Loading...
Floodplain Permit Form 2017 FLOODPLAIN DEVELOPMENT PERMIT PERMIT NO. NAME OF PERMITEE: The above named permitee applied for a FLOODPLAIN DEVELOPMENT PERMIT on The application has been reviewed by the FLOODPLAIN ADMINSTRATOR and it has been determined that the proposed development is located within an identifiable floodplain of: The FLOODPLAIN ADMINISTRATOR has reviewed plans and specifications of the proposed development for conformance with the development standards required by Floodplain Management Ordinance #2001-952, as amended. You are hereby authorized to proceed with the following described work: To maintain compliance with the development standards of Floodplain Management Ordinance #2001-952, as amended, and to eliminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: ( ) Compliance with the development standards of Floodplain Management Ordinance #2001-952, as amended, including but not limited to: For residential structures, the lowest floor (including basement) must be elevated to two (2) feet above the 100-year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification of the lowest floor must be submitted from a registered professional engineer, architect, or land surveyor. For non-residential structures, the lowest floor (including basement) must be elevated or flood-proofed to two (2) feet above the 100-year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification that the flood-proofing methods are adequate to withstand the flood depths, pressure, velocities, impact and uplift forces and other factors associated with the base flood must be submitted from a registered professional engineer or architect. For fill activities, the permittee must submit certification from a registered professional engineer or land surveyor that the level of the compacted fill materials is at or above the elevation of the Base Flood. ( ) Certified copy of all final plans or As-Built Drawings must be submitted to the FLOODPLAIN ADMINISTRATOR. ( ) OTHER PROVISIONS: Acknowledgement of Conditions by Permittee Printed Name Date Signature of FLOODPLAIN ADMINISTRATOR Printed Name Date