Loading...
Number 28AGENDA REQUEST FORM T H E . ` 1 T " . a F DEPT: Engineering COPPELL DATE: August 26, 2008 r 9 0 x ' s ITEM #: 14 E] WORK SESSION 11 CONSENT IZI REGULAR ITEM TYPE: CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of a proposal from Dallas County, as provided for in the existing City /County Agreement to overlay the asphalt paving of the following streets: Sanders Loop, Holly Street and Nash Street south of Sandy Lake Road; with Dallas County furnishing labor, materials and equipment to perform the work; with the City of Coppell paying a cost of $124,886.87 as provided in the IMF fund; and authorizing the Mayor to sign and to execute any necessary documents. GOAL(S): 1111 .ECUTIVE SUMMARY: Approval will allow Dallas County crews to overlay several existing streets with asphalt to improve the driving surface. These streets were identified for the improvements in the IMF Five -Year Plan. FINANCIAL COMMENTS: Funds have been budgeted in the Infrastructure Maintenance Fund for this project. .RECOMMENDED ACTION: Staff recommends approval of the proposal. ACTION TAKEN BY COUNCIL: APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Faught S - Brancheau Vote - 6 -0 • Libby Ball Franklin absent 2008.08.28 11:08:06 05,00, #Dallas Co Asphalt Overlay r _ •� e �� � a { w u] 0 W I J w cnxD Q W Q I ul a a ff [v J Q d O a= D to g W J 10 'E L J • - _ ° WIn CK X l woo n 9 p z � fl y •x. Lf) p Q d u '� r� Vn¢ J X ` r rra < < T O A 41 LL EL r a' ! • r' ,fir i) r'r..r, k J Co +} W Z CD IT. A _ • pp . *E Vl F- RSr °", r a CL r i f 2 °l: rYr �— �''f �a�rw ? err K' •X rye FF r� °_� i =. 1 �. - LL a ii}TYf r t r� � Yi �j 3� h n;n r i a � t si �._.. � rr } s iv'` Yr rY d t tip, s t ;i o- -:.�` � 1- (1"'^(T f # ° t 'r�<: t =Jtin F r z _�` ...4}1� CD CD vf CD �M'•MR T Y :rt <r �ra r '�.'� ,' e� .. S J.Js Y•T° (rr��� �wv , C�,S,_rr n r c.c #1; f 'fir �.• s: ' iJ @ ! N LL ¢ yir nt a r T o cD CD CD �y CD t .rte Ta = • ' 4 � 5 o CONSTRUCTION ESTIMATE DALLAS COUNTY DISTRICT 4 KENNETH A. MAYFIELD COMMISSIONER FOR Sanders Loop CITY OF CoppeN ESCROW AMOUNT $60,727.00 DATE WAN TYPE E LIMITS Belt Une Rd Belt Line Rd EST.MArLS $31,152.00 EST. E.L.A. $29,575.00 EST. W.W.D. 8 PROJECT EST. $00,727.00 DESIGN EQU. 4 LENGTHILF. WIDTHILF. S.Y. I.D. NUMBER MILES COST PER MICE 1800 24 48W 28014 0.34090909 $178,132.53 MATERIALS EST. LBS./SY. QUANTITY UNITS UNIT COST SUB. TOTAL Traft Control 1 4800 Sy $0.25 $1,200.00 Prop. Sub -Gr. 1 4800 Sy $2.50 $12,000.00 Cw"m SW" (81) 44 105.6 Ton $170.00 $17,952.00 As$*R (MCS800) 0.3 1440 Gel $1.25 $1,800.00 Asphalt (Tacit) 0.1 480 Gal $3.78 $1,814.40 H.M.A.C. (Ty D) 220 528 Ton $45.00 $23,760.00 $31,152.00 EQUIPMENT EST. HOURS HR. DAY COST PER HR. NO.WWD 423 50 $28.00 8 $11,830.00 LABOR EST. HOURS HR. DAY COST PER HR. NO.WWD 710 84 $25.00 8 $17,745.00 TOTAL ESTIMATE $60,727.00 PREPARED SY DON XENNWY ROAD AND aRME SUPERWENDENT DISTRICT 4 CONSTRUCTION ESTIMATE DALLAS COUNTY DISTRICT 4 KENNETH A. MAYFIELD COMMISSIONER FOR Nash SL CRY OF CoppsN ESCROW AMOUNT $24,266.67 DATE 618/2008 TYPE E LBIm Sandy Lake Rd. End EST.MATLS $10,953.33 EST. E.L.A. $13,333.33 EST. W.W.D. 4 PROJECT EST. $24,286.67 DESIGN EQU. 0 LENGTHILF. WIDTHILF. S.Y. I.D. NUMBER MILES COST PER MILE 500 24 1333 28013 0.09469697 $256,467.20 MATERIALS EST. LBS./SY. QUANTITY UNITS UNIT COST SUB. TOTAL Traft Control 1 1333 Sy $0.35 $486.67 Prep.Sub -Gr. 1 1333 Sy $3.75 $5,000.00 Cement Slung (8") 44 29 Ton $170.00 $4,986.67 Asphalt (MCS800) 0.3 400 Gal $1.25 $500.00 Asphalt ( Tack) 0.1 133 Gal $3.78 $504.00 H.M.A.C. (Ty 0) 220 147 Ton $45.00 $6,600.00 $10,953.33 EQWPMENT EST. HOURS HR. DAY COST PER HR. NO.WWD 190 50 $28.00 4 $5,333.33 LABOR EST. HOURS HR. DAY COST PER HR. NO.WWD 320 84 $25.00 4 $8,000.00 TOTAL ESTIMATE $24,286.67 PREPARED BY DON KENNEDY ROAD AND eRI M SUPERMENDENT WTmcT 4 CONSTRUCTION ESTIMATE DALLAS COUNTY DISTRICT 4 KENNETH A. MAYFIELD COMMISSIONER FOR CITY OF DATE TYPE LIMITS EST.MArL8 EST. E.L.A. PROJECT EST, LENGTH ILF. 900 MATERIALS EST. Traffic Conbd Prep. Sup -Gr. Cement Skwy Asphalt (MCS800) Asphalt ( Tack ) H.MA.C. (Ty D) EQUIPMENT EST. LABOR EST. TOTAL ESTIMATE Holy SL HR. DAY Coppoll ESCROW AMOIMT 808/Y008 E HR.DAY Sandy Lake Rd. Clear Croak $20,623.20 Sy $19,230.W EST. W.W.D. $39,873.20 DESIGN EQU. WIDTHILF. S.Y. 24 2400 LBS./SY. QUANTITY 1 2400 1 2400 44 52.8 0.3 720 0.1 240 220 284 HOURS HR. DAY 275 50 HOURS HR.DAY 462 84 PREPARED BY DON KENNEDY ROAD MUD BRIDGE SUPERNiTENDEW DISTRICT 4 $39,873.20 6 0 I.D. NUMBER MILES COST PER MILE 28012 0.17045455 $233,922.77 UNITS UNIT COST SUB. TOTAL Sy $0.35 $840.00 Sy $3.75 $9,000.00 Ton $170.00 $8,976.00 Gal $1.25 $900.00 Gal $3.78 $907.20 Ton $45.00 $11,880.00 $2,623.20 COST PER HR. NO.WWD $28.00 6 $7,700.00 COST PER HR. NO.WWD $25.00 6 $11,550.00 $39,873.20 T H E C I T Y 0 F PPE'LL A g 1 S September 5, 2008 Kenneth A. Mayfield Dallas County Commissioner, District 4 411 Elm Street Dallas, TX 75202 RE: Asphalt Overlay Project 2008 Dear Commissioner Mayfield: On August 26, 2008, the referenced project was approved by Coppell's City Council. With this letter is enclosed the estimate, a check in the amount of $124,886.87 as payment for the entire estimated cost and an exhibit of the streets approved for overlay. Please have your superintendent contact me at 972/304 -3681 prior to beginning work on the project. If you have any questions or need any further information, please contact me at the number below. Sincerely, Keith R. Marvin, P.E. Project Engineer Office: (972) 304 -3681 Fax: (972) 304 -3570 Enclosures cc: Per Birdsall 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 CITY OF COPPELL Post Office Box 9478, Coppell, Texas 75019 (972) 462 - 0022 INVOICE DATE INVOICE NO. REMARKS ACCOUNT AMOUNT � -06 -08 HOLLY ST ASPHALT OVERLAY 01 -03 -14 -3210 39,873.20 3 -06 -08 NASH ST ASPHALT OVERLAY 01 -03 -14 -3210 24,286.67 8 -06 -08 SANDERS LO ASPHALT OVERLAY 01 -03 -14 -3210 60,727.00 T H S G r T Y. O_F 172865 COPPELL P.O. R9x 9478 CHECK NO. 1 72 8 5 Coppefl, Texas 75019 1 (972)1462-0022 FROST NATIONAL BANK CHECK DATE 08`-29 -2008 PAY *******124,886 DOLLARS AND 87 CENTS TO THE ORDER OF PAY THIS AMOUNT ****124,886.87 VOID AFTER 90 DAYS DALLAS COUNTY ROAD & BRIDGE DISTRICT #4 ATT: DALLAS COUNTY PUBLIC WORK,, 411 ELM STREET,- 4TH `FLOOR DALLAS, TX 75202 l■L72865ir 1 :4L40000931: 9S 0002169110 CITY OF COPPELL PAYMENT AUTHORIZATION MEMO Note: Use mouse to navigate inform Vendor #: 22000 Date: 4en +o., tio�008. Pay to: Dallas County Road & Bridge Dist 4 Address: 411 Elm Street, 4`h Floor Dallas TX 75202 Charge To: IMF Amount: $ 124,886.87 Description /Explanation: Asphalt overlay of Sanders Loop, Holly Street and Nash Street as approved by Council at Aug. 26, 2008 meeting ri.LAM'_ JEND UHECK TO ENGINEERING FOR DISBURSEMENT Approval: Updated 12/01/05 ACCOUNTING USE ONLY Approved for payment by: Date Paid: Check Number: Invoice No.