R.O. W by the plat, the property value per the Dallas
County Appraisal District is $3.44/sq.ft. For a credit of 6311X$3.44 = $21709.84.
Percent of Credit Toward Roadway Impact Fees
Total Credit
l...... H'A.MO(Jlj1'.P(/E/H)>
100%
$18,444.00
. .:/:${L()OI
,r-.
,-.....,
~.~
THE.CiTY.OF
COPPELL
July 25, 2007
Tim Bennett, P.E.
Bennett Engineering
203 Jackson Street
Wylie, Texas 75098
RE: Alexander Court
Fee Assessment Letter
Dear Mr. Bennett
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City ofCoppell in the amount of$37,265.00 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer
Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the
Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified.
The construction inspection fees must be paid prior to scheduling a pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely, .
'K~ M-
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
John Hawkins, Mira Mar Development Corp.
255 PARKWAY * P.O.BOX 947B * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
r-
DEVELOPMENT FEE TABLE
Project: Alexander Court
Date: 6/8/2007
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $43,587.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $1,450.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,895.44
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationlFireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $870.00
(100% due at Issuance of Water Meter)
IrrigationlFireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $43,587.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $1,450.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,450.00
(100% due at Issuance of Building Permit)
Park Fee $37,265.00 $37,265.00
(100% due prior to Filing Plat)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOT AL II $131,554.441
TOT AL AMOUNT DUE PRIOR TO FILING FINAL PLAT $37,265.00
~
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Alexander Court
6/8/2007
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
29 - 1 inch
o
o
o
= 48.43 ESU's
= ESU's
= 0 ESU's
= 0 ESU's
Total #: 48.43 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
$43,587.00
Water Tap Inspection Fee:
Total #:
29 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$1,450.00
Domestic Water Meter Fee:
Total #: 29 Domestic Meter(s) @ $65.36
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$1,895.44
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: n/a Fireline Meter(s) @
(100% due prior to issuance of water meters)
$0.00
$0.00
$0.00
$0.00
$0.00
meter provided by developer
Domestic Water Meter Deposit Fee:
Total #: 29 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$870.00
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$0.00
Wastewater Impact Fee:
Total Domestic Meters ESU's: 48.43 @ $900.00 ea.
(Due prior to issuance of building permit)
$43,587.00
Wastewater Tap Inspection Fee:
Total #: 29 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
$1,450.00
Utility Final Inspection Fee (All developments):
Total #: 29 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$1,450.00
Park Fee (For Residential Developments Only):
Page 1
r--
--
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
29 Single-family @ $1,285.00 per lot
o Multi-family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Zone 1
$37,265.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available
r-
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Alexander Court
6/8/2007
ROADW A Y IMPACT FEE:
Service Area * I
Category * * Residential
Land Use ** Residential (Medium/Low)
No. Lots/Units 29
Development Units ** 29.00
Vehicle Miles per Development Unit ** 4.24
Fee per Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $18,444.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
6311 Sq. Ft of land to be dedicated as R.O. W by the plat, the property value per the Dallas
County Appraisal District is $3.44/sq.ft. For a credit of 6311X$3.44 = $21709.84.
Percent of Credit Toward Roadway Impact Fees
Total Credit
h HA'MOUNTt)UE:/<
100%
$18,444.00
.............................. .$()LOQ. .~
~
~
.................- .. ............
THE.CITY.OF
-..
!!!!!!!!!!!!!!!
,;:.::~;~;~: ~\".l. fit ~;~4i"
~,- . (i.:"~7.~.~~\:. f, . /~/~~;!.u.:. ~
./' ~~e' ~~,...3J _/- ~.;tfM...~ \)
e ; .~~~. ~~i~.<\~~; :~ Q
A <5 \
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant: 441 i- OJ Md.,.. Dl? v, Cg;>r f I Date Submitted: 8 -- ~ -0 ?
