Loading...
CF-Fire Station 1-LR090130 (; 18 CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Concrete Testing Report Project Name: Fire Station Storage Building Client Name: City of Coppell GME Project No.: Date: 08.05.0268-0031 01/30/09 FIELD TEST DATA Location of Pour When Sampled: Paving - 1 O'N & 5'W of northwest comer existing fire station. Contractor: J amail & Smith Construction Supplier/Plant: Southern Star # 125 Sampled By: Hugh Dacus Delivery Ticket No.: 1446046 Time Batched: 1 :22 p.m. Sampled: 1 :57 p.m. Truck No: 9031 Mix ID No.: 7754 Temperature: Air: 620 Concrete: 620 Load Size (cu. yds.):-1L Total Pour (cu. yds.): 10/50 Slump (inches): 4.5 Air Content (%): A..L Water Added on Site: 20 gallons* Specimen Type: Cylinders Test Method: ASTM C-39 x , ASTM C-1231 , ASTM C-617 Set No. Lab No. Type Cure Date Tested Age in Days Failure Load Specimen Are: Compressive (Ibs. ) (sq. in.) Strength (PSI) 1 C-6855 Lab 02/06/09 7 125,400 28.27 4435 1 C-6856 Lab 02/27/09 28 28.27 1 C-6857 Lab 02/27/09 28 28.27 1 C-6858 Lab H 28.27 SPECIFIED STRENGTH 4000 psi COMPRESSIVE STRENGTH TEST RESULTS Remarks: *water added by contractor rCylinders stored inside the fire station.l Briefing: Reference GME report # 08 05 0268 0030 Travel Time: GME Representative: Hugh Dacus Reviewed By: nmc ~ _./~ ~ Time on Job: Distribution: City ofCoppelI Jamai1 & Smith Construction Reporting: Total Time: CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Reinforcing Steel Observation Report Project Name: Fire Station Storage Building Client Name: City of Coppell Contractor: Jamail & Smith Construction GME Job No: 08.05.0268-0030 01110/09 Date: GME Representative: Hugh Dacus Reinforcing steel placement was visually observed for compliance with construction documents at the following locations. Paving - from the existing paving and building north and west to the new storage building Reference documents: Sheet(s) A3.3 Reinforcing steel observed at the above locations complied with the construction documents for the following: Yes No Yes No Size and Location X Adequate Ties X Grade (strength) X Supports X Splice (lapping) X Bars Clean X Spacing X Number X Clearance X Drape Height N/A Items not meeting these criteria or construction documents as described below: Briefing: Travel Time: Time on Job: Distribution: 1.00 2.25 City of Coppell Jamail & Smith Construction Reporting: Total Time: 3.25 Reviewed By: nmc ~?~ ~ GME Representative: Hugh Dacus CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Concrete Testing Report Project Name: Fire Station Storage Building GME Project No.: Date: 08.05.0268-0031 01/30/09 Client Name: City of Coppell FIELD TEST DATA Location of Pour When Sampled: Paving - 1 O'N & 5'W of northwest comer existing fire station Contractor: Jamail & Smith Construction Hugh Dacus Time Batched: 1 :22 p.m. Sampled: 1 :57 p.m. Supplier/Plant: Southern Star # 125 Delivery Ticket No.: 1446046 ' Truck No: 9031 Mix ID No.: 7754 Load Size (cu. yds.):~ Total Pour (cu. yds.): 10/50 Water Added on Site: 20 gallons* Sampled By: Temperature: Air: Slump (inches): 620 Concrete: 620 4.5 Air Content (%): A..L Specimen Type: C linders Test Method: ASTM C-39 x , ASTM C-1231 , ASTM C-6l7 Set No. LabNo. Type Cure 'Date Tested Age in Days Failure Load Specimen Are: Compressive '" , " Strength (psi) " ," , (lbs.) (Sq. in.) " " , , " 1 C-6855 Lab 02/06/09 7 125,400 28.27 4435 1 C-6856 Lab 02/27/09 28 161,870 28.27 5725 1 C-6857 Lab 02/27/09 28 162,710 28.27 5754 1 C-6858 Lab H 28.27 I SPECIFIED STRENGTH 4000 psi COMPRESSIVE STRENGTH TEST RESULTS Remarks: *water added by contractor rCylinders stored inside the fire station.l Briefing: Reference GME report # 08 05 0268 0030 Travel Time: GME Representatil2_:~ Reviewed By: nm ~ Time on Job: Distribution: City of Coppell Jamail & Smith Construction Reporting: Total Time: