Minyard Site-LR081201
REPORTED TO: KTR Coppell, LLC
c/o Pritchard Associates
2500 Routh Street
Dallas, Texas 75201
ATTN: Mr. Roger Dahlin
REPORT NO. 237
REPORT DATE: 12-01-08
REG PROJECT NO. 15324
DATE OBSERVED: 11-05-08
TECHNICIAN: R. Hollings
PAGE: 1 of 1
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Freeport Crossing
Freeport Parkway and Bethel Road
Coppell, Texas
CONTRACTOR: C.F. Jordan
I Items Observed:
I Reference Plans or Notes Used:
I Paving: 75-295'S, 0-15'E from N.E. corner, and
60-280'N, 0-15'E from S.E. corner of Building B.
Sidewalk: 0-5N, 25-60'W and 0-5'N, 125-320'W from
N.E. corner of Building C. .
Sidewalk: 0-5'S, 0-105'E from S.W. corner, and 0-5'S,
. 25-65'Wfrom S.E. corner of Building C.
I Sheets C-8 and C-9.
x IThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-Mail
Distribution: (1) Pritchard Associates/
Mr. Roger Dahlin
(1) Pritchard Associates/
Ms. Deanna Jacoby
(1) City of Coppell/Ms. Carol Dye
Submitted by:
REED ENGINEERING GROUP, LTD.
Mail
Distribution: (1) KTR Coppell/LLC/
Mr. John Bancroft
~J
.
Ronald F. Reed, P.E.
B ES/rs
(1) City of Coppell/Mr. Lee Stone
(1) O'Brien & Associates/
Mr. Richard Nordyke
(1) Technistructures, Inc./
Mr. Dennis Gant
(1) C.F. Jordan/Mr. Steve Lawrence