Loading...
SS9701-LR 931110MAXIM ENGINEERS, INC. 2342 Faben~ · P.O. Box 59902 · Dallae, 'IX Engineering end Environmental Con~ultents (214) 247-7575 · FAX (214) 484-5804 IN-PLACE DENSITY OF SOIL Report Date C~ient Project Name Density Test Method 11/10/93 Sarople Date 11/06/93 City of Coppell proj~t Number 0393000626 Grapevine Creek Sewer Branch, Phase I and II - PO# 8616 - Grapevine, Texas ASTM D2922 and D3017 Me,od of CompacUo~ ASTM D698 95% Project Moisture Req'd +--4 Material Proctor Results Number De~c~ Maximum Dry Density (pof) Op~mum Moisture % 1 Dark brown sandy clay with calcareous nodules 109.2 16.0 Tent Material % of Maximum Number Number Dry Deoelty (~b~/cu. ~) c.~xfant (~) 39 I Final Sanitation sewer on east bank of creak 104.5 approx. 20' west end 90' northof west end of Rockwall 40 I Final Sanitation sewer on east bank of creek approx. 35' west of 220' north of west end of Reck'wall 18.9 95.7 104.9 18.7 96.0 All densities meet project specifications unless otherwise noted. Technician: P. Nichols /aes City of Coppell - Jim R. Ragsdilt City of Coppell - Garreth Campbell, Sr. This report is for the sole use of.the.cl'.~n, t a.dd.mssed. T~e use of our company name must receive our prior written consent This repo~ applies ouly to the ,am~leo36~e~2ted147a~!