Loading...
P_Early Grading permit THE.CITY.OF COPPELL EARL Y GRADING / EXCA V A TION PERMIT IN RIGHT-OF-WAY / EASEMENT / PRIVATE PROPERTY Date: o Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) o Tree Removal Permit from Parks & Recreation Dept. required. o Hold Harmless Letter from the Property Owner/Engineer/Developer is attached. Project Name/Location: General Contractor: Permit issued to Company/Representative: Address: Telephone #: Emergency Telephone #: General Description of work (provide copy of approved plans): ~ Was contact made with City and/or Utility Companies to locate existing utilities? if NO, Reason: DYES D NO "Y Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit? if NO, Reason: DYES D NO DYES 0 NO "Y Is removal of existing street, alleys, or sidewalks necessary? if YES, Attach Bore/Street Cut/Saw Cut Permit "Y Is Floodplain Permit required? DYES 0 NO if YES, Permit # or date of City Council variance Early Grading / Excavation Permit Page 2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). ,. Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972-304-3600 Fire Department @ 972-304-3500 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 ,. Attach barricade plan / trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m. until 4:00 p.m. ONLY unless otherwise approved by City Engineer. y A 2% inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) II Amount Paid $ II Date Paid / / .:. City inspector must be notified 24 hours prior to beginning work related to this permit. Signature of Applicant/Contractor Rep. Printed Name Date Signature of City Engineer Printed Name Date City Inspector for this project Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. THE C TV OF - - - COPPELL t\ .s \ l!> INSPECTION FEE CALCULATION SHEET DATE As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. PROJECT NAME with completed to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements 3 In order calculations to PUBLIC IMPROVEMENTS X4%= PRIVATE IMPROVEMENTS X2%= CONTRACT AMOUNT CONTRACT AMOUNT PAVING WATER SANITARY SEWER STORM SEWER ALLEYS SIDEWALKS OTHER TOTAL of 'I' I $ I Filelforms/feeinspeccost( 8/20/02