Loading...
Wagon Wheel-LR090206 CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Concrete Testing Report Project Name: Wagon Wheel Storage Building Client Name: City of Coppell GME Project No.: Date: 08.05.0269-0018 02/06/09 FIELD TEST DATA Jamail & Smith Construction Location of Pour When Sampled: Parkine lot west entrance' 10' to 70'N Contractor: Sampled By: John McRae Time Batched: 8:33 a.m. Sampled: 9: 19 a.m. Temperature: Air: Slump (inches): 600 Concrete: 650 6.0 Supplier/Plant: Southern Star # 125 Delivery Ticket No.: 1450545 Truck No: 6221 Mix ID No.: Load Size (cu. yds.):~ Total Pour (cu. yds.): 20/70 Air Content (%): .....4...5...- Water Added on Site: 25 gallons* 1 1 1 1 C-7105 C- 7106 C- 7107 C-7108 Lab Lab Lab Lab 02/13/09 03/06/09 03/06/09 Remarks: *water added by subcontractor specified to be::!:: 4. 7 28 28 H 88,860 28.27 28.27 28.27 28.27 3143 SPECIFIED STRENGTH 3000 psi Randy with Jamail & Smith informed of slump which is Briefing: Reference GMR report # 08 05 02690017 Travel Time: Time on Job: Reporting: Total Time: GMERepresen:~ RevIewed By: Distribution: City of Coppell Jamail & Smith Construction CONSULTING SERVICES, INC. 2530 Electronic Lane, Suite 710 Dallas, Texas 75220 Phone (214) 351-5633 Fax (214) 351-5680 Concrete. Testing; Report Project Name: Wagon Wheel Storage Building Client Name: City Of Coppell GME Project No.: Date: 08.05.0269-0018 02/06/09 FIELD TEST DATA Location of Pour When Sampled: Parking lot west entrance' 10' to 70'N Contractor: Jamail & Smith Construction Supplier/Plant: Southern Star # 125 Sampled By: John McRae Delivery Ticket No.: 1450545 Time Batched: 8:33 a.m. Sampled: 9:19 a.m. Truck No: 6221 Mix ID No.: Temperature: Air: 600 Concrete: 650 Load Size (cu. yds.):~ Total Pour (cu. yds.): 20/70 Slump (inches): 6.0 Air Content (%): .....4...5...- Water Added on Site: 25 gallons* Specimen Type: C linders Test Method: ASTM C-39 x , ASTM C-1231 , ASTM C-617 Set No. Lab No. Type Cure Date Tested Age in Days Failure Load Specimen Are: Compressive (lbs.) (sq. in.) Strength (PSI) I C-7105 Lab 02/13/09 7 88,860 28.27 3143 1 C- 71 06 Lab 03/06/09 28 124,520 28.27 4404 1 C-7107 Lab 03/06/09 28 121,010 28.27 4280 I C-7108 Lab H 28.27 SPECIFIED STRENGTH 3000 psi COMPRESSIVE STRENGTH TEST RESULTS - Remarks: *water added by subcontractor --- specified to be ::!:: 4: Randy with Jamail & Smith informed of slump which is Travel Time: GME Representative: Reviewed By: nm . Briefing: Reference GME report # 08 05 026900] 7 Time on Job: Distribution: City of Coppell Jamail & Smith Construction Reporting: Total Time: