Number 26AGENDA REQUEST FORM 7 H E - C I T Y a F COPPELL DEPT: Engineering DATE: July 24, 2007 T p 'iA* ITEM #: 14 WORK SESSION CONSENT r7i REGULAR ITEM TYPE: CONTRACT /BID or PROPOSAL ITEM CAPTION: Consider approval of an Interlocal Agreement with Dallas County to overlay the asphalt paving of the following streets: Loch Lane, Howell Street, Bullock Street, Carter Drive, Christi Lane, Shadydale Lane, Willow Lane, Oak Trail, Shady Oaks Lane, Cottonwood Drive and Oak Grove Lane; with Dallas County furnishing labor, materials and equipment to perform the work; with the City of Coppell paying a cost of $205,237.44, as budgeted in the IMF; and authorizing the Mayor to sign. GOAL(S): I I I I i _ECUTIVE SUMMARY: Approval of this agreement will allow the resurfacing of the majority of our existing asphalt streets, as identified in the Infrastructure Maintenance Fund 5 -year plan for FY 06107. Staff recommends approval of the interlocal agreement with Dallas County and will be available to answer any questions at the Council meeting. FINANCIAL COMMENTS: Funds are available in the Infrastructure Maintenance Fund for this agreement. RECOMMENDED ACTION: Staff recommends approval of the Interlocal Agreement with Dallas County to overlay asphalt streets. ACTION TAKEN BY COUNCIL: APPROVED BY CITY COUNCIL ON ABOVE DATE Motion to Approve M - Franklin S - Peters Vote - 6 -0 Faught absent Libby Ball 2007.07.24 20:06:20 - 05'00' #Dallas Co Street ILA T H E • C t T Y • O F MEMORANDUM TO: Mayor and City Council FROM: Glenn Hollowell, P.E., Assistant Public Works Director DATE: July 24, 2007 REF: Consider approval of an Interlocal Agreement with Dallas County to overlay the asphalt paving of the following streets: Loch Lane, Howell Street, Bullock Street, Carter Drive, Chisti Lane, Shadydale Lane, Willow Lane, Oak Trail, Shady Oaks Lane, Cottonwood Drive and Oak Grove Lane; with Dallas County furnishing labor, materials and equipment to perform the work; with the City of Coppell paying a cost of $205,237.44, as budgeted in the IMF; and authorizing the Mayor to sign. The City of Coppell has budgeted funds in the Infrastructure Maintenance Fund for rehabilitation of the asphalt streets within the City. The FY 06/07 plan included all the streets referenced above. The total length of these streets is approximately 1.9 miles, which is almostl0,000 linear feet. These streets are all asphalt paving with borrow ditch style drainage outside the limits of the paving, so there will be no concrete repair associated with the project. Dallas County has provided a cost proposal of $205,237.44 to perform subgrade repair as necessary, milling the existing asphalt where required, and the asphalt overlay itself. The city will assist in this project by providing utility adjustments where required. This would be limited to adjusting the height of manhole covers and water valve boxes. The included Interlocal Agreement, when executed by both the City of Coppell and by Dallas County, would authorize Dallas County to perform the work as outlined above. The agreement also establishes terms of payment and areas of responsibility for the two parties. Dallas County has completed several asphalt paving projects within the City over the past few years under similar agreements, and we have been pleased with the results. The attached exhibit shows the streets to be resurfaced under this agreement. Staff recommends approval of this proposal from Dallas County for repair and asphalt overlay of the following streets: Loch Lane, Howell Street, Bullock Street, Carter Drive, Chisti Lane, Shadydale Lane, Willow Lane, Oak Trail, Shady Oaks Lane, Cottonwood Drive and Oak Grove Lane; in the amount of $205,237.44 as budgeted in IMF funds. Staff will be available to answer any questions at the Council meeting `pJN7Y pf0 W ff Z 7 �Tp of SE KENNETH A. MAYFIELD DALLAS COUNTY COMMISSIONER DISTRICT 4 June 12, 2007 Glenn D. Hollowell, P. E. Assistant