Loading...
ST0702-AG090714 AGENDA REQUEST FORM THE.CITY.OF DEPT: Engineering DATE: July 14, 2009 corrELL ~~Jf e~1\6"". ~&q ITEM #: D WORK SESSION D CONSENT o REGULAR ITEM TYPE: RESOLUTION ITEM CAPTION: Consider approval of a Resolution authorizing the City Engineer, in conjunction with the Contractor, to close South Coppell Road to through traffic from 400' south of Bethel Road to Southwestern Boulevard to facilitate reconstruction of the roadway; and authorizing the Mayor to sign and execute the necessary documents. GOAL(S): IIIIIIII EXECUTIVE SUMMARY: Approval of this Resolution will allow the reconstruction of South Coppell Road to be conducted in a safe and quick manner. Staff will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: RECOMMENDED ACTION: ACTION TAKEN BY COUNCIL: Staff recommends approval of the Resolution. 1#5 Coppell Rd Closure THE.CITY.OF COPPELL ~~*!I'. E:J( ~ \')'\ 1\ S . \ MEMORANDUM TO: Mayor and City Council VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: July 14,2009 RE: Consider approval of a Resolution authorizing the City Engineer, in conjunction with the Contractor, to close South Coppell Road to through traffic from 400' south of Bethel Road to Southwestern Blvd. to facilitate reconstruction of the roadway; and authorizing the Mayor to sign and execute the necessary documents. At the June 9, 2009 City Council meeting, the City of Coppell awarded a construction contract to JRJ Paving, L.P. for the reconstruction of South Coppell Road from Bethel Road to Southwestern Blvd. The original intent for this reconstruction was to limit the road to one way traffic for the duration of the project in the same manner as the recently completed portion of Coppell Road from Sandy Lake Road to Cooper Lane. This would require the contractor to construct the project in phases, installing utilities, and paving on one half of the road, then switching traffic to the newly constructed paving and beginning work on the other side of the road. This is a viable construction sequence that allows access to adjacent development along the street during construction. In the case of this project, there is very little existing development along the road. In discussions with JRJ, they have offered a cost reduction of $41,040 to the cost of the project if they are allowed to close the road for the duration of the project. The limits of the proposed closure are shown in the attached exhibits. Access to the homes and the Farmers Market driveway on the north end of Coppell Road, and access to the City Service Center through the intersection of Bums Street will be maintained for the duration of the project. Three other facilities will be impacted by this closure. The Animal Shelter and Fire Administration buildings have an access driveway from South Coppell Road that will be closed during the reconstruction. The closure was discussed with both the Fire Department and the Police Department, and emails from both departments supporting the closure are provided in this packet. The city will erect temporary signage notifying residents to access the Animal Shelter from the driveway off Southwestern Blvd. The final impacted facility is a business on the southwest comer of South Coppell Road and Bums Street. This is an industrial business with access from both Bums and South Coppell Road. We will keep them advised about the closure, and on the status of construction as the project progresses. Also, the closure will impact the school route to Pinkerton Elementary from neighborhoods along Bethel Rd. and south of Kaye Street. Instead of using South Coppell Rd. to access Southwestern Blvd., citizens will need to drive further west and use Freeport Pkwy. to access Southwestern Blvd. This will add about 0.6 miles to the commute. We request approval to close South Coppell Road from 400 feet south of Bethel Road to Southwestern Blvd for the 210 Calendar Days of the project during the reconstruction of South Coppell Road. Construction is expected to begin this week, and be complete by February 2010. Staff will be available to answer any questions at the council meeting. 4 V~ i PROPOSED ROAD CLOSURE S. COPPELL ROAD RE-CONSTRUCTION CITY OF COPPELL PRO&JECT ST07-02 o 1/2 1 I" \ I 1 INCH = 1 MILE CfMted on: 28 JUM 2ClO8 IP/ ScIlIIl..IIIlI S~CAO\In_D"iGn\MISC EXHIBITSldwgIEXHlBlTS.dwg\MA09-01 3 r T __I! . . II;: I T Y . 0 ~ COPPELL .~~ * e~. 'l~~~. '". l. 1/2 C realed in LOOT .. z.: PRO.lECT LIMITS PROPOSED ROAD CLOSURE S. COPPELL ROAD RE-CONSTRUCTION CITY OF COPPELL PRO&JECT ST07-02 J;:-~ -~ . C I T T . 0 .. COPPELL .~.t:t. * JJ.t4;. ';-~~~~. 2J2 Created in LOOT " o 150 300 1_- ,,,. . ,_ I 1 INCH ~ 300 FT. ",. A~ OF PROPOSED ROAD CLOSURE CrNted on: 28 J~ 2:008 Dr ScalI; iAIa S~CAO\In_D"iGn\MISC EXHIBITS\dwg\EXHlBlTS.dwgISTOHI2 CLOSURE 3 i ~CHOOL BOUNDARY 750 1500 , I 1 I NC'H = 1500 FT. ) ) ) ) ALTERNATE ROUTE TO PINKERTON ELEMENTARY o I PINKERTON ELEMENTARY ROUTE S. COPPELL ROAD RE-CONSTRUCTION CITY OF COPPELL PRO&JECT ST07-02 ['__~.