Duke Lesley 3C-CS090316 (2)
THE.CITY.OF
COPPELL
*~-
March 12, 2009
John Warren
Duke Construction Company
14241 Dallas Parkway, Suite 1000
Dallas, TX 75254
RE: Point West I Expansion (Parking Lot & Drainage)
Dear Mr. Warren:
A pre-construction conference on the referenced project has been scheduled for Tuesday,
March 17, 2009 at 9:00 a.m. in the lobby conference room in Town Center at 255
Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincerely,
~~/~
Larry Davis, Construction Inspector
Office Phone: 972-304-3684
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Deputy Chief/Prevention
Collin Snowden, Potter Concrete, FX: 214-689-1066
Scott Langham, Tri-Dal, FX: 817-481-8195
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
J
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner I owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner / owner representative's responsibility to notify the following
parties:
· Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
. Geotechnical firm
. Project Engineer
· Contractors or subcontractors for excavation, utility, & paving operations
. SWPPP representative