Elevations 9-16-2021R-1 S-1M-1G-1 A-1ST-1
E-1N-1 E-1N-1
R-1 S-1 M-1 G-1A-1 ST-1
W-1 G-1
BUILDING #1
BUILDING #4BUILDING #2
BUILDING #3
BUILDING #5
BUILDING #6
PROPOSED DETENTION
POND AREA
EXTERIOR FINISH SCHEDULE
FIN. #MATERIAL
ST-1
WOODW-1
TYPE 1 STUCCO
(3 COAT PORTLAND CEMENT PLASTER)
E-1
MATERIAL TABLE
ALUMINUM METAL TYP.
PRE-FIN ALUMINUM METAL TYP.
G-1 GLAZING
FACADE PLAN NOTES
THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES
ONLY.ALL BUILDING PLANS REQUIRE REVIEW AND
APPROVAL BY DEVELOPMENT SERVICES.
ALL MECHANICAL UNITES SHALL BE SCREENED FROM
PUBLIC VIEW AS REQUIRED BY THE ZONING ORDINANCE.
WHEN PERMITTED , EXPOSED UTILITY BOXES AND
CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.
ALL SIGNAGE AREAS ARE LOCATIONS ARE SUBJECT TO
APPROVAL BY DEVELOPMENT SERVICES.
ROOF ACCESS SHALL BE PROVED INTERNALLY UNLESS
OTHERWISE PERMITTED BY THE CHIEF BUILDING OFFICIAL.
N-1 SIGNAGE AREA
R-1 ROOFTOP UNIT (TENTATIVE)
A-1 PRE-FIN METAL COPING
METALM-1
STUCCO
(ST)
STONE
(S)
METAL
(M)
WOOD
(W)
GLAZING
(G)
STONES-1
R-1S-1M-1G-1 A-1ST-1
E-1 G-1 M-1 S-1
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
WOODSTONEGLASS / DOOR FACADE AREA NET SURFACE AREA
MASONRY MATERIAL
STUCCO
366 SF
LONG LASTING
12%2,329 SF 824 SF 1,338 SF 42%
MTL COPING
26%34 SF 1%
567 SF - SF 111 SF 22 SF29%-%6%1%
1,552 SF 1,581 SF 732 SF 153 SF 200 SF23%5%6%34 SF 1%
BUILDING ELEVATIONS AREAS
BLDG#1
50%3,133 SF
CORRUGATED MTL
386 SF 20%
491 SF 16%
- SF -%573 SF 18%
1,967 SF 865 SF 44%1102 SF
3,153 SF
567 SF - SF 111 SF 22 SF29%-%6%1%386 SF 20%1,967 SF 865 SF 44%1102 SF
E-1G-1S-1
R-1 S-1 M-1 G-1A-1 ST-1
R-1 S-1 M-1A-1 ST-1
S-1 S-1E-1N-1G-1
A-3.01EXTERIOR ELEVATIONSSCALE 1/8"=1'-0''
SOUTH ELEVATIONA1 11D-2020
ARCHITECT+
ASSOCIATES, INC.NORTHWESTGATEWAY PLAZAMR.VIJAYMR.NADIMProposedEAST ELEVATIONB1
NORTH ELEVATIONC1
NTS
KEY PLANA4
A1
A-3.01
C1
A-3.01
B1
A-3.01
B2
A-3.01
SCALE 1/8"=1'-0''
SCALE 1/8"=1'-0''BUILDING #1WEST ELEVATIONB2SCALE 1/8"=1'-0''
A
T
TS XETEFO SARUDRA K U MAR T
HAPA272 7 5REGISTEREDARCHITECT
R-1 S-1M-1G-1
E-1N-1
A-1ST-1 R-1 S-1 M-1 G-1
E-1N-1
A-1 ST-1 W-1
W-1
BUILDING #1
BUILDING #4BUILDING #2
BUILDING #3
BUILDING #5
BUILDING #6
PROPOSED DETENTION
POND AREA
EXTERIOR FINISH SCHEDULE
FIN. #MATERIAL
ST-1
WOODW-1
TYPE 1 STUCCO
(3 COAT PORTLAND CEMENT PLASTER)
E-1
MATERIAL TABLE
ALUMINUM METAL TYP.
PRE-FIN ALUMINUM METAL TYP.
G-1 GLAZING
FACADE PLAN NOTES
THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES
ONLY.ALL BUILDING PLANS REQUIRE REVIEW AND
APPROVAL BY DEVELOPMENT SERVICES.
