Loading...
Coppell OV 1A-CS090415 (2) THE.CiTY.OF COPPELL ~~\:.'.&,!t'G;>.l~-\.", d?2 c;i.'_Q{(."" .,~ ~t ,~~,\~". _1, )f.ii.~"""~~,,, r,~. ~-=-::r.---'-"(",!..>:.~' .PJ:'~.".~~; ""'1"- /' ~..-:,.~. -.\~ "..<Y'c?'''~~ \) 1:: ~--.~ ~~ q A .s \ April 15, 2009 L. Lynn Kadleck, P.E. Kadleck and Associates 555 Republic Dr., Suite 115 PIano, TX 75074 RE: Coppell Office Village Additions Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and has the following comments to offer: Utilitv and Drainae:e plan I. Specify how the service tap will be done, if open cut, pavement repair should follow the City of Coppell standards. FDC should be 4". 2. Y Oll are proposing to tie into a private storm drain system, you will need to get approval and an agreement from the CISD. You may also tie into TXDOT's storm drain system with their approval. 3. The City of Coppell requires a clean out where the sewer becomes private. Details and Notes 4. Remove the details.that are generic, reference the City ofCoppell standard details and specifications. Leave in only site specific details. The contractor is required to have a copy of our details on site at all times. The City of Coppell has reviewed the revised plans for the referenced addition and with the comments above addressed they will be approved. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell along with a copy of the City's standard construction details. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 inspection fees. A copy of the contract(s) should be attached for verification purposes. If you have any questions, please contact me at your convenience. .~ Michael Garza, E.LT Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570