Loading...
Duke Lesley 3C-CS090316 (2) THE.CITY.OF COPPELL *~- March 12, 2009 John Warren Duke Construction Company 14241 Dallas Parkway, Suite 1000 Dallas, TX 75254 RE: Point West I Expansion (Parking Lot & Drainage) Dear Mr. Warren: A pre-construction conference on the referenced project has been scheduled for Tuesday, March 17, 2009 at 9:00 a.m. in the lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Sincerely, ~~/~ Larry Davis, Construction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention Collin Snowden, Potter Concrete, FX: 214-689-1066 Scott Langham, Tri-Dal, FX: 817-481-8195 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 J 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner I owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the following parties: · Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) . Geotechnical firm . Project Engineer · Contractors or subcontractors for excavation, utility, & paving operations . SWPPP representative