Loading...
Council Memo1 MEMORANDUM To: Mayor and City Council From: Mindi Hurley, Director of Community Development Date: November 14, 2023 Reference: PUBLIC HEARING: Consider approval of PD-312-HC, Lovett Coppell Business Park, a zoning change request from HC (Highway Commercial) to PD-312-HC (Planned Development-312-Highway Commercial) to allow the Conceptual Plan for a 14,100-sf, 2-story office building and a 18,200-sf, 2-story office/retail building and a Detail Plan for a retention pond and a 257,600 square foot office/warehouse on approximately 17.7 acres of property located at the northeast corner of SH 121 and Business 121 and an amendment to the 2030 Comprehensive Master Plan from Freeway Commercial to Industrial Special District on the 13.2 acre office/warehouse portion, at the request of Lovett Industrial, LLC, being represented by Dan Gallagher, Kimley-Horn and Associates, Inc. 2040: Create Business and Innovation Nodes Introduction: This is a three-part request. Part one is to establish a Conceptual Planned Development for two office/retail lots, an office/warehouse use and a retention pond on 17.7 acres of property, located at the northeast corner of SH 121 and Business 121. Part two is a Detail Planned Development for a 257,600 square foot office/warehouse building and retention pond on 14.7 acres represented in red (Lot 1) on the Lot Lines & Area Exhibit. The third part is also associated with the office/warehouse component, which requires a change to the future land use map from Freeway Special District to Industrial Special District for Lot 1 (not including the retention pond). Background: Concept Plan: The purpose of the Concept Plan is to establish the preliminary layout of uses and circulation patterns to support the different phases of development. The office/warehouse is proposed for the first phase, to be constructed on the northern portion of the site, adjacent to a Light Industrial vacant property to the north which is partially located in Lewisville. To the east is a concrete batch plant & vacant land and to the west is vacant land. On the south end of the proposal is a walking trail that surrounds the 2 central retention pond with an artistic fountain. This serves as a focal feature for the project. Lots 2 and 3 are planned for 2 story office and office/retail buildings that will bookend the retention pond for Lot 1. The conceptual office and office/retail buildings generally contain the same materials as the office/warehouse, except have much less tilt wall. No tenants are currently proposed for these two lots and the layouts are expected to change based on the user. A detail plan will be required to come back through the zoning process for each of these lots if there are significant changes from what is shown. If not, then, the detail plans may be processed administratively. This application includes a comprehensive list of PD conditions to address the development of this site. This can be found in the Proposed PD Conditions Exhibit (attached). Detail Site Plan – Office/Warehouse: The 257,600 square foot office/warehouse proposed is proposed to be located on the northern portion of the entire site and would the first phase of development. It is proposed to be constructed on 14.7 acres along with the retention pond area. This is adjacent to a vacant tract of land to the north that is currently zoned for light industrial uses. Dock doors will be located on the northern portion of the building and a screening wing wall will be constructed on the west end of the truck court area. This is a speculative building and could be used for one or multiple tenants. The south side of the building has car parking spaces adjacent to it and the north will have truck parking. The applicant is requesting an exception to the parking requirement for warehouse to be one parking space for each employee on the maximum working shift plus space to accommodate all trucks and other vehicles used in connection therewith, but not less than one parking space for each 2,000 square feet of floor area. The standard warehouse parking ratio listed in the Zoning Ordinance is one parking space per 1,000 square feet. If this exception is granted at 1 parking space per 2,000 square feet and given 5% of the proposed building will be devoted to office use which is calculated at a one parking space per 300 square feet ratio, then 146 parking spaces will be required. The proposal is showing 175 parking spaces. The building is approximately 50 feet in height. It will be made of concrete tilt wall with form liner and reveals. This will consist of three main colors - beige, darker beige and a light grey, all neutral in color. Clerestory windows and reveals will be added between each of the entries to add interest to the long expanse of the wall. The entries will have 8” X 24” smooth stone, light grey in color and an aluminum and glass storefront system with metal panels accenting the entries. Building signage will need to comply with the sign requirements of the Zoning Ordinance. Landscape Plan/Tree Mitigation: The Landscape Plans provided show that Lots 1-3 meet the minimum