ST0003-CS090428
PAVING COMPANY
P.O. Box 270040 Dallas, Texas 75227-0040
Telephone (972) 289-0723 Fax (972) 216-5637
April 28, 2009
Keith Marvin, P .E.
City of Coppell
255 Parkway
Coppell, Texas 78019
f)~
Mr. Marvin,
Please see the attached request for additional work. We have attached a breakdown from
North Texas Contracting for your review. An additional 10% for Tiseo Paving Co. is
requested below. Please add 25 days to the contract for this additional work.
NTC
TISEO 10%
TOTAL
$41,939.00
4.139.90
$46,132.90
Sincerely
;(~~
Lance Smith
Project Administrator
&~ 1974
Job Name:
Location:
Bid Date:
Bid Time:
North Texas Contracting, Inc.
COPPELL ROAD
COPPELL, TX
6-Mar-08
2:00 PM
4/28/2009
9:06 AM
Revised 10102
Item Description
No.
INSTALL 72" RCP EXTENSION @ POND
NOTES:
42
53
55
Bid
Unit
Qt
Unit
Bid
Amount
0.00
0.00
16,920.00
4,000.00
60.00
3,000.00
2,700.00
1,450.00
1,800.00
2,600.00
1,584.00
6,325.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
72" CLASS III CONC PIPE
CONC HEADWALL TYPE 'B'
TRENCH SAFETY SYSTEM
RE-MOBILlZA TION ( LARGE EXCAVATOR WI CREW)
REMOVE EX. HEADWALL ( 72" )
CONNECT TO EX. 72" RCP
DE-WATER POND
HAUL OFF UNSTABLE BACKFILL I BEDDING
ROCK UNDER PIPE ( 12" THICK)
IMPORT BACKFILL
4 TO 1 GRADING WI CLEAN UP
0.00
0.00
282.00
4,000.00
1.00
3,000.00
2,700.00
1,450.00
1,800.00
2,600.00
44.00
23.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60 LF
1 EA
60 LF
1 LS
1 EA
1 EA
1 LS
1 LS
36 CY
275 CY
1
TOTAL CHANGE AMOUNl
$
41,939.00
1) DUE TO SMALL QUANTITY, BID UNIT FOR 72" RCP HAD TO BE ADJUSTED
2) IRRIGATION WORK TO BE PERFORMED TURNKEY BY OTHERS
3) NO WORK ASSOICA TED WITH POND LINER INCLUDED
4) NO ADDITIONAL POND GRADING OR MUCKING OUT INCLUDED
5) NO TREE PROTECTION FENCING INCLUDED
6) ALL IRRIGATION AND LANDSCAPE REPAIR BY OTHERS
7) NO TV OF PIPE INCLUDED (ASSUME VISUAL WILL BE ADEQUATE)
8) REMOVAL OF POND FOUNTAIN BY CITY
9) ANY ADDITIONAL ROCK REQUIRED FOR BEDDING TO BE PAID PER UNIT
10) CHANGE ORDER WILL BE BILLED AND PAID IN MONTH PERFORMED
11) WRITTEN APPROVAL WILL BE REQUIRED PRIOR TO START