Loading...
CF-Fire Station 1-LR081205 CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Dally Keport Project Name: Fire Station Storage Building Client Name: City of Coppell Type Service: Cylinder Pick Up Did Work Observed Meet Job Requirements: GME Job No: 08.05.0268-0022 17105108 Date: Weather: Deviations Reported To: A GME technician traveled to the job site to pick up one set of four concrete test cylinders, returned them to the GME lab and prepared them for compressive strength testing at a later date. Briefing: Distribution: Travel Time: 1.00 City of Coppell Jamail & Smith Construction Time on Job: 0.25 Reporting: 0.25 Total Time: 1.50 \...Ll~l~ 1 : PROJECT NUMBER: REPORT DATE: LAB NUMBER: U ot Lo ell 08.05.0268-0018 12/3/08 S-2056 135 85 \ \ PROCTOR NUMBER: 001 1\ \ Max. Dry Densitv (pet): 115.5 \ \ 1\ Optimum Moisture (%): 15.5 1\ Material Description: 3/8" Crushed Concrete FIe \ Classification: MH 1\ Sample Location: On-site Stockpile \ \ Sample Date: 11/36/08 1\ Sampled By: JV \ \ 1\ Sample Preparation: Wet Method \ Liquid Limit: 44 \ j I \ Plastic Limit: 29 \ \ \ Plasticity Index: 15 ~ Test Method: ASTM 0698 Method A . . o \ Rammer Tvpe: Manual ~\ 1\ ./ \' " \ ~\ 1\ I ~ 1\ \ 1\ II" .\ / ~ 1\ \ \ 1\ 1\ 1\ '\ \. '\ \.\ \. \ \. SPECIFIC GRAVITY I\. I\. 2.80 1\ \ 1\ \. 2.70 I\. I\. 2.60 I<"" \.v 1\.,11 I' \. I\. \. \. " \. "- 1"\ "" I'" "l'o.. l-...~ "" I\..I\.. 130 xbase 125 120 115 110 105 - = ::i ~ en 100 .0 C ~ (f') Z 95 W 0 >- a: 0 90 80 75 70 n " in 11: "n