Loading...
Duke Lesley 3C-CS090316 THE.CITY'OF COPPELL March 16, 2009 C. Jack Evans, P.E. Pacheco Koch Consulting Engineers 8350 N. Central Expressway, Suite 1000 Dallas, TX 75206 RE: Duke Lesley Addition, Point West I, Lot 3 Block C (Expansion) Construction Plan Review Comments Dear Mr. Evans: The City of Coppell has reviewed the revised plans for the referenced addition and they have been approved. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, ~arza, E.I.T Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 E-mail mgarza@ci.coppell.tx.us 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673