Loading...
Bethel Estates 1-CS090730DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM.' PD-18182-SF-12, Bethel Road Estates, a zoning change request from PD-181- SF-12 (Planned Development-181, Single Family-12) to PD-18182 (Planned Development- 181, Revision 2-Single Family-12) to allow for a stucco finish instead of masonry as required in Section 12-11-5 of the Zoning Ordinance, on 2.348 acres of property located at 256 West Bethel Road, at the request of Terry Holmes, The Holmes Builders of Coppell,Ltd. STAFF REP.: Matt Steer PROJECT ID# PD-09-0028 DRC DATE: July 30, 2009 -August 6, 2009 CONTACT.' Michael Garza, E.LT., Engineering Department, 972/304-7019 COMMENT STATUS: PRELIMINARY ~b ~~:-TLI~D ATiT~'I? D,P_7 1. Provide a location map. 2. Ensure that the house does not encroach the floodplain. There will not be any portion of the house or any structure allowed in the floodplain. We will require that the flood plain be staked out. 3. The finish floor must be a minimum of 2' above the base flood elevation. 4. We will require plans submitted for the connection of the utilities when the time comes. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-181 R2-SF-12, Bethel Road Estates, Lot 2 Block 1, a zoning change request from PD-181-SF-12 (Planned Development-181, Single Family- 12) to PD-181 R2-SF-12 (Planned Development-181, Revision 2-Single Family-12) to allow for a stucco finish instead of masonry as required in Section 12-11-5 of the Zoning Ordinance, on 2.348 acres of property located at 256 West Bethel Road, at the request of Terry Holmes, The Holmes Builders of Coppell, Ltd. STAFF REP.: Matthew S. Steer PROJECT ID# PD-09-0028 DRC DATE: July 30, 2009 and August 6, 2009 CONTACT.' Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: /PRELIMINARY EI~4b Ii'~i~ j ~f ~'T~'lJ D,P_7