corrELL
June 30, 2009
Robert Caudill
Tiseo Paving Company
PO Box 270040
Dallas TX 75227
RE: Bethel Road Project #ST 99-05
Final Acceptance
Dear Mr. Caudill:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities
for the referenced project. The two-year maintenance bonds and record drawings have been
received. Maturity on the bonds will be two years from the date of final payment, which was
June 1,2009.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if
stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a
Notice of Termination (NOT) to discontinue coverage under the SWPPP permit.
-
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks
for your cooperation.
Sincerely,
Keith Marvin, P.E.
Project Engineer
Office Phone: (972) 304-3681
Fax: (972) 304-3570
kmarvin@ci.coppell.tx.us
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Tim Oates, Deputy Chief/Prevention
Rick 0' Dell, Construction Inspector