area requirements. Lots 2 & 3 meet the tree planting requirements. The office/warehouse site (Lot 1) contains a retaining wall along the east and north property line. The required perimeter trees (one per 50’) have been relocated from this area to provide trees where they would have more impact on the aesthetics of the site and won’t impact the retaining walls. The overstory trees have been upgraded to 4” caliper where only 3” caliper is required. In terms of tree mitigation, the applicant is clear cutting the entire site. They were initially requesting that some of the mitigation amount be reduced but have since withdrawn that from their proposal. A total of 7,523 caliper inches are being removed totaling $1,512,550 in mitigation fees after a landscape credit has been applied. 3 Land Use Amendment: This property was a part of a city-initiated effort, 20 years ago, to establish Highway Commercial (HC) zoning along the freeway frontages to enhance development standards, ensuring that the limited freeway frontage and entry portals into the City of Coppell are of the high-quality developments envisioned. The 2030 Master Plan adopted in 2011, echoed that intent by designating this area as Freeway Special District. The request before you will leave the 4.5 acres fronting on SH 121, Freeway Special District and change the 13.2 acres located to the north to Industrial Special District. Staff supports the land use plan change because: • The proposed request will provide a 257,600-sf office warehouse building adjacent to another property with industrial zoning to the north. • The access to and from the site is challenging because of one-way highway frontage. • The applicant has demonstrated that it is not feasible to construct a north/south drive that connects this property from SH 121 to Vista Ridge Boulevard to the north to improve the accessibility situation because of significant grade change. Benefit to the Community: This project will expand and enhance the community’s access to retail and office uses by offering these services on SH 121 frontage road. A retention pond with a walking trail will provide a focal point to the development and provide the customers and employees opportunity for exercise. Legal Review: The City Attorney was at the Planning and Zoning Commission Meeting on October 19, 2023. Fiscal Impact: This will generate additional sales tax and business personal property tax. Recommendation: On Thursday, October 19, 2023, the Planning & Zoning Commission (6-0) recommended approval of the three-part request subject to: 1. Additional comments may be generated upon detailed engineering review. 2. On the Landscape Plan for Lot 1, rectify discrepancies between trees shown on the within the chart totals to what is listed as required/provided and what is listed in the plant schedule. 3. Include the wing wall height as 16 feet or greater on the Site Plan and depict on the Elevations for Lot 1. 4. The Proposed PD Conditions Exhibit be modified to include the following conditions: a. Greater than 50% of the required parking shall be allowed in the front yard for the two commercial properties, as shown. b. The proposed materials and colors will remain consistent throughout the PD, as noted on the Conceptual Elevations. c. The multi-tenant monument sign shall be allowed to display tenant names throughout the conceptual development, regardless of which lot they are located. d. The perimeter trees for Lot 1 shall be allowed to be as shown on the Detail Landscape Plan for Lot 1 due to the retaining wall on the north and east perimeters. 5. Ensure the chart on the Concept and Detail Site Plans correctly reflect the Proposed PD Conditions Exhibit, as modified. 4 6. Remove “cellular antenna” from the Distribution Center Definition. These conditions have since been addressed. The Community Development Department recommends approval of the Concept Plan, Detail Plan and Future Land Use Plan amendment, subject to the following conditions: 1. The property be platted in accordance with the Subdivision Ordinance and regulations. 2. The conditions as outlined in the Proposed PD Conditions Exhibit. 3. The retention pond and trail as depicted the Detail Site Plan be constructed and maintained with the development of the Office/Warehouse on Lot 1. 4. The fire lane/mutual access drives and their associated perimeter landscaping be constructed on the west side of Lot 2 and the east side of Lot 3 concurrent with the construction of Lot 1, as depicted on the Concept Plan (Lots 1-3) and the Landscape Plan. 5. Additional comments may be generated upon detailed engineering review. Attachments: 1. Staff Report 2. Proposed PD Conditions Exhibit 3. 2030 Comprehensive Master Plan Change 4. Concept Plan (Lots 1-3) 5. Detail Site Plan (Lot 1) 6. Landscape Plan 7. Tree Preservation Plan 8. Elevations & Renderings - Detail Office-Warehouse Lot 1 9. Elevations - Conceptual Office Lot 2 10. Elevations - Conceptual Office/Retail Lot 3 11. Color Renderings 12. Landscape Plan – Color (Lots 1-3) 13. Lot Lines & Area Exhibit 14. Traffic Impact Analysis 15. Letter of Intent 16. Sight Line Studies