__~_' C IT" . .!. . COPPELL .~*~~.. ~;~~~.. Cr_ed on: 2e June 2008 ~ SCCC..... . ". . ,. 212 S~CAO\In_D"iGn\MISC EXHIBITSIdwg\EXHBlTS.dwgIST07-ll2 SCHOOL Created in LOOT c( dRd 214-466-8340 FAX (Sales) 214-466-8354 FAX (Admin) 214-466-8352 PAVING, LP P.O. Box 59934 1805 Royal Lane, Suite 107 Dallas, TX 75229 CIty of Coppell Att: Kefth Marvin, P.E. Project Engineer Coppell Road South Paving and Drainage Improvements Mr. Marvin, This letter is to inform you that If the above mentioned street can be closed down in either 1 or 2 sections then their will be a deduct from Item 2 traffic control. If the north section, from approximately 5+95 - 14+10, is closed then the deduct for the north section will be $22,914.00 If the south section, from approximately 15+00 - 20+30, Is closed then the deduct for the south section will be $18,126.00 If both the north and south sections are closed then the total deduct will be $41,040.00 ASPHALT/CONCRETE PAVING · EXCAVATION · MILLING Page 1 of 1 Keith Marvin - Re: South Coppell Road (Southwestern to Bethel Road) ~k~ U. L~-",~ ~,. .II! From: To: Date: Subject: Gary Nix Keith Marvin 6/30/2009 8: 53 AM Re: South Coppell Road (Southwestern to Bethel Road) This will be fine as long a proper signs are in place for the public to find the Animal Shelter. Gary Nix >>> Keith Marvin 6/29/2009 10:12 AM >>> Gary{Tim, The dty is going to begin construction on the referenced project in the next few weeks. The contractor has offered a considerable savings if we were to allow them to close the road for the 9 months of construction. This will impact the primary access to the Animal Shelter. Secondary access from Southwestern Blvd. through the Fire Admin drive will be maintained for the duration of the project. The city can erect temporary signage at this drive directing motorists to the facility. See the attached drawing for additional information. Please let me know if you have any questions or concerns about this proposal. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 file://C:\Documents and Settings\kmarvin\Local Settings\Temp\XPGrpWise\4A49D280City... 7/1/2009 I (7/112009) Keith Marvin - S Coppel! Rd construction Page 1 I From: To: Date: Subject: Tim Oates Keith Marvin 7/1/2009 1:20 PM 5 Coppel! Rd construction Mr. Marvin, The Coppell Fire Department administrative staff has reviewed the proposal of completely shutting S. Coppell Road down for reconstruction. We have determined that this road closure will not significantly impact our emergency response capabilities to the community. Therefore, we support the request to close the road for reconstruction purposes. If you need any additional information, please let me know. Tim Oates Coppell Fire Department Deputy Chief - Prevention & Building Div. 500 Southwestern Blvd. Coppell, Texas 75019 ~ce # 972/304-7055 Fax # 972/304-3514 A RESOLUTION OF THE CITY OF COPPELL, TEXAS RESOLUTION NO. ~{){)9 -{;7/ 4. ~ A RESOLUTION OF THE CITY OF COPPELL, TEXAS, AUTHORIZING THE CITY ENGINEER, IN CONJUNCTION WITH THE CONTRACTOR, TO CLOSE SOUTH COPPELL ROAD TO THROUGH TRAFFIC FROM 400' SOUTH OF BETHEL ROAD TO SOUTHWESTERN BOULEVARD TO FACILITATE RECONSTRUCTION OF THE ROADWAY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, South Coppell Road must undergo reconstruction in the near future; and WHEREAS, during the period of said reconstruction, traffic on the street will be severely impaired; and WHEREAS, staff is of the opinion that such reconstruction would be safer and faster if the City Engineer, in conjunction with the Contractor authorized to perfonn such reconstruction, is pennitted to close South Coppell Road from 400' south of Bethel Road to Southwestern Boulevard during the period of reconstruction; and WHEREAS, after consideration the City Council has detennined that it would be in the best interest of the City and its citizens to provide a safer and faster process by pennitting the closure of South Coppell Road from 400' south of Bethel Road to Southwestern Boulevard during the period of reconstruction; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the City Engineer, in conjunction with the Contractor for the South Coppell Road reconstruction, is hereby authorized to undertake the necessary steps to close South Coppell Road to through traffic from 400' south of Bethel Road to Southwestern Boulevard. SECTION 2. That the Contractor is authorized and directed to cause the erection of signs and official traffic control devices as is necessary to give notice as provided herein. SECTION 3. That this Resolution shall take effect immediately from and after its passage as the law and charter in such cases provide. DULY PASSED by the City Council of the City ofCoppell, Texas, this the /~day of ~,2009. U - lJ APPROVED: ~~ JA Y PE RS, MAYOR ATTEST: 2