Address of Applicant: ~o: '2,~~;:C';-lc9/}~ &;~:/~ ~~::D31-
Phone Number: 9/'l-- ~- AX NUMBER: ~ - -
Location of Construction (address, if available): M,W f!EJr, 8e/he / cf lJe/>IM ~
f)/e"K8/ldf!r- (!()(JrT
Subdivision Section # Block # Lot #
OR
Survey/Abstract #
Location description (attach vicinity map):
Acreage
1. Type of proposed construction or development:
evrResidential ( ) Alteration of a natural waterway drainage course
( ) Non-residential ( ) Other (describe & attach drawing or sketch)
v(' Placement of Fill (in right-oj-way or on private property)
2. Description of Construction Permit requested:
(v(Paving ( ) Median or Landscaping ) Box Culvert
) Sidewalk (y{' Water Main ( ) Rip Rap
) Drive Approach
(v(Excavation
( ) Fire Lane
(, ,) Bridge
(0R.C.P.
v5'" Sanitary Sewer Main
( ) Flume
0' Inlet
( ) Fill Area
( ) Drainage Channel Excavation
( ) Slope Protection/Retaining Wall
( ) Parking Lot
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3. All construction shall be in compliance with, but not limited to, the City of Coppell
Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans.
The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
4. Applicant shall provide a copy of approved plans, specifications and related cost estimate or
contract for the purpose of permit fee calculation verification.
,-/-
CONSTRUCTION DEVELO~__jENT PERMIT APPLICATION
/""".
/
Page 2
5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance
with the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
.& ~ II I '39,. QA. .J-/;;:::. g., -O..!:::l ('A"iIj'1> '5 :' t' rI ~ t!) 8 ;<"') r7
Amount Due: $ .J.O t .:...) ~ .::;; L' Date Paid: 0 - -t+./ (
,
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right-of-way not approved by the City Engineer.
~ Any work requiring closure of a lane of traffic, street, or alley must be approved
in advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600
Fire Department @ 972-304-3500
Street Department @ 972-462-5150
Engineering Dept. @ 972-304-3679
~ Attach barricade plan / trench safety plan of a lane or street closure. (Required)
NOTE: Street closures are allowed from 9:00 a.m. until 3:00 p.m. ONLY unless otherwise approved
by City Engineer.
~ A pre-construction meeting is required prior to beginning work related to this permit. .
Contact the inspector assigned to your project to schedule the meeting.
'\
John ~ . f!c9wklns
8/1J-8'3tP -G~?J8
Signature of Applica
-hY~j~e~~
Printed Name
Contact Number
Contact Number(s)
FOR CITY USE ONLY
(~ES
( ) NO
Is the fill area located in an identified flood hazard area?
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required?
Are other federal, state, or local permits required?
( ) YES
( ) YES
( )NO
( )NO
( ) PERMIT APPLICATION APPROVED () PERMIT APPLICATION DENIED
City Approval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out oj the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
>
to
It...
I
*
'"
~
I
\<1
I
~
Eo--
~
~
==
rf1
Z
o
-
Eo-
<
~
;J
u
~
<
u
~
~
~
z
o
-
Eo--
U
~
~
rf1
Z
~
~
Eo-
<
Q
/""'-.
~
~
<
Z
Eo-
U
~
~
o
~
~
-=- C .-J
>.................
..D~O
.0 u
-0 r.......
~~.g
U O)E 0)
u ,...
~t::~
C CIl 0)
.- 0. I-<
-00)..8
C Q 0)
CIl OO..D
~.5 5
U I-<
~ 0) C
.- 0) 0
E .S U
I-< 00 ~
O)C'"O
o.~ 0)
Il) 0) I-<
.o..cCll
o ....... Vl
..... >. 0)
",.o~
E -0 C
Il) u 0
:::: U .;::
0) U
0) 0. 0)
...cCl'lo.
...... C '"
,-'- C
ou-
.0 .
cno...c
o ....... t::
U CI'l..8
0) E 0
-5 ~ '"
'- .~ -0
O...c c
..... CIl
~ '- '"
'<:T 0 E
>.~ 2
ro 0 '"
0. C"'l >.
>.'"
==~aJ
roo.oo
...c _ ro
"'- C
ro ._
... ...c ro
Co) CI'l ...
0.1-<-0
o <1.l U
Qj 0.......
;> 0 ro
<1.l v'~
Cl ;> ...
0) 0.
~ Q vi'
...... Il) .~
r ..c .-=:
t;j!-:z;
o . ~
''::;: >. Il)
C\S .": ......
::;U~
00 Il) .-
Il)..c: ...
cG.....O'
..... 0 vi'
..... ..... ......
,2 -0 B
.~ 2 00
;> ro C
.- u.-
'"0 .- ~
.0'"0...
~ 0) ro
C/) '"0 0.
==]~
Il) CIl..c: .
E:..... U ~
O C ~.-
<1.l CI'l ......
U E >. <1.l
...... ..... Il)
'- 1-<' - ""
oroU~
>.frll)c
.-=: r'\ ...c .2
u................
OOOU
u C ..... 2
..c: .- "0 .....
..... t 0) Vl
I-< 0) ..... C
u C ro 0
0...... U U
000- I
CI'l C -g e
<l::~"Oo.-
~
~
-
c.
E
o
c:.I
-=
.-<;:::
~
-
CJ
CIJ
-=
rIJ
"C rIJ
~=
~ <1.l
c.E
rIJ CIJ
rIJ ~
.- 0
-= I.
- C.
"C e
= .-
l.'S 0Jl
=
_.-
~~
't,s
l.'S-
.:~
= CIJ
0-=
c:.I -
-
- c:.I
= =
CIJ I.
e t;
c.=
o 0
~ c:.I
~ 0
CIJ -
"C-
rIJ
CIJ 0
-= c:.I
- CJ
..-=
0-
CIJ
~-
c.5
o .-
c:.I"C
=
l.'S ....
C1J~
"C =
.- 0
~-=
~ rIJ
c.';j'
-
CJ -
rIJ c:.I
l.'S l.'S
CIJ I.
- -
0.=
o
~c:.I
= CJ
"C'=
CJE-<
~...:
c.
= CJ
.5! ~
- 0Jl
~ =
~'i:
= ~
.- =
CIJ ....
-=0Jl
- =
~
cCCIJ
.... -=
~ -
~ B
o rIJ
- =
I. .5!
CIJ -
"C l.'S
1.-
o =
~
= l.'S
_ c:.I
--------
c<)
c:.>
~
~
Q..
II ~
~
c ~
M
~ 6}' ~
,....
rJ) --,
~
~~
~~
~;J CJ
~O
:>~
0< \\) (S)
c=:~
i:..u " ~
~< ~
-c:r::
~~
~~ "
<0 €\
2::u ~
c=:
c..
(A
Ll) 6) ~ -
C't) ~
II Ln
~ ~ 6) ..J
c N t\\ ~
~ ('f) Q) ~
~ f-t
~ ~ 0
~ ci t\f ~ .- f-t
'-... Q
Z
~
l-'
r.n
~~
z~
w;J ~
~o ~ ~
w~ ~
6<
C=:~ ~ ~
i:..U t() t::
:;<
-c=: ... ~ ~~
u~ ~ \f)
-~ \S
..Jo l!)
=u \'<) C\l
:J
i:.. ~ ...........
~ -
..<::: E
..
...
cG '"ti ~
~ C
..J ...
~ cG ~ -< E
(..LJ ~ Co
f-t 0
C/) ~ C/) Oi
~ 0 ..
>- ~ ~ OJ
cG C/) ......J E-< Q
C/) <l:: c
0 cG <t: ~ >- ~ cG .~
~ ~ !- ~ W ...
!- ..- ~ =r: ~
> <l:: Z 0 ......J 9 !- .t:
<l:: <l:: !- ......J '"
~ 0 c
0.- C/) C/) <( C/) 0
u
"'J
r--< . . --...
_,arson Utilities, Inc
PROPOSAL
To: Mira Mar Development Co
817-996-6698 Fax 817-329-1792
Altn: John Hawkins
06/18107
Revised per 6/18/07
exCLUDES:
Engineering & Inspection Fees
INCLUDES: .
Sales Tax 00 Noo-lI1lllllPOlllled Job M_~dt '
-.I -
Clearing, Grubbing, Earthwork or Final
Staking or Geotechnical Testing
Erosion Control
Storm Water Pollution Prevention Plan and Reporting
Construction Material Testing
Landscaping/Irrigation Repair.
