Loading...
CF-Fire Station 1-LR081204 ~ u 81 . I CONSUL TING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Concrete Testing Report Project Name: Fire Station Storage Building GME Project No.: Date: 08.05.0268-002 I 12/04/08 Client Name: City ofCoppell FIELD TEST DATA Location of Pour When Sampled: Piers' B-1 and (:-1 Contractor: Jamail & Smith Construction Supplier/Plant: Southern Star # I I I Sampled By: Bill Holt Time Batched: 12:40 p.m. Sampled: I :45 p.m. Delivery Ticket No.: Truck No: 7003 1410502 Mix ID No.: 9453 Temperature: Air: Slump (inches): 570 Concrete: 550 Load Size (cu. yds.):~ Total Pour (cu. yds.): 40170 3.5 Air Content (%): --=- Water Added on Site: -0- Specimen Type: Cylinders Test Method: ASTM C-39 x , ASTM C-123 I , ASTM C-617 Set No. Lab No. Type Cure Date Tested Age in Days Failure Load Specimen Are: Compressive (Ibs. ) (Sq. in.) Strength (PSI) I C-5679 Lab 12/11/08 7 I 18,870 28.27 4204 I C-5680 Lab 01/0 1/09 28 128,070 28.27 4530 I C-568 I Lab 01/0 1/09 28 144,490 28.27 51 10 I C-5682 Lab H 28.27 SPECIFIED STRENGTH 4000 psi COMPRESSIVE STRENGTH TEST RESULTS Remarks: Briefing: Reference GMF report # OR 05 026R 0020 Travel Time: GME Representative: Bill Holt Reviewed By: nmc ~4/ ~~~ Time on Job: Distribution: City of Coppell Jamail & Smith Construction Reporting: Total Time: