Duke Lesley 3C-LR090511
ALPHA ~.TESTING
2209 Wisconsin Street, Suite 100
Dallas, Texas 75229
Geotechnical I Construction Materials I Environmental
wvvw. a I phatesti ng. com
DAILY FIELD
REPORT
TESTED FOR:
. . ed Partnership
DATE: 05/11/09
PROJECT:
TECHNICIAN:
WEATHER:
p er Eubanks
Cloudy-Raining
OUR REPORT NO.: 090238-13
TEMPERATURE RANGE: 64 Degrees
The Alpha Technician traveled to the above referenced site to monitor on-going work and perform field testing as requested.
Upon arrival at the site, the technician was informed that previously scheduled pier observation and concrete testing would not be
required due to inclement weather.
Respectfully Submitted,
CMJL l<J. ~
Christopher W. Eddy, P.E.
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of
our name and test results must receIve our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.