Director of Public Works City of Coppell P.O. Box 9478 Coppell, TX 75019 Dear Mr. Hollowell, This is in response to your letter dated May 31, 2007, requesting repairs by my Road and Bridge crew on various streets in your city. I am happy to have my crew perform the agreed upon repairs. I have enclosed an ILA for approval through your city council for those repairs. At this time it appears my crew should begin work in late July or early August. If I am able to assist you on future street projects, please do not hesitate to contact me. Yours very truly, Kenneth A. Mayfield Dallas County Commissioner Road and Bridge District 4 n.AM/ 1b 411 ELM STREET • DALLAS, TEXAS 75202 214. 653.6670 • FAX:214. 653.7057 4403 W. ILLINOIS • DALLAS, TEXAS 75211 214. 339 -83R1 • FAX:214- 337 -9558 STATE OF TEXAS COUNTY OF DALLAS § INTERLOCAL AGREEMENT BETWEEN DALLAS COUNTY AND CITY/TOWN OF COPPELL FOR MILL AND OVERLAY OF NUMEROUS AVENUES, ROADS OR STREETS: SEE ATTACHED ESTIMATE FOR LIST OF AVENUES, ROADS, OR STREETS WHERE AS, the City of COPPELL, Texas, hereinafter called "City ", and the County of Dallas, Texas, hereinafter called "County ", desire to enter into an interlocal agreement for the purpose of mill and overlay of streets as shown on attached estimate, as further described by exhibit "A "; and, WHERE AS, Chapter 791 of the Texas Government Code, as amended, provides authorization for local governments to enter into interlocal contracts; NOW THEREFORE, THIS AGREEMENT is hereby made and entered into by City and County for the mutual consideration stated herein: WITNESSETH I. City has requested and County agrees to mill and overlay on listed Avenue, Road or Street, hereinafter called the "Project ", as further described in Exhibit "A" attached hereto and incorporated herein for all purposes. The Project is classified as a County Type "E" road project. II. County agrees to furnish materials, labor and equipment necessary and to perform the Project construction at a cost not to exceed $205,237.44, hereinafter called the "Not to Exceed Amount ". M. City agrees to pay to County the sum of $205,237.44 as City's portion of the cost of the Project. Such amount will be paid to County prior to the commencement of construction. Such amount will be deposited with County prior to the commencement of construction and County is authorized to expend such amount for periodic payments of Project cost. Road & Bridge District ILA (AM11 -1997) IV. City agrees to accomplish the following items, if required by the project, in a timely manner to insure that such items will not delay the County construction schedule; (1) inform the public of the proposed reconstruction of the Project; (2) locate all manholes, water valves, and other utilities within the Project; and (3) make or cause to be made all utility relocations or adjustments necessary for the Project at no cost to County. V. In the event that the cost of the Project shall exceed the Not to Exceed Amount, City and County agree to either reduce the scope of construction or seek additional funding to complete the project. At the termination of the Project, County will do a final cost accounting of the Project. In the event that the amount paid by City exceeds the actual cost, the difference will be remitted to City. In the event that additional funds are due, County will bill City who agrees to pay such funds within thirty (30) days of receipt of such billing. VI. The term of this agreement shall be from the date of the last signature approving the agreement until the completion of the Project and final payment as provided herein. VII. The City agrees that County shall have the right to enter upon the Project area for the time period necessary for the completion of the Project. City agrees to furnish such police personnel as requested by County for traffic control or other public safety matters at no cost to County. VIII. The County agrees to