In-UP
.....-...,
Excess material t rt ensile- No Hauloff
Using Seconds tonn Hanson Pipe
"-
Payments shall be made on measured quantities of work completed. Work completed wiD be billed on the 25th of each month
with payment due by the 1 Oth of the following month. Partial payments shall be made monthly for 90% of the work completed
during the preceding month. Final payment shall be made in cash upon completion or partial completion, with interest at
maximum allowed by law charged thirty days thereafter. Stoppage of work for the convenience of the customer shall be
considered as partial cOmpletion and full payment shall be due for all work done.
Accepted: .. . q
Date: . JVf)fJ I~ '2007
5326 W, Ledbetter
Dallas, TX 75236
214-941-9700 Ext 3tJ4
Fax 214-941-8533
--
STANDARD CONSTRUCTION CONTRACT
STATE OF TEXAS S
S
COUNTY OF TARRANT S
KNOW ALL MEN BY THESE PRESENTS:
THIS CONTRACT is made and entered into on this the 23rd day of June, 2007, by and between Mira
Mar Development Corporation (hereinafter referred to as "Owner") and James B. Arnold
Construction. Inc. (hereinafter referred to as "Contractor"). In consideration of the mutual covenants
. hereinafter set forth, the Owner and Contractor agree as follows:
Article I. Work
The Contractor shall perform all of the work as specified in the Contract Documents. The work
is generally described as follows:
ALEXANDER COURT - COPPEll, TEXAS
Phase I Clearing and Excavation
Plans and Specifications prepared by: Tim Bennett Enaineerina.
All work shall be performed as specified or indicated in the Contract Documents; and, at the
Contractor's own cost and expense. the Contractor shall furnish all the materials, supplies,
machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services
as may be necessary in order to complete the construction, as described above and in accordance
with the Contract Documents unless otherwise agreed to by the Owner.
Article II. Contract Documents
The Contract Documents may only be altered, amended or modified as provided in the
General Conditions. The Contract Documents consist of: this written agreement setting forth the work
to be performed; advertisement, if any; instructions to bidders, if any; proposal; addendum;
specifications, including the general, special, and technical conditions, provisions, plans, or working
drawings; any supplemental changes or agreements pertaining to the work or materials therefore;
bonds; the Standard Specifications for Public Works Construction published by the North Central
Texas Council of Governments, as amended; ~nd, any additional documents incorporated by
reference. These form the Contract Documents and all are as fully a part of the Contract as if
attached to this agreement or repeated herein.
Article III. Contract Time
The Contractor shall perform and complete all the items of work listed and referred to in the
Contract Documents within 30 working days.
Article IV. Contract Price
The Owner shall .pay the Contractor the sum of $96,180.00 per the attached Proposal,
EXHIBIT 'A', for completion of the work in accordance with the Contract Documents using current
funds. Such payments shall be subject to the General and Special Conditions to the. Contract, as
contained in the Contract Documents.
Page 1 of 2
~
Article V. Miscellaneous Provisions
The terms used in this Contract shall have the same meaning as designated in the General
Provisions of the Standard Specifications for Public Works Construction, North Central Texas Council
of Governments, as amended~ The Contract Documents, which constitute the entire agreement
between the Owner and Contractor, are listed in Article II. No assignment by either party hereto of
any rights under or interests in the Contract Documents will be binding on the other party hereto
without the written consent of the party" sought to be bound. The Owner and Contractor each binds
itself, its partners, successors-,- -assigns-,-nand-- -Iegal-. -representatives- nhereto" to-- -the --covenants,
agreements, and obligations contained in the Contract Documents.
IN WITNESS WHEREOF. the Owner and Contractor have executed this Contract on the date
aforementioned. All portions of the Contract Documents have been signed or identified by the Owner
and Contractor.
CONTRACTOR:
James B. Arnold Construction, Inc.
OWNER:
Mira Mar Development Corp~
By: James B. Arnold
Title: President
cp - Z5 -()'l
~JJ~
BY:A If"f
Title: rreslcten "
~Mr~L!~
Page 2 of 2
r--.
EXHIBIT 'A'
dlil
DATE June 23, 2007 (Rev 07/08/07)
TO: John Hawkins
Mira Mar Development Corp.
6003 Sunderland Drive
Colleyville, Tx 76034
PROJECT: Alexander Court
Phase I
Coppell, Tx
James B. Arnold Con..truction, Incorporated proposes to furnish equipment, labor, and material.. to perform the following work.