ALL MECHANICAL UNITES SHALL BE SCREENED FROM
PUBLIC VIEW AS REQUIRED BY THE ZONING ORDINANCE.
WHEN PERMITTED , EXPOSED UTILITY BOXES AND
CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.
ALL SIGNAGE AREAS ARE LOCATIONS ARE SUBJECT TO
APPROVAL BY DEVELOPMENT SERVICES.
ROOF ACCESS SHALL BE PROVED INTERNALLY UNLESS
OTHERWISE PERMITTED BY THE CHIEF BUILDING OFFICIAL.
N-1 SIGNAGE AREA
R-1 ROOFTOP UNIT (TENTATIVE)
A-1 PRE-FIN METAL COPING
METALM-1
STUCCO
(ST)
STONE
(S)
METAL
(M)
WOOD
(W)
GLAZING
(G)
STONES-1
R-1S-1M-1G-1 A-1ST-1
E-1 M-1 S-1G-1
ST-1
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
WOODSTONEGLASS / DOOR FACADE AREA NET SURFACE AREA
MASONRY MATERIAL
STUCCO
485 SF
LONG LASTING
17%1,698 SF 1,167 SF2,865 SF 754 SF 26%
MTL COPING
41%40 SF 1%
858 SF - SF 169 SF 22 SF
1,490 SF 632 SF 42%
-%11%1%
1,110 SF 1,755 SF 979 SF 225 SF 199 SF34%8%7%40 SF 1%
BUILDING ELEVATIONS AREAS
BLDG#2
39%
1,490 SF 632 SF 42%
858 SF
2,865 SF
CORRUGATED MTL
312 SF 11%
431 SF - SF 169 SF 22 SF29%-%11%1%235 SF 16%
- SF -%393 SF 14%
431 SF 29%235 SF 16%
S-1 M-1 G-1A-1 ST-1 R-1 S-1 M-1 G-1A-1 ST-1
E-1G-1
R-1R-1
S-1 ST-1N-1
R-1S-1 M-1 G-1A-1 ST-1
E-1M-1S-1
ST-1
A-3.01EXTERIOR ELEVATIONS11D-2020
ARCHITECT+
ASSOCIATES, INC.NORTHWESTGATEWAY PLAZAMR.VIJAYMR.NADIMProposedNTS
KEY PLANA4 BUILDING #2SCALE 1/8"=1'-0''
NORTH ELEVATIONA1
WEST ELEVATIONB1
SOUTH ELEVATIONC1
EAST ELEVATIOND1
SCALE 1/8"=1'-0''
SCALE 1/8"=1'-0''
SCALE 1/8"=1'-0''
C1
A-3.01
A1
A-3.01
D1
A-3.01
B1
A-3.01
A
TTS XETEFO SARUDRA K U MAR T
HAPA272 7 5REGISTEREDARCHITECT
R-1 S-1M-1G-1
E-1N-1
A-1ST-1 R-1 S-1 M-1 G-1
E-1N-1
A-1 ST-1 W-1
W-1
BUILDING #1
BUILDING #4BUILDING #2
BUILDING #3
BUILDING #5
BUILDING #6
PROPOSED DETENTION
POND AREA
EXTERIOR FINISH SCHEDULE
FIN. #MATERIAL
ST-1
WOODW-1
TYPE 1 STUCCO
(3 COAT PORTLAND CEMENT PLASTER)
E-1
MATERIAL TABLE
ALUMINUM METAL TYP.
PRE-FIN ALUMINUM METAL TYP.
G-1 GLAZING
FACADE PLAN NOTES
THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES
ONLY.ALL BUILDING PLANS REQUIRE REVIEW AND
APPROVAL BY DEVELOPMENT SERVICES.
ALL MECHANICAL UNITES SHALL BE SCREENED FROM
PUBLIC VIEW AS REQUIRED BY THE ZONING ORDINANCE.
WHEN PERMITTED , EXPOSED UTILITY BOXES AND
CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.
ALL SIGNAGE AREAS ARE LOCATIONS ARE SUBJECT TO
APPROVAL BY DEVELOPMENT SERVICES.
ROOF ACCESS SHALL BE PROVED INTERNALLY UNLESS
OTHERWISE PERMITTED BY THE CHIEF BUILDING OFFICIAL.
