ST0003-CN090407CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT: Coppell Road Project # ST 00 -03
CONTRACTOR: Tiseo Paving Company
OWNER: City of Coppell
CHANGE ORDER NO.: Two (2) DATE: April 7, 2009 Pg 1 of 2
ADD:
Item Description
1. Additional 2" concrete depth for
Cooper Lane and Wilson Elem.
parking lot
2. Retaining Wall - full depth color
3. Adjust 3 x 3 drop inlet
Total Revision to Contract Amount
Quantity
Unit
Unit Price
Total
775
SY
$ 9.00
$6,975.00
1635 SF $1.90 $3,106.50
1 LS $1,430 $1,430.00
$11,511.50
CHANGE ORDER NO.: Two (2)
Previous contract amount
Net increase in contract amount Change Order #1
Net increase in contract amount Change Order #2
Revised contract amount
Net increase in contract time of completion
Contract time of completion
Pg2of2
$2,857,846.30
$21,565.50
$11,511.50
$2,890,923.30
0
365 Calendar Days
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract
by reason of this revision to the Contract.
4.8•
Recommended b ity Engineer Date
Agreed to by Cont=tor. Date �Q
Accepted b City Dad
J PAVING COMPANY
P.O. Box 270040 Dallas, Texas 75227 -0040 Telephone (972) 289 -0723 Fax (972) 216 -5637
Monday, December 22, 2008
City of Coppell
Engineering Department
Attn; Keith Marvin
255 Parkway Boulevard
P. O. Box 9478
Coppell, Texas 75019
Re: Coppell Road
� f
Per our conversation, the cost to install and additional 2" of concrete on Cooper Lane in
exchange of lime stabilizing is an additional $9.00 /SY. There is approximately 175syds.
As for the school parking lot there is approximately 600syds.
Please let me know on this.
Sincerely;
4" 6Z'46�
Robert Caudill
Vice President
EWW6l4&W 1974
Page 1 of 1
Keith Marvin - Coppell road
From: "Robert Caudill" <rcaudill(a,TiseoPaving.com>
To: "Keith Marvin" <kmarvin(aci.coppell.tx.us>
Date: 3/2/2009 3:49 PM
Subject: Coppell road
CC: "Robert Caudill" <rcaudill(a,TiseoPaving.com >, "Lance Smith" <lsmith@TiseoPaving.com>
Keith;
Here are the prices for the Form Liner Wall
1. Antique Cork C -26 (Color Only)
1,635 SFNF @ $1.90 /SFNF = $3,106.50
2. Form Liner (Sierra Dry Stack #439)
1,635 SF/VF @ $11.70/SF/VF = $19,129.50
3. Form Liner (Meramec Dry Stack #477)
1,635 SF/VF @ $10.95 /SFNF = $17,903.25
Let me know on this, as for added days we can talk about it later.
Robert Caudill
Vice President
Tiseo Paving Company
(972) 289 -0723
file://CADocuments and Settings \kmarvin \Local Settings \Temp \XPGrpWise \49AC000BCit... 4/7/2009
03/24/2009 13:38 9722165637 TISEO PAVING PAGE 02/03
:
PAVING
P.O. Box 270040 Dallas, Texas 75227 -0040 Telephone (972) 289 -0723 Fax (972) 216 -5637
March 24, 2009
Keitli Marvin, P.E.
City or Coppell
255 Parkway
Coppell, Texas 78019
Re: Coppell Road ST 00 -03
Acljust Grate Inlet
Mr. Marvin.,
Please see the attached request for additional work. We have attached. a breakdown from
North Texas Contracting for your review. An additional 1.0% for Tiseo Paving Co. is
requested below.
NTC $1,300.00
TISRO10% 130.00
TOTAL $1.,430.00
Sincerely
Lace Smith
Project Administrator
Ea4fi&ee6 1974
93/24/2009 13:38 9722165637 TISEO PAVING
North Texas Contracting, Inc.
Job Name: COPPELL ROAD 3/16/2009
Location: COPPELL, TX 9 :44 AM
Bid Cate: 6- Mar-08
Bid Time: 2 :00 PM
Unit
ADJUST GRATE INLET 2 VF
TOTAL. CHANGE AMOUNT $ 1,300.00
TOTAL ADDED DAYS FOR CHANGE 1 CAL
PAGE 03/03
Unit
Amount
0.00
0.00
0.00
0.00
650.00
1,300.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00