REVISED PROPOSAL I
ITEM DESCRIPTION
I Mobilizationlclear/chip/strip/fence removals/incidentals
2 Haulofftimber chippings (Actual load count may change)
3 Wire Back Silt Fence
4 Rock Construction Entrance
5 Excavation
6 Rough lot grading
7 Final Lot Benching
8
9
10
II
12
13
14
UNIT UANT/Tr UNIT PRICE I
LS 1.0 38,400.00
LD 40.0 400.00
LF 1,800.0 1.60
EA 1.0 1,500.00
CY 13,420.0 2.50
EA 14.0 100.00
EA 14.0 175.00
AMOUNT
I
$38,400.00
16,000.00
2,880.00
1,500.00
33,550.00
1,400.00
2,450.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
$96,180.00 I
NOTE:
A fuel surcharge may be added to the cost during the time
of construction due to fluctuation in diesel fuel prices.
TOTAL
TERMS AND CONDITIONS
This propiisal and its tenDS and conditions shall become an integral part of any contract and/or subcontract agreement. This proposal in its
entirety shall be correct and binding upon both parties in case of any discrepancies between any contract, subcontract, or other form of
. agreement's scope of work, pricing, wording, tenDS, or conditions.
Payment tenDS are Net 30 days.
The above prices are based on two move ins only.
SWPPP plan preparation, permits, implementation & reporting is not included.
No bonds, testing, demolition, surveying, permits, fees, concrete/asphalt sawing or traffic control is included.
Clearing is based upon hauling timber chippings off-site.
No grassing is included.
No dirt import or haul off is included. Excess excavation stockpiled on lots 9/10/22/23.
Grade checking and bluetopping for JBA scope of work is included.
No structural excavation or backfilling is included.
No landscape fUle grading is included.
No underCutting, select fill, moisture conditioning, lime or other paving/pad subgrade stabilization is included.
No spoil cleanup or grading after utility, paving, building, or other construction is included except for fmallot benching.
Paving and pad subgrade will be graded to XO.IO foot. Fine grading by paving contractor.
Owner or Engineer to provide horizontaVvertical control and verification of paving/pad subgrades prior to start of other construction.
JBA assumes no responsibility for damages to utilities or other objects buried or otherwise hidden from sigbt that are not clearly marked
prior to move in.
Any unsuitable material (rock, buried debris, etc.) encountered during excavation will be done at equipment hourly rates.
JAMES B. ARNOLD CONSTRUCTION, INC.
~~~
Gene Gallaher
Estimator
JAMES B. ARNOLD CONSTRUCTION, INC.
P.O. BOX 92877 SOUTHLAKE, TEXAS 76092
OFFICE 817-416-7485
FAX 817-416-0705
-------
---.
'.I~
I
MIRA MAR DEVELOPMENT CORP.
6003 SUNDERLAND DRIVE
. COLLEYVILLE. TX 76034'
"-'''~''!': ~ "". . 5195-'1
ara$-8-6'?'.
>:
.! ~,C>1;t "'~ CO/>~.~// ... . I $/S;~23f*
.! Ff~~:=::::7~~j,(rft;~;~~ ~ e~
. Wachovia Bank, N.A. /L> J ,T!J)'" .:
" WBchovla.com , (/'7RJt.JSt'eU . .
~4/8)(. ef, Ct'Jfl.<; I; Perm-i l-,Eee
,I:. ..0.5.5.91: 20000.92. 2L.L. 7111 5.9
.: ~j.
. ~.- -- -. _. - - - 0- '"'= '"'" ~.:.--:. ...,.,... _":._ ~,-, ~ ""_, .-:". ~",.. _ _ __ __ __ __ ____ __ _ _ __ __ _ _.. _ _. _ _ _. __ .__ ___ _ .__ _ _. __ _ _ _,_._ ._. ._
r . . .
I
I
I
I
I
I
I
I
JJ~I
,J
'3,.
e~J
CASH
RECEIPT
Redelvedf'romV\
;;t~Ji~:.~<r,J.~'!:>;>::;;:'"
;;<'f:'. ::';';.)'j: . . . . : \ ;, ,:F).. ."..
