Loading...
ST9905-CS090630 THE.CITY.OF corrELL June 30, 2009 Robert Caudill Tiseo Paving Company PO Box 270040 Dallas TX 75227 RE: Bethel Road Project #ST 99-05 Final Acceptance Dear Mr. Caudill: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and record drawings have been received. Maturity on the bonds will be two years from the date of final payment, which was June 1,2009. You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. - A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sincerely, Keith Marvin, P.E. Project Engineer Office Phone: (972) 304-3681 Fax: (972) 304-3570 kmarvin@ci.coppell.tx.us cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Tim Oates, Deputy Chief/Prevention Rick 0' Dell, Construction Inspector 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673