Loading...
MA0901-AG090609 THI:.CITY.OF DEPT: Engineering DATE: June 9, 2009 AGENDA REQUEST FORM COPPELL )f~" . . ." .... ,. .- . Q ~ . ~ .'\ 6 1 eo ITEM#: 17 o WORK SESSION D CONSENT o REGULAR ITEM TYPE: RESOLUTION ITEM CAPTION: Consider approval of a Resolution authorizing the City Engineer, in conjunction with the Contractor, to close Kimbel Kourt to through traffic from 100' north of Sandy Lake Road to Village Parkway, to facilitate reconstruction of the roadway, from the effective date until September 30. 2009; and authorizing the Mayor to sign and execute the necessary documents. GOAL(S): EXECUTIVE SUMMARY: The city is preparing to bid the contract for reconstruction of Kimbel Kourt from Sandy Lake to Village Parkway. Closure of the road wi. help facilitate construction by making it safer and faster. Approval of this item win allow us to include the closure information in the bid documents. Staff win be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Staff recommends approval of the Resolution. ACTION TAKEN BY COUNCIL: APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve Res. # 2009-0609.5 RECOMMENDED ACTION: M - Franklin S - Mahalik Vote - 5-0 Tunnell and Faught absent . Libby Ball U 2009.06.16 11:53:26 -05'00' I#Kimbel Kt Closure THE.CITY.OF COPPELL s MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: June 9, 2009 RE: Consider approval of a Resolution authorizing the City Engineer, in conjunction with the Contractor, to close Kimbel Kourt to through traffic from 100' north of Sandy Lake Road to Village Parkway, to facilitate reconstruction of the roadway, from the effective date until September 30, 2009; and authorizing the Mayor to sign and execute the necessary documents. The repaving of Kimbel Kourt is on the IMF plan for completion during this fiscal year. The engineering department designed this project in-house. We anticipate opening bids by the end of June, and expect to be before you in July for award of a construction contract. We feel that the project can be completed quicker, more safely, and at less cost if the contractor is allowed to close Kimbel Kourt to traffic from 100 feet north of Sandy Lake to Village Parkway. We request approval to close Kimbel Kourt from the time of contract award through September 30, 2009. Approval of this resolution will allow staff to move forward with the process of bidding the Kimbel Kourt project. Staff will be available to answer any questions at the council meeting. t PROPOSED IMPROVEMENTS KIMBEL KOURT RE-CONSTRUCTION CITY OF COPPELL PROL.JECT MA09-0 1 o 1/2 1 I . I 1 INCH = 1 MILE Cr..... on: 28 May 20(111)' ScalI..-I S~CAO\ln_D..ign\MISC EXHlBrrSldwg\EXHlBlTS.d~l CLOSURE [T. MI. ~.;. T T . 0 p COPPELL .~lL~ * e~. 't~~~. 1/2 Created in LDDT t PROPOSED IMPROVEMENTS KIMBEL KOURT RE-CONSTRUCTION CITY OF COPPELL PROL.JECT MA09-0 1 o 75 150 I,., . _ ..' I 1 INCH = 150 FT. AREA OF PROPOSED ROAD CLOSURE Ct.-.cI on: 28 ..., 200Q Ili)' ScCIII: .... S~CAll\kl_D..ign\MISC EXHISrrSldwgIEXHlBlTS.dwglMAlli-Ol CLOSURE u. . ., C()'PPELL .~ll * 1J~. ';-~~~. ~ .. . I ' 212 Created in LDDT Page 1 of 1 A RESOLUlION OF THE em OF ('OPPELL,TEXAS RESOLlrnON NO. ~09-{)"Off/.5" A RESOLUTION OF mE CITV OF cOrrELL. ttXAS" AUfHORlZlN<; TH.: (~rrv ENGINEER, IN CONJUNCTION Wlm THE CONTRACI'OR, TO CLOSE KIMBEL KOURl' TO 11IROVGH TRAme FROM 1.' NORTH OF EA.""" SANDY lAKE ROAD TO VILLAGE PARKWAY. TO FACII.ITATE RECONSTRUCTION OF nlE ROADWA V UNTIL SEPTEMBER 30.1009. AND PROVIDING AN EFFECTIVE DATE. WHEREAS. Kimbel Kourt must undergo reconstruction in the near future; and WHEREAS, durin8 lht period of said reoonsttuetion, ttaffic on the stRet wi II be severely impaired; and WHEREAS, staff is of the opinion that such reconstruction would be safer and (aster if the City Engineer. in conjunction with the Contractor authorized to pcrform such reoonslruction. is permitted to close Kimble Kourl dllring Ihe period of reconstruction; and WHERF.A.~ after con'lideratioo the Cit). Council has detennined thai it would be in the best mten:st of the City and its citizens to provide a sater and faster process by pcnnilting the closure of Kimbel Koort during the period of reconstruction: NOW. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COprELL. TEXAS: SECJ10N 1. 'That the City Engineer. in conjunction with the Contractor for the Kimbel KOlIrt m:onstnlction. is hereby authorized to undertake the necesslry steps to dose the street to through traffIC from 100' north of Ea...t Sandy Lake Road to Village Parkway during the period of reconstruction until September 30. 2009. SECIlON 1. That the Contractor is authorized and direck:d to cause the en:ction of signs and oOiciallrafTlC control devices as i! neces.wy to gho'e notice as provided ~rein, http://weblink.cLcoppell.tx.us/weblink7 /ImageDisplay .aspx?cache=yes&sessionkey= WLI... 7/15/2009 Page 1 of 1 . . SECTION J. That this Resolution shall \ake e~t immediately from and aftet' its passage as the law and charter in such cases provide. DUL y PA..~~ED by the Cit)' Council of the City ofCoppell, Texas. this dle ~y of ~. APPROVED: ~~ JAE P . fRS. MAYOR A~": ~~ftf& ~ , . YBAU. SEeR ARY 2 http://weblink.ci.coppell.tx.us/weblink 7 /ImageDisplay .aspx?cache=yes&sessionkey=WLI... 7/15/2009