Staff ReportITEM 6
Page 1 of 3
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
Northwest Gateway Plaza Site Plan
P&Z HEARING DATE: September 16, 2021
STAFF REP.: Matthew Steer, AICP, Development Services Administrator
LOCATION: On the north side of SH 121, approximately 2,500 feet west of Denton Tap Road
SIZE OF AREA: 4.05 acres of property
CURRENT ZONING: Highway Commercial (HC)
REQUEST: Site plan approval for six office & retail buildings totaling 39,130 square-feet
APPLICANT: Owner Engineer
Musdha Ventures, LLC. Homeyer Engineering
1193 W John Carpenter Freeway P.O. Box 294527
Irving, Texas 75039 Lewisville, Texas 75029
Amarender Reddy Steven Homeyer, PE
972-333-0542 972-906-9985
shomeyer@hei.us.com
HISTORY: This property has never been platted. The zoning was changed from Light Industrial to Highway
Commercial District in 2004.
HISTORIC COMMENT: This property has no historic significance.
TRANSPORTATION: State Highway 121 and service road.
SURROUNDING LAND USE & ZONING:
North: Concrete Batch Plant; Highway Commercial
South: SH 121; Highway Commercial
East: Residential and Office (under construction); PD-134R-SF-7 & Highway
Commercial
West: Vacant land; Highway Commercial
COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, shows this land as
appropriate for Freeway Special District use.
ITEM 6
Page 2 of 3
DISCUSSION: Site Plan
The Site Plan for Northwest Gateway Plaza located on Lot 1 identifies six
proposed buildings – (Building 1- 11,500 sq. ft., Building 2- 6,760 sq. ft.,
Building 3- 7,420 sq. ft., Building 4- 4,480 sq. ft., Building 5- 4,480 sq. ft.,
& Building 6- 4,490 sq. ft.). Building 1, located at the northern end of the
site, is proposed to be 2- story, and Buildings 2-6 are proposed to be one-
story. The site has one shared access point on the west property line. This
is proposed to be a fire lane and mutual access easement and will be required
to be shown on the future plat. There are 174 required parking spaces and
183 parking spaces proposed. As calculated, this will allow for 30% medical
office, 47% professional office and 23% retail uses. All buildings are
proposed to contain a mix of medical and professional office uses with the
two front buildings (Buildings 3 & 6) also allowing for retail uses. A
retaining wall is proposed to be constructed east of the parking lot. A 4-
foot metal fence is proposed on top of the wall. A 6-foot masonry screening
wall is proposed to be constructed on the east property line, adjacent to the
Coppell Greens residential subdivision. The screening wall will be required
to be constructed prior to the buildings going vertical. There is a large
detention area at the northeast corner of the site.
Landscape Plan
The Landscape Plan is compliant with the regulations of the Landscape
Section of the Zoning Ordinance. According to the Tree Survey, 55 trees
are proposed to be removed and 19 trees are proposed to be preserved. The
tree mitigation required for this site is $176,000. There are 63, 3” caliper
overstory trees required and 80, 4” caliper overstory trees proposed to be
planted. These consist of 6 Chinkapin Oaks, 15 Shumard Oaks, 5 Southern
Live Oaks, 24 Pond Cypress and 30 Cedar Elms.
Building Elevations, Lighting & Signage
Each of the proposed buildings are modern in architectural style. Five of
the buildings are proposed to be 24’ in height, and the northern one is 2-
story and 32’ in height. Each of the facades have brown stone as the primary
material, metal accents and an extensive amount of glazing. Metal canopies
are proposed at each entry.
A Photometric Study and Lighting Plan will be reviewed at the time of
Building Permit and shall comply with the Glare and Lighting standards of
the Zoning Ordinance. All signage for the site will be required to comply
with ordinance requirements.
Focal Point
Buildings are located on the eastern and western portions of the site and in
between the buildings a linear park area is proposed consisting of three
grassy areas. The first area is located towards the front of the site in between
the front two buildings and consists of two 5’ metal deer sculptures, native
grasses and a 5’ x 12’ wall/sign with the name of the development,
Northwest Gateway Plaza. North of this area is the second section, a
rectangular grassy area, lined with park benches at the edges and bollard
lights. Trees will be planted within this area and accent trees and shrubs
ITEM 6
Page 3 of 3
will line the eastern and western perimeter of this grassy area. A third
square shaped grassy area is north of the second section and will contain
two additional trees, benches and bollard lights.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of Northwest Gateway Plaza, subject to the following conditions:
1. There will be additional comments at the time of Detail Engineering Review and Building Permit.
2. A plat will be required to be filed of record prior to permitting.
3. All attached building signage shall comply with the Sign Section of the Zoning Ordinance.
4. Submission of the Photometric Study and Lighting Plan will be required at the time of Building Permit,
to ensure compliance with Glare and Lighting Standards of the Zoning Ordinance.
5. The 6’ screening wall will be required to be constructed prior to the buildings going vertical.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
4. Take under advisement for reconsideration at a later date
ATTACHMENTS:
1. Site Plan
2. Tree Survey
3. Landscape Plan
4. Elevations
5. Details
6. Focal Point
7. Material Board