Loading...
Duke Lesley-CS090729 THE.CITY.OF corrELL "'.)"~.:s-~t;. ~~) \ "i.\; ~~i.2f;!...f~~iv .....1'- ~~~,.~~t~~ ',((. ~c~~,,., -I' 7' ""7"~;;,x~~...\ . .,~~'" ' ~ '""iii.V"~~:j~\\\~. '~..;,;..:':'~",,~~~~ \.) .c..:. ~........ ~. ~"'\~""'" q .\' 1\ .s' \ l'> July 29, 2009 Cyle Burchfield L H. Lacy Construction Company, Ltd. 1880 Crown Road Dallas, Texas 75234 RE: Duke Lesley Addition, Infrastructure Street Failure(s) on Dividend Drivel Point West Blvd. Bond No.1 030611 Dear Mr. Burchfield: The two-year term on the above referenced maintenance bond began on February 21, 2008, which was the date of final acceptance of the project. A periodic follow-up inspection of the facilities has revealed problems that should be discussed as soon as possible at the location involved, so that further deterioration can be prevented. Please contact me at the number below at your earliest convenience. Since:.~ly, ~ ~- Davis onstruction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works . Keith Flowers, Duke Construction, Fax: 972/361-6800 Tod Feazell, LH. Lacy Construction Company, Ltd. Mike Arne Duke Realty Corporation 14241 N. Dallas Pkwy., Suite 1000 Dallas, TX 75254 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673