Loading...
P_Bore/Street Cut permit THE.CITY.OF Page 1 of 4 COPPELL ~~*~~ e,\' "" q 1\ Ii . \ I'> DRY BORE / STREET CUT / SAW CUT PERMIT APPLICATION FOR WORK IN RIGHT-OF-WAY / EASEMENT Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. Date Submitted: Work Order # (if applicable) PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) D Plans provided and approved (Erosion Control/safety fences must be installed prior to beginning work) Project Name / Location: Company Name: Address: Telephone #: Emergency Telephone #: Permit issued to (Contractor Name) Utility Company Represented: D Oncor Electric Delivery D Time Warner Cable D Atmos Energy D CoServ Elec/Gas D Verizon D Other * D SBC / AT&T * If "Other" is checked, please note that franchise or right-of-way use agreements will be required. General Description of Work (provide copy of approved plans): ~ Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: YES D ~ Is removal of existing streets, alleys, or sidewalks necessary? YES D if YES, must have City inspection prior to concrete replacement NOD NoD Dry Bore / Street Cut / Saw Cut Permit Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at the applicants expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). ~ Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3500 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 ~ Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m. until 4:00 p.m. ONLY unless otherwise approved by City Engineer. ~ Attach Work Order (franchise only). ~ Contact must be made with City and utility companies to locate existing utilities 48 hours prior to beginning of work. Signature of Utility Company Representative Printed Name Date Signature of Contractor Representative Printed Name Date Signature of City Representative Printed Name Date (Application with original signatures needs to be submitted to the Engineering Department before approval.) ~ Comments: ~ NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. THE.CITY.OF Page 4 of 4 COPPELL Ii UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's WorkOrder # (if applicable) Sub-contractor Company Name 24 hr . Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL .:. Inspected by of Utilities Maintenance Division on and found to be acceptable / not acceptable because Follow-up scheduled for of Streets Maintenance Division on Follow-up needed? NO / YES .:. Inspected by and found to be acceptable / not acceptable because Follow-up needed? NO / YES Follow-up scheduled for A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570