Verizon-CS090129
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: GTE Shared Services Center Addition. Lot 1R1 and 1R2. Block 1. Replat.
being a replat of the GTE Shared Services Center Addition, Lot 1, Block 1 to allow
for separate ownership of each lot, requiring abandonment of existing fire lane and
revisions to various utility easements on 23.4 acres of property located at the north
east comer ofS.H. 121 and Canyon Drive, being represented by Andy Shafer, Halff
Associates.
STAFF REP.: Matt Steer PROJECT ID# RP-09-0003
DRC DATE: January 29,2009 - February 5,2009
CONTACT: Kenneth M. Griffin, P.E., Dir.of En/(ineerin/(/Public Works 972/304-3686
COMMENT STATUS: PRELIMINARY ./FINAL REVISED
~4FTER P&Z
1. Provide the city a copy of the sanitary sewer and mutual access agreements.