N-1 SIGNAGE AREA
R-1 ROOFTOP UNIT (TENTATIVE)
A-1 PRE-FIN METAL COPING
METALM-1
STUCCO
(ST)
STONE
(S)
METAL
(M)
WOOD
(W)
GLAZING
(G)
STONES-1
R-1S-1M-1G-1 A-1ST-1
E-1 M-1 S-1G-1
ST-1
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
WOODSTONEGLASS / DOOR FACADE AREA NET SURFACE AREA
MASONRY MATERIAL
STUCCO
503 SF
LONG LASTING
16%1,926 SF 1,194 SF3,120 SF 988 SF 32%
MTL COPING
38%43 SF 1%
858 SF 431 SF - SF 169 SF 22 SF
1,490 SF 632 SF 42%
29%-%11%2%
1,290 SF 1,830 SF 995 SF 225 SF 217 SF32%7%7%43 SF 1%
BUILDING ELEVATIONS AREAS
BLDG#3
41%
1,490 SF 632 SF 42%
858 SF
3,120 SF
CORRUGATED MTL
235 SF 16%
378 SF 12%
431 SF - SF 169 SF 22 SF29%-%11%2%235 SF 16%
- SF -%393 SF 13%
S-1 M-1 G-1A-1 ST-1 R-1 S-1 M-1 G-1A-1 ST-1
E-1G-1
R-1R-1
S-1 ST-1N-1
R-1S-1 M-1 G-1A-1 ST-1
E-1M-1S-1
ST-1
A-3.01EXTERIOR ELEVATIONS11D-2020
ARCHITECT+
ASSOCIATES, INC.NORTHWESTGATEWAY PLAZAMR.VIJAYMR.NADIMProposedNTS
KEY PLANA4 BUILDING #3SCALE 1/8"=1'-0''
WEST ELEVATIONA1
SOUTH ELEVATIONB1
NORTH ELEVATIONC1
EAST ELEVATIOND1
D1
A-3.01
C1
A-3.01
A1
A-3.01
SCALE 1/8"=1'-0''
SCALE 1/8"=1'-0''
SCALE 1/8"=1'-0''
B1
A-3.01
A
TTS XETEFO SARUDRA K U MAR T
HAPA272 7 5REGISTEREDAR
C
HI
TECT
R-1 S-1 M-1 G-1 A-1 ST-1
E-1N-1M-1S-1
R-1 S-1 M-1 G-1A-1 ST-1
BUILDING #1
BUILDING #4BUILDING #2
BUILDING #3
BUILDING #5
BUILDING #6
PROPOSED DETENTION
POND AREA
EXTERIOR FINISH SCHEDULE
FIN. #MATERIAL
ST-1
WOODW-1
TYPE 1 STUCCO
(3 COAT PORTLAND CEMENT PLASTER)
E-1
MATERIAL TABLE
ALUMINUM METAL TYP.
PRE-FIN ALUMINUM METAL TYP.
G-1 GLAZING
FACADE PLAN NOTES
THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES
ONLY.ALL BUILDING PLANS REQUIRE REVIEW AND
APPROVAL BY DEVELOPMENT SERVICES.
ALL MECHANICAL UNITES SHALL BE SCREENED FROM
PUBLIC VIEW AS REQUIRED BY THE ZONING ORDINANCE.
WHEN PERMITTED , EXPOSED UTILITY BOXES AND
CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.
ALL SIGNAGE AREAS ARE LOCATIONS ARE SUBJECT TO
APPROVAL BY DEVELOPMENT SERVICES.
ROOF ACCESS SHALL BE PROVED INTERNALLY UNLESS
OTHERWISE PERMITTED BY THE CHIEF BUILDING OFFICIAL.
