July 30, 2009
Jim Bowman
Jim Bowman Construction Company
1111 Summit A vc, Suite 1
PIano lX 75074
RE: Hunterwood Park Watcr Line #WA 06-01
Final Acceptance
Dear Mr. Bowman:
Representatives of the City of Coppell have confinncd a final inspection of work on the
referenced project. All applicablc paperwork has been received including the two-year
maintenance bond. Maturity on the bond will be December 1, 2010.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year
bond period. If any punchlist items are noted at that time, you will be contacted to make
repairs. Thanks for your cooperation during the coursc of this project.
Sincerely,
/~~~
Keith R. Marvin, P,E.
Project Engineer
Office Phone: (972) 304-3681
Fax: (972) 304-3570
cc: Ken Griffin, P.E., Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Albert Samaniego, Construction Inspector
John Elias, Parks Operations Manager