^",', /'
------
....--'.
" ,~~-.=-_____u__________~___
\~
I (' MIRA MAR DEVELOPMENT CORP.
I 6003 SUNDERLAND DRIVE
I COLLEYVILLE, TX 76034 ~ 8-& -/9 '?
II LJe// $5 C?tpf~
!I A~:edsM" StXlo/~ 6l s.::
~I - ':J
~, ~~ ~r.HO;-':TT'"
!I ~ 'Y~
I Wachovia Bank, NA
I wachovia.com
!JlMij]])lldd ,'!/t:1(} DfJiLsi fllfJ,Eee---____
! 1:...O.S.Sgl:20000.g2.2......?II. S.gl;
L___
32-1515-1110
------------ ---:~ -)
1~ 519 6-~:i
W< ~ 1
p-'--
!
I
!
---------.
CASH
RECEIPT
.1';.:
.:' ;~'..~:<",.:;'~-:-:,'.'~~,)- ,.-; ."; 'c.:':, '-"";, '. '~t'.>(;:3:
,". ..-'-~ .-(:, -". ,..:: ,- ~ ~ "" /
t':':'.
. ';/.
I'
I
I
I
I
I
i
EO) }"-':".
~ Cll~
l.!lll~
Q. g "-
oro[(l
(.) >-~~
_ ~ f-..,.
O-c=-C\j
:r: &. 2i. S;
- c.
(JU)8
~
'''I
'::
i-
!~
iu
BAlANCE
. DUE
I '2ffi~Q~'":w~,~,-~"'~'~'
I ~~:~gi~~:~~s~~.~ I, 83~125~~~OP,~\ * .~ *
~'****THIRTY-SEVEN;THOUSA~~ TWO HUNDRED
~ PAY" " '.
I i~~' ****City of Coppell****
) ORDER
l":OF,
I "'NAME OF REMITTER /'Ii tamar Development Corporations
I AOqRESS
r
,
!
i
I
I
I
I
I
I
I
I
I
,
I
I
I
I
I
~_.- -
"Cm
lhij
8~1,
oI~~
~Q.I6i
(,)~8
,"-'"
.
""
-'
'.'~'. ::.:c-. ::-.-. ,~_~ ..",. :::.:;. ...:..:. ::..:. ..-..0: :.._.:. := ._. '__
CASH
RECEIPT
- -- - -- -. -....., ~ .......... -
., '
~HOLO OOCUMENT,UP.TO,THE L1GH.r"TO.V1EW..TRUE WA.TERMARK00'"
. ~~'.) 836125942' 'C<
I 10-86
\ '2~
OAiE 0 7 I 2 6 I 0 .~7 {J
6: 5 .;0 0* * * ~
( '\ ;/ ,
DOLLARS****
372
SIXTY-FIVE
/
~.; \.
-'I
!
,
/
/
,
''''....t
,
,
~ -""
F..IV'"
t =.'-on
.'-....
DRAWER: Cltlbank, N.A.
i:~~ '
M'
Pdt'/<. Fee
Issued by Integrated Payment Systems Inc., E~glewood, Colorado, To Citibank, N.A., Buffalo, NY
III ? q 200 2111 @ 0 2 2000 B b B I: 2 BOO B ~ b ~ 2 5 q ~ 2 5 III
~
DEVELOPMENT FEES
PROJECT NAME: Alexander Court R€\JISED
ENGINEER: Bennett Engineering
ORIGINATION DATE: 5/2/2007
SENT ASSESSMENT ASSESSED FEE AMOUNT PAle DATE
Water Impact Fee $26,100.00
Wastewater Impact Fee $26,100.00
Park Fee $37,265.00
Roadwaylmpac~Zone
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspectio
Flood Study Rev, $2,000.00 $2,000.00 ra 5/2/2007
Water Tap Inspection $1,450.00
Wastewater }{p Inspection $1,450.00
Water Met~r (Domestic) $730.80
Water Met~r (Fire/lrrig) $0.00
Meter ~posit (Domestic) $870.00
MetelDeposit (Fire/lrrig) $0.00
/' $1,450.00
Utility Final Inspection
/
Subtotal to Eng. $39,265.00 $2,000.00 $37,265.00
/ Total Fees Fees Paid Amount Owed
TOTALS $97,415.80 $2,000.00 $95,415.80
/
/ NOTES
Prior To Construction Date Received Prior To Final Acceptance
Erosion Control Approved As Built Plan Reed.