N-1 SIGNAGE AREA
R-1 ROOFTOP UNIT (TENTATIVE)
A-1 PRE-FIN METAL COPING
METALM-1
STUCCO
(ST)
STONE
(S)
METAL
(M)
WOOD
(W)
GLAZING
(G)
STONES-1
BLDG#4
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
WOODSTONEGLASS / DOOR FACADE AREA NET SURFACE AREA
MASONRY MATERIAL
STUCCO
111 SF
LONG LASTING
8%829 SF633 SF
MTL COPING
43%22 SF 1%
544 SF - SF 142 SF 28 SF30%-%8%1%
BUILDING ELEVATIONS AREAS
CORRUGATED MTL
244 SF 13%
- SF -%
1,844 SF 886 SF 48%958 SF
1,462 SF
566 SF - SF 28 SF31%-%1%306 SF 17%1,844 SF 802 SF 43%1,042 SF
633 SF 43%1,462 SF
142 SF 8%
464 SF 32%235 SF 16%
111 SF 8%829 SF 22 SF 1%- SF -%464 SF 32%235 SF 16%
R-1S-1M-1G-1 A-1ST-1
M-1 S-1E-1 G-1
R-1 S-1 M-1 G-1A-1 ST-1
M-1S-1 E-1G-1
R-1 S-1 M-1 G-1A-1 ST-1 R-1S-1M-1G-1 A-1ST-1S-1
E-1N-1
A-3.01EXTERIOR ELEVATIONS11D-2020
ARCHITECT+
ASSOCIATES, INC.NORTHWESTGATEWAY PLAZAMR.VIJAYMR.NADIMProposedNTS
KEY PLANA4
C1
A-3.01
B1
A-3.01
D1
A-3.01
A1
A-3.01
BUILDING #4EAST ELEVATIONA1SCALE 1/8"=1'-0''
NORTH ELEVATIONB1SCALE 1/8"=1'-0''
SOUTH ELEVATIONC1SCALE 1/8"=1'-0''
WEST ELEVATIOND1SCALE 1/8"=1'-0''
A
TTS XETEFO SARUDRA K U MAR T
HAPA272 7 5REGISTEREDARCHITECT
R-1 S-1 M-1 G-1 A-1 ST-1
E-1N-1M-1S-1
R-1 S-1 M-1 G-1A-1 ST-1
BUILDING #1
BUILDING #4BUILDING #2
BUILDING #3
BUILDING #5
BUILDING #6
PROPOSED DETENTION
POND AREA
EXTERIOR FINISH SCHEDULE
FIN. #MATERIAL
ST-1
WOODW-1
TYPE 1 STUCCO
(3 COAT PORTLAND CEMENT PLASTER)
E-1
MATERIAL TABLE
ALUMINUM METAL TYP.
PRE-FIN ALUMINUM METAL TYP.
G-1 GLAZING
FACADE PLAN NOTES
THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES
ONLY.ALL BUILDING PLANS REQUIRE REVIEW AND
APPROVAL BY DEVELOPMENT SERVICES.
ALL MECHANICAL UNITES SHALL BE SCREENED FROM
PUBLIC VIEW AS REQUIRED BY THE ZONING ORDINANCE.
WHEN PERMITTED , EXPOSED UTILITY BOXES AND
CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.
ALL SIGNAGE AREAS ARE LOCATIONS ARE SUBJECT TO
APPROVAL BY DEVELOPMENT SERVICES.
ROOF ACCESS SHALL BE PROVED INTERNALLY UNLESS
OTHERWISE PERMITTED BY THE CHIEF BUILDING OFFICIAL.
N-1 SIGNAGE AREA
R-1 ROOFTOP UNIT (TENTATIVE)
A-1 PRE-FIN METAL COPING
METALM-1
STUCCO
(ST)
STONE
(S)
METAL
(M)
WOOD
(W)
GLAZING
(G)
STONES-1
BLDG#5
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
WOODSTONEGLASS / DOOR FACADE AREA NET SURFACE AREA
MASONRY MATERIAL
STUCCO
111 SF
LONG LASTING
8%829 SF633 SF
MTL COPING
43%22 SF 1%
544 SF - SF 142 SF 28 SF30%-%8%1%
BUILDING ELEVATIONS AREAS
CORRUGATED MTL
244 SF 13%
- SF -%
1,844 SF 886 SF 48%958 SF
1,462 SF
566 SF - SF 28 SF31%-%1%306 SF 17%1,844 SF 802 SF 43%1,042 SF
633 SF 43%1,462 SF
142 SF 8%
464 SF 32%235 SF 16%
111 SF 8%829 SF 22 SF 1%- SF -%464 SF 32%235 SF 16%
R-1S-1M-1G-1 A-1ST-1
M-1 S-1E-1 G-1
R-1 S-1 M-1 G-1A-1 ST-1
M-1S-1 E-1G-1
R-1 S-1 M-1 G-1A-1 ST-1 R-1S-1M-1G-1 A-1ST-1S-1
E-1N-1
A-3.01EXTERIOR ELEVATIONS11D-2020
ARCHITECT+
ASSOCIATES, INC.NORTHWESTGATEWAY PLAZAMR.VIJAYMR.NADIMProposedNTS
KEY PLANA4
C1
A-3.01
B1
A-3.01
D1
A-3.01
A1
A-3.01
BUILDING #5EAST ELEVATIONA1SCALE 1/8"=1'-0''
NORTH ELEVATIONB1SCALE 1/8"=1'-0''
SOUTH ELEVATIONC1SCALE 1/8"=1'-0''
WEST ELEVATIOND1SCALE 1/8"=1'-0''
A
TTS XETEFO SARUDRA K U MAR T
HAPA272 7 5REGISTEREDARC
H
I
TECT
R-1 S-1 M-1 G-1 A-1 ST-1
E-1N-1M-1S-1
R-1 S-1 M-1 G-1A-1 ST-1
BUILDING #1
BUILDING #4BUILDING #2
BUILDING #3
BUILDING #5
BUILDING #6
PROPOSED DETENTION
POND AREA
EXTERIOR FINISH SCHEDULE
FIN. #MATERIAL
ST-1
WOODW-1
TYPE 1 STUCCO
(3 COAT PORTLAND CEMENT PLASTER)
E-1
MATERIAL TABLE
ALUMINUM METAL TYP.
