Loading...
ST0003-CN090407CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Coppell Road Project # ST 00 -03 CONTRACTOR: Tiseo Paving Company OWNER: City of Coppell CHANGE ORDER NO.: Two (2) DATE: April 7, 2009 Pg 1 of 2 ADD: Item Description 1. Additional 2" concrete depth for Cooper Lane and Wilson Elem. parking lot 2. Retaining Wall - full depth color 3. Adjust 3 x 3 drop inlet Total Revision to Contract Amount Quantity Unit Unit Price Total 775 SY $ 9.00 $6,975.00 1635 SF $1.90 $3,106.50 1 LS $1,430 $1,430.00 $11,511.50 CHANGE ORDER NO.: Two (2) Previous contract amount Net increase in contract amount Change Order #1 Net increase in contract amount Change Order #2 Revised contract amount Net increase in contract time of completion Contract time of completion Pg2of2 $2,857,846.30 $21,565.50 $11,511.50 $2,890,923.30 0 365 Calendar Days The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. 4.8• Recommended b ity Engineer Date Agreed to by Cont=tor. Date �Q Accepted b City Dad J PAVING COMPANY P.O. Box 270040 Dallas, Texas 75227 -0040 Telephone (972) 289 -0723 Fax (972) 216 -5637 Monday, December 22, 2008 City of Coppell Engineering Department Attn; Keith Marvin 255 Parkway Boulevard P. O. Box 9478 Coppell, Texas 75019 Re: Coppell Road � f Per our conversation, the cost to install and additional 2" of concrete on Cooper Lane in exchange of lime stabilizing is an additional $9.00 /SY. There is approximately 175syds. As for the school parking lot there is approximately 600syds. Please let me know on this. Sincerely; 4" 6Z'46� Robert Caudill Vice President EWW6l4&W 1974 Page 1 of 1 Keith Marvin - Coppell road From: "Robert Caudill" <rcaudill(a,TiseoPaving.com> To: "Keith Marvin" <kmarvin(aci.coppell.tx.us> Date: 3/2/2009 3:49 PM Subject: Coppell road CC: "Robert Caudill" <rcaudill(a,TiseoPaving.com >, "Lance Smith" <lsmith@TiseoPaving.com> Keith; Here are the prices for the Form Liner Wall 1. Antique Cork C -26 (Color Only) 1,635 SFNF @ $1.90 /SFNF = $3,106.50 2. Form Liner (Sierra Dry Stack #439) 1,635 SF/VF @ $11.70/SF/VF = $19,129.50 3. Form Liner (Meramec Dry Stack #477) 1,635 SF/VF @ $10.95 /SFNF = $17,903.25 Let me know on this, as for added days we can talk about it later. Robert Caudill Vice President Tiseo Paving Company (972) 289 -0723 file://CADocuments and Settings \kmarvin \Local Settings \Temp \XPGrpWise \49AC000BCit... 4/7/2009 03/24/2009 13:38 9722165637 TISEO PAVING PAGE 02/03 : PAVING P.O. Box 270040 Dallas, Texas 75227 -0040 Telephone (972) 289 -0723 Fax (972) 216 -5637 March 24, 2009 Keitli Marvin, P.E. City or Coppell 255 Parkway Coppell, Texas 78019 Re: Coppell Road ST 00 -03 Acljust Grate Inlet Mr. Marvin., Please see the attached request for additional work. We have attached. a breakdown from North Texas Contracting for your review. An additional 1.0% for Tiseo Paving Co. is requested below. NTC $1,300.00 TISRO10% 130.00 TOTAL $1.,430.00 Sincerely Lace Smith Project Administrator Ea4fi&ee6 1974 93/24/2009 13:38 9722165637 TISEO PAVING North Texas Contracting, Inc. Job Name: COPPELL ROAD 3/16/2009 Location: COPPELL, TX 9 :44 AM Bid Cate: 6- Mar-08 Bid Time: 2 :00 PM Unit ADJUST GRATE INLET 2 VF TOTAL. CHANGE AMOUNT $ 1,300.00 TOTAL ADDED DAYS FOR CHANGE 1 CAL PAGE 03/03 Unit Amount 0.00 0.00 0.00 0.00 650.00 1,300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00