Duke Lesley 3C-LR090413
AlPHA~TESTING
DAILY FIELD
REPORT
2209 Wisconsin Street, Suite 100
Dallas, Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TESTED FOR: Duke Construction Limited Partnership
Dallas, Texas
DATE: 04/13/09
PROJECT:
Point West I Expansion
Coppel, Texas
OUR REPORT NO.: 090238-2
TECHNICIAN: J.R.
WEATHER: Sunny
TEMPERATURE RANGE: 45 to 65 Degrees
The Alpha Technician traveled to the above referenced site to monitor on-going work and perform field testing as requested.
Upon arrival at the site, the technician was informed that previously scheduled density testing would not be required for parking lot
due to inclement weather.
Respectfully Submitted,
CL-t}L W ~
Christopher W. Eddy, P.E.
ALPHA TESTING. INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except INith express approval of Alpha. The use of
our name and test results must receive our vvritten approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.