Loading...
WA9402-CS 911121 GINN & CASE, INC. CONSULTING ENGINEERS November 21, 1991 Mr, Steve GoRAM Director of Public Works City of Coppell P.O. Box 47g Coppe!l, Texas 75019 Re: Proposed Hackberry Rd. Supply Maln & Rate of Flow Controller Dear Mr. Goram: Per your request, we have evaluated the possibility of moving the proposed Hackberry R.O.F.C, to the northern portion of the City to allow cost sharing with Lewisville and Flower Mound, In our opinion, this would not be in the best interest of the City of Coppeil and would most likely result in higher capital and operating costs for the City, The current Master Plan calls for a new 24' main along Sandy Lake Road from the Village Parkway Pump Station to the proposed elevated tank at Sandy Lake (Thweat) and Freeport, The plan also calls for a second rate oF flow controller in the vicinity of South Belt Line Road and Hackberry Road. There are several fundamental hydraulic factors which led to these projects and their proposed locations; 1) The Village Parkway site is at elevation' of 450' msl. This is one of the lowest points within the city. Operating pressure limitations and system hydraulics will restrict the VPPS a maximum input of 17-20 MGD to the 'water system. Since ultimate projections indicate a potential demand of 27 MGD, a second supply with ground storage and high service pumps will be required. In order not to interfere with the VPPS, the proposed station should be as far away as possible with an elevation more consistent wi~h the industrial areas of town. 2) When designing an efficient water system, it is desirable to have the load center (demand) between the elevated storage and pumping station. This allows the system to minimize pumping head and maximize the benefits of elevated storage, A graphic depiction of thls principal is attached (see figure 6-22 & 6-23 from Water and Wastewater Technology by Mark J. Hammer, John Wiley & Sons). The Hackberry site places the bulk of Coppell's light industrial areas between the proposed pump station and the existing elevated tank. It also has a ground elevation of :~537' msl or ~87' higher than VPPS. This would result in a ~:175 HP reduction from the VPPS motor size for a 10 MGD pu rap. ~ ~~.~~,~,~////, 17103 Pr~ion Road * Suitel00 ® Dallas, Texas75248 · Phone 214/248-4900 P.O. Box796577 · Dallas, Texas75379-6577 , FAX 214/931-145l The 24" main in Sandy Lake Road is proposed for a dual purpose. This wlll allow the YPPS to pump to the proposed elevated tank with minimal friction head losses and when the pumps are not running, the main will equalize pressures and provide flow from the proposed elevated tank to the areas primarily north of Sandy Lake Road. The existing 16" in Sandy Lake is undersized for allowing the VPPS to efflclently~ pump to the new elevated tank. The old elevated tank, existing 24" Cro'js-town main and existing 16'in Sandy Lake Road will serve the areas south of Sandy Lake. 4) Construction In and along the Sandy Lake Road corridor will be difficult and expensive due to the existing 8" and I6~ Coppell waterlines, 30" DWU water!ino, gas, phone, electrical, and storm sewers from the proposed widening. It is our opinion that Lewisrifle and Flower Mound will find it more economical to route the proposed line north along MacArthur through less congealed areas. Putting the station in the northern most portion of the city would be of little benefit to the southwestern portion of the City. This would also necessitate an increase in main size of many proposed l[nes in the western half of the city. Construction along Hackberry will be through less conSeated areas and subsequently less expensive. 5) The existing DWU main to DFW airport currently runs along Hack berry Road. The Hackberry site may allow for an emergency interconnect with the existing DWU line. This could possibly allow for the station to have a supply from two DWU systems. In summary, the second R.O.F.C. and pump station are projected to serve growth and demand in the southwestern industrial areas of the City. The Hackberry site will satisfy this purpose with lower operational costs and higher efficiency than other sites in the .northern portion of the City. An order of magnitude estimate for the Hackberry site is attached for your use. Current projections indicate the hackberry Rd. extension will not be required until ~2010, We do recommend that the City participate at this time with Irving in the oversizing of the new main from the Elm Fork Plant to Hackberry Rd. This will minimize future capital costs, Should you have any questions or need additional information, please feet free to contact our office, San~~ CasY/"/~//~e, p.E'~/~. attachments cc: Howard Parford File 90445 '. .~ ' ESTIMATE OF PROBABLE PROJECT COST'' HACKBERRY ROAD EXTENSION FROM IRVING'S DELIVERY POINT TO BELT LINE 36" R.C.P. ±9,000 LF @ $125/LF $1,125,000 54" Jack & Bore ±200 LF ~ $550/L[ 110,000 36w Valves 7 @ $7,500/ea. 52,500 Air Release Valve As~emblies 5 @ $3,000/ea. 15,000 Bonds/Insurance/Mobilization/Miso. 78,500 Subtotal $1,381,000 10% Contengencies 13S,000 Total Estimated Construction $1,519,000 Engineering/Administration/Inspection/ 39S,000 Testing Total Estimate of Probable Project Cost $1,914,000 Ginn & Case, Inc. 11/21/91 170 140 2G,000 ft el 24~in,, C ,, 100 pipe PumpTn, station '* Load center Figure 6-22 Hydraulic gradients wjlh nO storage rot ]~x~mple 6-4. Maximum deify plus partial tire flow (8.4 mid) Max iml.~m daily (6,0 rm. ld) 210 - Peak h~lrlV (6.0 mcJd) Average deity (4.0 rood) Averag0 ~dfy ~d maxim~m daily 176 _ ~~M ~' 171 ' Peak hourly (3.0 ~ 146 aximum d~i~y plu~ fir~ . ~ - ~' ' ' ~ C= 100 Pu,~p;,~J Lo;d ~t~lion Cen~er tank :}~ ~l' FIgure 6-23 }iydrRuliC gradients with elevatcd sloragc ~yond load ~ntcr ~or Examplc 6-4.