E.P.A.-N.O.1. Reed. Paving Bond Reed.
/ Const. Plan Approved Utilities Bond Reed.
Erosion Control Maint.
--
DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIGINATION DATE:
Alexander Court
5/2/2007
///
SENT
ASSESSMENT
/'
DATE
ASSESSED FEE AMOUNT PAle //
,/,/
/
/
/
Street Light /
Construction InSpection/
EG or Bore permit/
/
O . I /.
vertlme nspectlon
Flood Study Review
Wate'l~p Inspection
Wastewater Tap Inspection
water Meter (Domestic)
r/Vater Meter (Fire/lrrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/lrrig)
Utility Final Inspection
Water Impact Fee
Wastewater Impact Fee
Park Fee
Roadway Impact-Zone
Street Sign
$2,000.00
$2,000.00 ra
5/2/2007
[' Subtotal to Eng.
$2,000.00
$2,000.00
$0.00
TOTALS
Total Fees
$2,000.00
Amount Owed
$0.00
Fees Paid
$2,000.00
Prior To Construction
Erosion Control Approved
E.PA-N.O.1. Reed.
Const. Plan Approved
NOTES
Date Received Prior To Final Acceptance
As Built Plan Reed.
Paving Bond Reed.
Utilities Bond Reed.
Erosion Control Maint.
"
-'-"\
!
~
~
~
~
/'
.
--.
.--
T H
E.CITY.OF
-.t:.
'-tr~ ~
-\l r-~
-i ~ ~ S
S~~4J
2- ) --
~) 4 0 ~
3: ~::t:..i\
.J::. .)
S' l7~
:>
0.2.6.1
V\-teJ2. ~.e+-
O+~~~&:V\j
Ov-Jy i\=)\C\V\~
b..! ~ '0-<.- p-e ltwI ,
CAY\ b.e. i '-.oS v e..e .
EARL Y GRADING I EXCA VA TION PERMIT
IN
GHT-OF-WAY I EASEMENT I PRIVATE PROPERTY
Date:
G-Z.5-C97
Grading plans provided and approved.
(Erosion Control must be installed prior to beginning work.)
Tree Removal Permit from Parks & Recreation Dept. required.
Hold Harmless Letter from the Property Owner/Engineer/Developer is attached.
if
@'
Project Name/Location: /7/t3X~r)d-eJ- C<Yvrf (L3f!lf!J~/ Rd)
General Contractor: /yf~i-dl M: ~:~
Permit issned to CompanylRepresentative: _ _ 'n7 _ -. . (}fJl) sf,
Address: ?, Q), B ~ X ?J Z 8 'lIT Enl>!-!; lake - ? ri e ?JZ
Telephone #: tfllJ-2e~~-14!?J1- Emergency Telephone #: 8/t;-4/~-?18.C:;-
General Description of work (provide copy of approved plans):
m_._.~__."-'_ jV;a~~(/t/J~X:;~r;L/I///-};t<?5 .}/7d .' ...~~.~
~ Was contact made with City and/or Utility Companies to locate existing utilities?
ijNO,R.asDIJ: Ne! 1((3'1t/I'.r.ed DYES ~NO
~ Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit?
if NO, Reason:
~ YES 0 NO
D. YES ~NO
~ Is removal of existing street, alleys, or sidewalks necessary?
if YES, Mach Bore/Street Cut/Saw Cut Permit
~ Is Floodplain Permit required?
o YES ~NO
if YES, Permit #
or date of City Council variance
il.,>-~jI.,.
. '," .... ;)<.
DATE
TIt'lE
06/26 08:24
.r"____
-.....
I,..
MESSAGE CONFIRMATION
06/26/2007 08:24
ID=CITY OF COPPELL ENGP. DEPT.
S,P-TIME DISTANT STATION ID MODE
PAGE:3
PESULT
00'29"
9724293963
CALL I t~G
01
OK
00E10
'''' "''':~I:''''-~ .