Loading...
ST0003-CS090428 PAVING COMPANY P.O. Box 270040 Dallas, Texas 75227-0040 Telephone (972) 289-0723 Fax (972) 216-5637 April 28, 2009 Keith Marvin, P .E. City of Coppell 255 Parkway Coppell, Texas 78019 f)~ Mr. Marvin, Please see the attached request for additional work. We have attached a breakdown from North Texas Contracting for your review. An additional 10% for Tiseo Paving Co. is requested below. Please add 25 days to the contract for this additional work. NTC TISEO 10% TOTAL $41,939.00 4.139.90 $46,132.90 Sincerely ;(~~ Lance Smith Project Administrator &~ 1974 Job Name: Location: Bid Date: Bid Time: North Texas Contracting, Inc. COPPELL ROAD COPPELL, TX 6-Mar-08 2:00 PM 4/28/2009 9:06 AM Revised 10102 Item Description No. INSTALL 72" RCP EXTENSION @ POND NOTES: 42 53 55 Bid Unit Qt Unit Bid Amount 0.00 0.00 16,920.00 4,000.00 60.00 3,000.00 2,700.00 1,450.00 1,800.00 2,600.00 1,584.00 6,325.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72" CLASS III CONC PIPE CONC HEADWALL TYPE 'B' TRENCH SAFETY SYSTEM RE-MOBILlZA TION ( LARGE EXCAVATOR WI CREW) REMOVE EX. HEADWALL ( 72" ) CONNECT TO EX. 72" RCP DE-WATER POND HAUL OFF UNSTABLE BACKFILL I BEDDING ROCK UNDER PIPE ( 12" THICK) IMPORT BACKFILL 4 TO 1 GRADING WI CLEAN UP 0.00 0.00 282.00 4,000.00 1.00 3,000.00 2,700.00 1,450.00 1,800.00 2,600.00 44.00 23.00 1,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60 LF 1 EA 60 LF 1 LS 1 EA 1 EA 1 LS 1 LS 36 CY 275 CY 1 TOTAL CHANGE AMOUNl $ 41,939.00 1) DUE TO SMALL QUANTITY, BID UNIT FOR 72" RCP HAD TO BE ADJUSTED 2) IRRIGATION WORK TO BE PERFORMED TURNKEY BY OTHERS 3) NO WORK ASSOICA TED WITH POND LINER INCLUDED 4) NO ADDITIONAL POND GRADING OR MUCKING OUT INCLUDED 5) NO TREE PROTECTION FENCING INCLUDED 6) ALL IRRIGATION AND LANDSCAPE REPAIR BY OTHERS 7) NO TV OF PIPE INCLUDED (ASSUME VISUAL WILL BE ADEQUATE) 8) REMOVAL OF POND FOUNTAIN BY CITY 9) ANY ADDITIONAL ROCK REQUIRED FOR BEDDING TO BE PAID PER UNIT 10) CHANGE ORDER WILL BE BILLED AND PAID IN MONTH PERFORMED 11) WRITTEN APPROVAL WILL BE REQUIRED PRIOR TO START