PRE-FIN ALUMINUM METAL TYP.
G-1 GLAZING
FACADE PLAN NOTES
THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES
ONLY.ALL BUILDING PLANS REQUIRE REVIEW AND
APPROVAL BY DEVELOPMENT SERVICES.
ALL MECHANICAL UNITES SHALL BE SCREENED FROM
PUBLIC VIEW AS REQUIRED BY THE ZONING ORDINANCE.
WHEN PERMITTED , EXPOSED UTILITY BOXES AND
CONDUITS SHALL BE PAINTED TO MATCH THE BUILDING.
ALL SIGNAGE AREAS ARE LOCATIONS ARE SUBJECT TO
APPROVAL BY DEVELOPMENT SERVICES.
ROOF ACCESS SHALL BE PROVED INTERNALLY UNLESS
OTHERWISE PERMITTED BY THE CHIEF BUILDING OFFICIAL.
N-1 SIGNAGE AREA
R-1 ROOFTOP UNIT (TENTATIVE)
A-1 PRE-FIN METAL COPING
METALM-1
STUCCO
(ST)
STONE
(S)
METAL
(M)
WOOD
(W)
GLAZING
(G)
STONES-1
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
WOODSTONEGLASS / DOOR FACADE AREA NET SURFACE AREA
MASONRY MATERIAL
STUCCO
125 SF
LONG LASTING
8%832 SF633 SF 464 SF 32%
MTL COPING
43%22 SF 1%
113 SF28%6%7%1%
BUILDING ELEVATIONS AREAS
BLDG#6
CORRUGATED MTL
12%
- SF -%235 SF 16%
1,931 SF 886 SF 46%
1,465 SF
533 SF - SF 28 SF27%-%1%306 SF 16%1,942 SF 802 SF 41%1,140 SF
627 SF 43%1,476 SF 849 SF 169 SF 12%32%22 SF 1%- SF -%
285 SF 15%
235 SF 16%464 SF
1,045 SF 544 SF 142 SF 28 SF244 SF
R-1S-1M-1G-1 A-1ST-1
M-1 S-1E-1 G-1
R-1S-1M-1G-1 A-1ST-1
M-1 S-1E-1 G-1
R-1 S-1 M-1 G-1A-1 ST-1
M-1S-1 E-1G-1
ST-1 R-1 S-1 M-1 G-1A-1 ST-1
M-1S-1 E-1G-1
ST-1
R-1 S-1 M-1 G-1A-1 ST-1 R-1 S-1 M-1 G-1A-1 ST-1S-1
E-1N-1
R-1 S-1 M-1 G-1A-1 ST-1 R-1 S-1 M-1 G-1A-1 ST-1S-1
E-1N-1
A-3.01EXTERIOR ELEVATIONS11D-2020
ARCHITECT+
ASSOCIATES, INC.NORTHWESTGATEWAY PLAZAMR.VIJAYMR.NADIMProposedNTS
KEY PLANA4 BUILDING #6EAST ELEVATIONA1SCALE 1/8"=1'-0''
NORTH ELEVATIONB1SCALE 1/8"=1'-0''
SOUTH ELEVATIONC1SCALE 1/8"=1'-0''
WEST ELEVATIOND1SCALE 1/8"=1'-0''
C1
A-3.01
B1
A-3.01
D1
A-3.01
A1
A-3.01
A
TTS XETEFO SARUDRA K U MAR T
HAPA272 7 5REGISTEREDARCHITECT