Reference:PUBLIC HEARING: Consider approval of a zoning change request from PD-311-LI
(Planned Development- 311- Light Industrial) to PD-311R-LI (Planned Development-
311 Revised- Light Industrial) to allow an overhead tank line from the accessory tank
farm structure to the existing office warehouse on approximately 8 acres on a portion
of Lot 3R1, Block 8 located at 508 Wrangler Drive.
2040: Create Business and Innovation Nodes
Introduction:
In September of this year, AstraZeneca brought forth a request to construct a tank farm structure on
this site that would allow them to expand their production to meet the increasing demand for their
Lokelma drug that is only manufactured at this facility. Since this was approved, they have started
detailed construction engineering and are now requesting a change in the method of moving the
chemicals from the tank farm to the building.
Background:
The original plan showed the lines for the chemicals to go underground from the tank farm into the
adjacent building. What they are now requesting is to allow the chemicals to travel in an above
ground pipe rack that will take the materials from the tank farm to the building. The proposed pipe
rack system would be exterior to the building and the enclosure will span between the tank farm and
the existing building. The top of the pipe rack will be installed between the parapet line and the tank
farm building roof line, to not add additional elevation to the tank farm design. The enclosure shall
have removable panels to allow for maintenance and inspection access to the enclosed components
(piping, heat trace cabling and instrumentation, leak detection instrumentation, exhaust fans, etc.).
The rack will be designed to withstand wind speeds of 120 mph, with wind exposure classification C
provided by a steel structural frame. The columns supporting the pipe rack will be protected with a
concrete pad at the base that is 3-ft high as well as safety guardrails that meet safety requirements.
The columns will also be in the landscaped areas which provides further segregation and protection
from the parking lot traffic flow. The pipe rack is proposed to be 7’9” tall and 12’5” wide and elevated
so that the bottom of the pipe rack would be approximately 23-ft from the ground, approximately
10-ft higher than the top of an 18-wheeler. A benefit of the pipe rack system versus the underground
2
lines is the accessibility to do maintenance, inspections and repairs if necessary, versus the
underground pipe vault which would need to be enclosed and sealed and would require sections of
the parking lot to be dug up if they needed to access the underground pipe vault, being more disruptive
to the overall operation of the site. The pipe rack would be located towards the back half of the site
approximately 517-ft from Wrangler Drive and painted to match the building.
Benefit to the Community:
This will add to the tax base and provide medicine worldwide.
Legal Review:
N/A
Fiscal Impact:
This will generate additional tax revenue.
Recommendation:
On November 16, 2023, The Planning and Zoning Commission recommended unanimous approval
(5-0) subject to the following conditions:
1. There may be additional comments during detailed engineering plan review.
2. PD Conditions:
a. To paint the pipe rack to match the building.