Loading...
Dallas County-CS171130 Priscilla Martinez From:George Marshall Sent:Thursday, November 30, 2017 4:37 PM To:Gene Moulden Cc:Darryl Zbranek; John Elias; Brad Reid; Priscilla Martinez; Scott Latta Subject:Re: Campion Trail MacArthur Blvd Extension We don’t charge fees for this type of project. But we will need full sets considering the plans are not split by the city. Get Outlook for iOS _____________________________ From: Gene Moulden <gmoulden@cityofirving.org> Sent: Thursday, November 30, 2017 4:21 PM Subject: RE: Campion Trail MacArthur Blvd Extension To: George Marshall <gmarshall@coppelltx.gov> Cc: Darryl Zbranek <dzbranek@coppelltx.gov>, John Elias <jelias@coppelltx.gov>, Brad Reid <breid@coppelltx.gov>, Priscilla Martinez <pmartinez@coppelltx.gov>, Scott Latta <wlatta@coppelltx.gov> George, We normally wave the permit fees on City projects, does Coppell do the same? This is a two mile plus trail project, do you want full sets? Or just the section in Coppell? Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org | CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, November 30, 2017 1:18 PM To: Gene Moulden Cc: Darryl Zbranek; John Elias; Brad Reid; Priscilla Martinez; Scott Latta Subject: RE: Campion Trail MacArthur Blvd Extension This is exactly what I needed. We will need 3 sets of paper plans for our use. CAD file (DWG) PDF copy of approved plans A copy of a Construction Development Permit Filled out.http://www.coppelltx.gov/Documents/Government/Engineering/Building%20Inspections/ENG- ConstructionDevelopmentFillable.pdf 1 We will hold a preconstruction meeting with the contractor, design engineer, Inspector etc. Please schedule with Priscilla when to hold the pre-con. Thank You, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Gene Moulden \[mailto:GMoulden@cityofirving.org\] Sent: Thursday, November 30, 2017 12:47 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: Darryl Zbranek <dzbranek@coppelltx.gov>; John Elias <JElias@coppelltx.gov>; Brad Reid <breid@coppelltx.gov> Subject: RE: Campion Trail MacArthur Blvd Extension George, My apologies, I thought the final H&H report had been submitted, please see the attached files. On the permitting, I was not aware any permitting was required. Let me know what is required and I will have the contractor submit. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org |CityofIrving.org From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, November 30, 2017 12:01 PM To: Gene Moulden Cc: Darryl Zbranek Subject: RE: Campion Trail MacArthur Blvd Extension Gene, The City of Coppell must issue a permit for any work in Coppell. So far that has not been completed. Once plans are approved, we will hold a pre-construction meeting at our office. I am not sure we ever finalized the info on the bridge crossing the creek. Thanks, George 2 George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Marcus Marion Sent: Thursday, November 30, 2017 11:55 AM To: George Marshall <GMarshall@coppelltx.gov> Subject: Fwd: Campion Trail MacArthur Blvd Extension GetOutlook for iOS From: Gene Moulden <GMoulden@cityofirving.org> Sent: Thursday, November 30, 2017 11:53:53 AM To: John Elias Cc: Brad Reid; Darryl Zbranek; Marcus Marion Subject: RE: Campion Trail MacArthur Blvd Extension See you then Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org |CityofIrving.org From: John Elias \[mailto:JElias@coppelltx.gov\] Sent: Thursday, November 30, 2017 11:51 AM To: Gene Moulden Cc: Brad Reid; Darryl Zbranek; Marcus Marion Subject: Re: Campion Trail MacArthur Blvd Extension Gene, Let's meet at 10:00. John Get Outlook for iOS From: Gene Moulden <GMoulden@cityofirving.org> Sent: Thursday, November 30, 2017 11:13:39 AM To: John Elias Cc: Brad Reid Subject: RE: Campion Trail MacArthur Blvd Extension 3 Yes, can we say 9:30 or 10? Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org |CityofIrving.org From: John Elias \[mailto:JElias@coppelltx.gov\] Sent: Thursday, November 30, 2017 11:02 AM To: Gene Moulden Cc: Brad Reid Subject: Re: Campion Trail MacArthur Blvd Extension Gene, We probably need to meet on site, I'll bring one of our inspectors. Can we meet in the morning some time? John Elias Park Project Manager Parks and Recreation City of Coppell, TX 972-462-5115 (office) www.coppelltx.gov 4 From: Gene Moulden <GMoulden@cityofirving.org> Sent: Wednesday, November 29, 2017 4:12:04 PM To: John Elias Cc: Brad Reid Subject: Campion Trail MacArthur Blvd Extension Greetings, The contractor has started on the section along Belt Line Road. There are a few questions: 1. There are 2 power poles are a little closer than the survey says. In this location, we had a 5’ grass parkway, do you want to have the trail just up against the curb here? 2. The contractor has found a manhole which was buried and not on the survey. Who do we need to contact to review, a new manhole cover will be needed as it was damaged in the excavation. 3. The contractor has requested an early morning concrete pour as not to effect traffic as much. Would this be permissible? He was talking 2-3 in the morning. If we need to meet on site to review, let me know. Gene Moulden | Planning Manager City of Irving |Capital Improvement Program 825 W. Irving Blvd. Irving, TX 75060 P: (972) 721-2719 C: (469) 446-4308 gmoulden@cityofirving.org |CityofIrving.org 5