Loading...
WA0601-CS090730 THE.CITY.OF COPPELL ~$- -..1 -, \~'" S\\.~,~ .<12 ,;,;,!;~\(,;I/l;J~_..:.,iJ~ 'Ti ""'-. . ~!\I<.'>y "I.. >t7J r01"~~~ '( .-\- (:<.:<), r, /Yk;-~-.~J -:) . l' ';;""~:......' . .:fj;.-:<. i':"."""'~ \l 1:'0 ... r.' . (j """" .f,....,""',..~ q " ..\' ~"ilJ,- /',. "'I.i,V' I'> A .s \ July 30, 2009 Jim Bowman Jim Bowman Construction Company 1111 Summit A vc, Suite 1 PIano lX 75074 RE: Hunterwood Park Watcr Line #WA 06-01 Final Acceptance Dear Mr. Bowman: Representatives of the City of Coppell have confinncd a final inspection of work on the referenced project. All applicablc paperwork has been received including the two-year maintenance bond. Maturity on the bond will be December 1, 2010. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation during the coursc of this project. Sincerely, /~~~ Keith R. Marvin, P,E. Project Engineer Office Phone: (972) 304-3681 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Albert Samaniego, Construction Inspector John Elias, Parks Operations Manager 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673