Loading...
Verizon-CS090219 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT GTE Shared Services Center Addition, Lots 1 Rl & 1 R2, Block 1 Replat P&Z HEARING DATE: C.C. HEARING DATE: STAFF REP.: LOCATION: SIZE OF AREA: CURRENT ZONING: REQUEST: APPLICANT: HISTORY: February 19, 2009 March 10, 2009 Matt S. steer, City Planner NEC of S.H. 121 and Canyon Drive 23.4 acres of property PD-1 71 R-HC, (Planned Development-171 Revised-Highway Commercial) A replot of the GTE Shared Services Center Addition, Lot 1, Block 1 to allow for separate ownership of each lot. requiring abandonment of existing fire lane and revisions to various utility easements. Owner: Surveyor: Daria Szalla Andrew Shafer SP4 750 Canyon, L.P. Halff Associates, Inc. 515 S. Flower Sf.. Suite 3100 3801 Parkwood Blvd., Suite 500 Los Angeles, CA 90071 Frisco, Texas 75034 Phone: (213) 683-4300 Phone: (214) 618-4570 FAX: (213) 683-4336 FAX: (214) 618-4574 A portion of the property was platted in 1981. The zoning on the property was changed from LI to HC in 1991. It was changed to PD-171-HC in September 1998, allowing for the creation of two new lots and to permit the development of two five-story office buildings on one lot (Lot 1). A Replot and ITEM # 6 Page 1 of 3 Minor Plat was approved at that time. The first of the buildings was constructed in 1999. The zoning was changed a third time in October 2000, allowing a revision to the previously approved signage. The second of the approved buildings has not been constructed. TRANSPORT AlION: SH 121 is an existing four-lane divided highway with two-lane service roads in a 440-foot-wide right-of-way. Canyon Drive is a 44-foot-wide concrete two-lane. street built within a 60 foot right-of-way. Coppell Road isa two-lane undivided road, with 37 feet of pavement within 50 feet of right-of-way adjacent to this tract. SURROUNDING LAND USE & ZONING: North- vacant; C (Commercial) South - vacant and office; HC (Highway Commercial) East - vacant; HC (Highway Commercial) West - DFW Trade Center; PD-136-L1 (Planned Development-136-Light. Industrial) & City of Grapevine COMPREHENSIVE PLAN: The Comprehensive Plan shows this property as suitable for Freeway Commercial and Light Industrial/Showroom Uses. DISCUSSION: This request is solely to replat Lot 1 , Block 1, of the GTE Shared Services Addition to allow for separate ownership and to abandon unneces.sary easements and to dedicate needed easements. Specifically, within Lot 1 R1 (currently vacant), a 24-foot fire lane easement is being abandoned (hatched) with the utility, water and Texas Power and Light easements adjacent to the roadways being retained. Within Lot 1 R2 (currently developed), only two small segments of the 24- foot fire lane easement are being abandoned on the western property line, and the remaining easements are retained with a six-foot expansion to the width of the 24-foot fire lane easement at the north and an 11-foot expansion to the width of the fire lane easement on the south. Finally, a ten-foot drainage easement is proposed at the south side of the subdivision extending from the common property line of the two lots a short distance to the east then south to Canyon Drive. This is strictly a ministerial replat request for the purpose of land sale and has no bearing on the ultimate land use of the property. ITEM # 6 Page 2 of 3 RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of Lot 1 R 1 & 1 R2, Block 1, GTE Shared Services Center Addition subject to the following conditions: 1) Revise title of subdivision within the City Secretary Signature Block to read "Lot ] R 1 & 1 R2, Block 1" in place of "Lot], Block ]". 2) Provide the city a copy of the sanitary sewer and mutual access agreements. ALTERNATIVES: 1. Recommend approval of the request 2. Recommend disapproval of the request 3. Recommend modification of the request ATTACHMENTS: 1. Replat ITEM # 6 Page 3 of 3