Loading...
ST0301A-AG090609AGENDA REQUEST FORM T- ~ ` � ` ' T Y - ° -` DEPT: Engineering COPPELL DATE: June 9, 2009 T o ITEM #: 16 11 WORK SESSION 1:1 CONSENT IZI REGULAR ITEM TYPE: RESOLUTION ITEM CAPTION: Consider approval of a Resolution to close Bethel Road from Armstrong Boulevard to Penfolds Lane for a period of up to five months from the beginning of work on replacement of the Grapevine Creek bridge; providing for a penalty for road closure beyond five months; providing for a variable bonus award for bridge completion and road re- opening in less than five months; and authorizing the Mayor to sign and execute any necessary documents. GOAL(S): EXECUTIVE SUMMARY: The city is preparing to bid the Bethel Road Phase II -A project from Denton Tap to Penfolds Lane. This project will require closure of Bethel Road for reconstruction of the bridge over Grapevine Creek. Approval of the item will authorize us to include this information in the bid documents. Staff will be available to answer questions at the Council meeting. FINANCIAL COMMENTS: RECOMMENDED ACTION: Staff recommends approval of the Resolution. ACTION TAKEN BY COUNCIL: APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve Res. # 2009 - 0609.4 M - Hinojosa- Flores S - Hunt �► Libby Ball Vote - 5 -0 2009.06.1 Tunnell and Faught absent 6 11:53:46 05,00, #Bethel Rd Closure MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: June 9, 2009 RE: Consider approval of a Resolution to close Bethel Road from Armstrong Boulevard to Penfolds Lane for a period of up to five months from the beginning of work on replacement of the Grapevine Creek bridge; providing for a penalty for road closure beyond five months; providing for a variable bonus award for bridge completion and road re- opening in less than five months; and authorizing the Mayor to sign and execute any necessary documents. The engineering department is currently preparing to go out for bids for the reconstruction of Bethel Road from Denton Tap to Penfolds Lane. This project will include the replacement of the bridge over Grapevine Creek. In order to replace this bridge, the road will need to be closed during demolition of the existing bridge, and construction of the new bridge. The design consultant for this project believes that this bridge can be reconstructed within four to five months. The anticipated cost of construction for the bridge is $718,000. We will include an incentive /disincentive within the bid documents specifically related to construction of this bridge. The contractor will have some latitude within the contract period on when the closure will take place. Once the closure begins they will have 150 days to re- establish two -way traffic across the bridge. If they are able to open the road to two -way traffic in less than 120 days, they will earn a bonus of $1,000 per day. In the event this closure takes longer than 150 days, there will be damages assessed of $1,000 per day. There will be no bonus and no penalty for completion of the bridge between 120 and 150 days. Closure of this road will cause an inconvenience to the residents and businesses along Bethel Road. We understand this, and believe that providing the incentive /disincentive structure will ensure that it is completed in a timely manner. We spent a significant amount of time considering other alternatives to this road closure, and simply found no way around it. Approval of this resolution will allow staff to move forward with the process of bidding the Bethel Road project from Denton Tap to Penfolds Lane. We expect to be before you for contract award later this year. Staff will be available to answer any questions at the council meeting. ri Page 1 of 1 A RESOLUTION OF THE CITY OF C OPPELI., TEXAS Ml I ' ♦` A RESOLUTION OF THE CITY OF COPPELL, TEXAS, AUTHORIZING THE CITY ENGINEER, IN CONJUNCTION WITH THE CONTRACTOR, TO CLOSE BETHEL ROAD FROM ARMSTRONG BOULEVARD TO PENFOLDS LANE FOR A PERIOD OF UP TO FIVE MONTHS FOR TIIE CONSTRUCTION OF THE BRIDGE OVER GRAPEVINE, CREEK AS PART OF THE BETHEL ROAD [I PHASE A PROJECT; AND PROVIDING AN FFFECTIVIF DATE. WHEREAS„ Bethel Road 11 Phase A. from [Denton Tap Read to Peniolds Lane including the Midge over Grapevine Creek. is planned to undergo reconstruction in the near future; and WHEREAS, during the period of said rocxmswciiom traffic on the street and bridge will be severely inrpa.ired: and WHEREAS, reconstruction of the bridge within the existing right-of-way requires closure of the portion of Bethel Road to be affected during the period of reconstruction, and WHEREAS, after consideration the City Council has determined that it would be in the best interest of the City and its citizens to provide for a safer reconstrtx-lion process by permitting the temporary closure of this portion of Bethel Road during the period of teconstruulion. NOW, THERFYMIF, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION I. That the City (=ngineer, in conjunction with the Contractor for the Bethel Road 11 Phase A project, is hereby authorized to undertake the nemssary steps to close the street and badge to through traffic during the period of reconstruction. SECTION 2. That the Contractor is authoized and directed to cause the erection of signs and official traffic control devices as is rrecessany and to give notice of ahernaw routes of travel as provided herein. http: / /weblink. ci. coppell .tx.uslweblink7 /ImageDisplay. aspx ?cache= yes &sessionkey= WLI... 7/15/2009 f Page 1 of 1 SECTION 3. That this Resolution shall take cMct immediately from and after its passage as the law and charter in such cases provide. DULY PASSED by the City Council of the City ofCoppell, Texas, this the .7�''day of APPROVED: ,r_ JA WEk! fA Y iR AM.5T: HALL, c SF.CRFI'ARY A,PPR AS TO [CORM: R ERT E. MAGER, ATPORNEY 2 http:// weblink. ci. coppell. tx .uslweblink7 /ImageDisplay.aspx ?cache= yes &sessionkey= WLI... 7/15/2009