Loading...
ST0003-CS090529 THE.CITY.OF COPPELL Ii MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, P.E., Dir. of Engineering / Public Works Glenn Hollowell, Asst. Dir. of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Deputy Chief/Prevention From: Albert Samaniego, Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 Date: May 29, 2009 RE: W ALK- THRU INSPECTION ST 00-03 Coppell Road A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: FRIDAY, JUNE 5,2009, AT 9:00 a.m. Please let me know if I can be of further assistance. cc: Robert Caudill, Tiseo Paving fax #: 972/216-5637 Ken Roberts, Huitt-Zollars fax #: 214/871-0757 "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"