North Gateway 9-CS090706
XAIE
ARCHITECTURE
ENGINEERING
"designing your solutions"
LeHer of TransmlHal
t-e>'--c>9
Date: ~ 09 09- Job No: 0100 12009
Project: North Gateway€8nI l'olr *... P\.,.AtA
L.cvt- ~. gf....~ A .
D
Subcontractor IContractor/Trade
To: City ofCoppell
Engineering Department
255 Parkwat Blvd.
Coppell, TX 75019
Attention: Mr. Michael Garza, EIT
We are transmitting:
D Shop Drawings
r8l Drawings
D CD
D Other:
I Coplesl
D Specifications
D Submittals
D Attached
D Sepia
D Under separate cover
D Addendum
Description
I Action'
~
2 8fs( submittal review drawinas D
. s--- . .-
Action:
A. Reviewed
B. Rejected
C. Furnish as corrected
D. For your review
E. Per your request
F. For your use
Remarks:
Michael
Thank you for meeting with us the other day. As we discussed, we are sending you this letter
of transmittal. If there is anything we can do to help expedite this review please let us know.
From: Ty Thompson, PE
X-AE. PllC
~L. 7 -~ '?- CC} 12412 ~mberfand Blvd. Suite 3SO Keller. Texas 762-48
817.223.7866 p 817.798.4233 p 817.540.4459 f www.x-ae-connect.com
~--- L ,''::; c (~. K. I ~