July 22, 2009
RE: SOUTHWESTERN BOULEVARD - PROJECT NOTICE
(Project # ST 07-0 I, S Coppell Rd to Denton Tap Rd)
Dear Owner or Resident:
The reconstruction of Southwestern Blvd. from the intersection of S. Coppell Rd to Denton
Tap is due to begin soon. The project is being constructed as a partnership with a large land
owner to the south of the existing road, using private and public funds. The project has been
in the planning stage for a long time, and we are pleased to be near the start of construction.
As part of the planned project, the Grapevine Creek bridge will be reconstructed and a
dedicated left turn lane will be added in front of Pinkerton Elementary to assist traffic flow
in that area. The road will be a 41 foot wide, 2 lane concrete street with improved drainage
and a new bridge over Grapevine Creek.
Lacy Construction, the contractor for the project, anticipates the start of construction will
be early to mid-August. The project, as designed by the City and Halff Associates,
should allow for two-way traffic for the duration of the reconstruction activities. If you
have any questions or need any additional information, please feel free to contact me at the
number below or Rick O'Dell, Construction Inspector at (972) 304-7090.
Sincerely,
Keith Marvin, P.E.
Project Engineer
Office 972/304-3681
Fax 972/304-3570
kmarvin@ci.coppell.tx.us
cc: Kenneth M. Griffin, P.E., Director of Engineering & Public Works
Rick O'Dell, Construction Inspector