P_Early Grading permit
THE.CITY.OF
COPPELL
EARL Y GRADING / EXCA V A TION PERMIT
IN
RIGHT-OF-WAY / EASEMENT / PRIVATE PROPERTY
Date:
o Grading plans provided and approved.
(Erosion Control must be installed prior to beginning work.)
o Tree Removal Permit from Parks & Recreation Dept. required.
o Hold Harmless Letter from the Property Owner/Engineer/Developer is attached.
Project Name/Location:
General Contractor:
Permit issued to Company/Representative:
Address:
Telephone #:
Emergency Telephone #:
General Description of work (provide copy of approved plans):
~ Was contact made with City and/or Utility Companies to locate existing utilities?
if NO, Reason:
DYES D NO
"Y Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit?
if NO, Reason:
DYES D NO
DYES 0 NO
"Y Is removal of existing street, alleys, or sidewalks necessary?
if YES, Attach Bore/Street Cut/Saw Cut Permit
"Y Is Floodplain Permit required?
DYES 0 NO
if YES, Permit #
or date of City Council variance
Early Grading / Excavation Permit
Page 2
Representative(s) of the Contractor must adhere to all construction standards approved by the
City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction
requirements (density tests will be required at the applicant's expense), Tree Ordinance and
barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s)
affected must be restored to as good condition as before the commencement of work
(grading, drainage, vegetation, and erosion control).
,. Any work requiring closing of a lane of traffic, street, or alley must be approved
by the Engineering Dept. with notification to the following prior to closing:
Police Department @ 972-304-3600
Fire Department @ 972-304-3500
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
,. Attach barricade plan / trench safety plan of a lane or street closure is required.
Note: Street closures are allowed from 9:00 a.m. until 4:00 p.m. ONLY unless
otherwise approved by City Engineer.
y A 2% inspection fee for grading is required prior to beginning work.
(Attach copy of excavation contract for verification)
II Amount Paid $
II
Date Paid
/
/
.:. City inspector must be notified 24 hours prior to beginning work related to this
permit.
Signature of Applicant/Contractor Rep.
Printed Name
Date
Signature of City Engineer
Printed Name
Date
City Inspector for this project
Contact Number(s)
Applicant shall indemnify and forever hold harmless against the City of Coppell each and
every claim, demand or cause of action that may be made or come against it by reason of or
if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work
by the applicant under permit from the City, if such permit is granted.
THE C TV OF
- - -
COPPELL
t\ .s \ l!>
INSPECTION FEE CALCULATION SHEET
DATE
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the
Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but
not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the
date of the Pre-construction Meeting.
PROJECT NAME
with completed
to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet
the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements
3
In order
calculations to
PUBLIC IMPROVEMENTS X4%= PRIVATE IMPROVEMENTS X2%=
CONTRACT AMOUNT CONTRACT AMOUNT
PAVING
WATER
SANITARY SEWER
STORM SEWER
ALLEYS
SIDEWALKS
OTHER
TOTAL
of 'I'
I $ I
Filelforms/feeinspeccost( 8/20/02