be responsible for any liability or damages the County may suffer as a result of claims, demands, costs or judgments, including all reasonable attorneys fees, against the County, including workers compensation claims, arising out of the performance of the construction and services under this agreement, or arising from any accident, injury or damage, whatsoever, to any person or persons, or to the property of any person(s) or corporation(s) occurring during the performance of this agreement and caused by the sole negligence of the County, its agents, officers and/or employees. IX. The City agrees to be responsible for any liability or damages the City may suffer as a result of claims, demands, costs or judgments, including reasonable attorneys fees, against the City, including workers compensation claims, arising out of the performance of the construction and services under this agreement, or arising from any accident, injury or damage, whatsoever, to any person or persons, or to the property of any person(s) or corporations(s) occurring during the performance of the agreement and caused by the sole negligence of the City, its agents, officers and/or employees. Road & Bridge District ILA (AM11 -1997) 2 X. City and County agree that any liability or damages as stated above occurring during the performance of this agreement caused by the joint or comparative negligence of their employees, agents and officers shall be determined in accordance with the comparative responsibility laws of the State of Texas. X1. City and County agree that County's obligation to perform the Project construction is contingent upon the receipt of City's payment of $205,237.44 and no construction on the Project will commence prior to the receipt by County of such payment. X11. This Agreement shall be expressly subject to the sovereign immunity of County and the governmental immunity of City, Title 5 of the Texas Civil Practice and Remedies Code, as amended, and all applicable federal and state law. This Agreement shall be governed by and construed in accordance with the laws and case decisions of the State of Texas. Exclusive venue for any legal action regarding this Agreement filed by either City or county shall be in Dallas County, Texas. The City of Coppell, State of Texas, has executed the Agreement pursuant to duly authorized City Council Resolution , Minutes Dated the day of , 2007. The County of Dallas, State of Texas, has executed this agreement pursuant to Commissioners Court Order Number and passed on the day of , 2007. CITY OF COUNTY OF DALLAS BY BY TITLE JIM FOSTER, COUNTY JUDGE ATTEST APPROVED AS TO FORM: CITY SECRETARY \ ATTORNEY Robert Schell, Chief Civil Section Dallas County District Attorney Road & Bridge District ILA (AM11 -1997) CONSTRUCTION ESTIMATE DALLAS COUNTY DISTRICT 4 KENNETH A. MAYFIELD COMMISSIONER EXHIBIT " A " FOR Mill & Overlay CITY OF Coppeil ESCROW AMOUNT $205,237.44 DATE 6/7/2007 TYPE E LIMITS See Below EST.MATLS $81,921.73 EST. E.L.A. $123,315.71 EST. W.W.D. 23 PROJECT EST. $205,237.44 DESIGN EQU. 0 LENGTH /LF. WIDTH /LF. S.Y. I.D. NUMBER MILES COST PER MILE 10072 0 27212 27012 1.90757576 $107,590.71 MATERIALS EST. LBS./SY. QUANTITY UNITS UNIT COST SUB. TOTAL Traffic Control 1 27212 SY $0.10 $2,721.20 Milling 150 2041 Ton $1.50 $3,061.35 Asphak ( Tack) 0.1 2721 Gal $3.78 $10,286.14 H.M.A.C. (TY D) 220 2993 Ton $45.00 $65,853.04 $81,921.73 EQUIPMENT EST. HOURS HR. DAY COST PER HR. NO.WWD 2176.96 96 $28.00 23 $60,954.88 LABOR EST. HOURS HR. DAY COST PER HR, NO.WWD 2494.433333 110 $25.00 23 $62,360.83 TOTAL ESTIMATE $205,237.44 PREPARED BY DON KENNEDY ROAD AND BRIDGE SUPERINTENDENT DISTRICT 4 STREET NAME FROM TO LENGTH WIDTH SY Loch 560 24 1493 Howell 635 24 1693 Bullock 720 24 1920 Carter 750 22 1833 Christi 1145 24 3053 Shadydale 1225 22 2994 Willow 350 22 856 Oak Trail 1235 22 3019 Shady Oak 350 22 856 Cotton Wood 2150 30 7167 Oak Grove 952 22 2327 10072 258 27212