Loading...
PZ Staff Report ITEM #6 Page 1 of 3 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE No.: PD-311R-LI – AstraZeneca Tank Farm P&Z HEARING DATE: November 16, 2023 C.C. HEARING DATE: December 12, 2023 STAFF REP.: Mary Paron-Boswell, AICP Senior Planner LOCATION: 508 Wrangler Dr SIZE OF AREA: 8.015 acres CURRENT ZONING: PD-311-LI (Planned Development- 311- Light Industrial) REQUEST: PD-311-LI (Planned Development- 311- Light Industrial) to PD-311R-LI (Planned Development- 311 Revised- Light Industrial) to allow an overhead tank line from the accessory tank farm structure to the existing office warehouse on approximately 8 acres on a portion of Lot 3R1, Block 8 located at 508 Wrangler Drive, at the request of ML Realty on behalf of AstraZeneca, being represented by Allen Hager, DPR Construction. APPLICANT: Owner: Developer: ML Realty Partners DPR Construction 5950 Berkshire Lane 310 Comal St. Suite 900 Suite 300 Dallas, TX 75225 Austin, TX 78702 972-265-0138 617-386-6911 rrainwater@holtlunsford.com allenh@dpr.com Applicant: Engineering: AstraZeneca DPS 508 Wrangler Dr. 959 Concord St. #100 Coppell, TX 75019 Framingham, MA 01701 508-532-6760 Aidan.Coleman@dpsgropglobal.com HISTORY: AstraZeneca is a pharmaceutical company located on Wrangler Drive. This particular location produces one product – Lokelma, which is a prescription medicine that is used to treat adults with Hyperkalemia. Hyperkalemia is a condition where the potassium levels in a person’s blood are too high and can lead to potentially life-threatening health issues, especially for those with chronic kidney disease (CKD). CKD affects approximately 200 million people worldwide. It is the ITEM #6 Page 2 of 3 only place where this drug is produced worldwide. Currently they have six (6) manufacturing lines and are proposing to expand it to eight (8). Staff has previously approved administratively a parking expansion, minor building expansion and utility yard. This new building addition requires a PD since they are asking for a parking variance. Earlier this year, Council approved the addition of a tank farm for the site with lines going underground from the tank farm to the main building. HISTORIC COMMENT: This property has no noted historical significance. TRANSPORTATION: Wrangler is a four-lane undivided street. SURROUNDING LAND USE & ZONING: North: Office Warehouse - Light Industrial (LI) South: Office Warehouse (LI) & Coppell 9th Grade Center (PD-289R-C) East: Light Industrial (LI) West: Vacant - Light Industrial (LI) -9) COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, shows this property as appropriate for Industrial Special District. DISCUSSION: In September of this year, AstraZeneca brought forth a request to construct a tank farm structure on this site that would allow them to expand their production to meet the increasing demand for their Lokelma drug that is only manufactured at this facility. Since this was approved, they have started detailed construction engineering and are now requesting a change in the method of moving the chemicals from the tank farm to the building. The original plan showed the lines for the chemicals to go underground from the tank farm into the adjacent building. What they are now requesting is to allow the chemicals to travel in an above ground pipe rack that will take the materials from the tank farm to the building. Pipe Rack The proposed pipe rack system would be exterior to the building and the enclosure will span between the tank farm and the existing building. The top of the pipe rack will be installed between the parapet line and the tank farm building roof line, to not add additional elevation to the tank farm design. The enclosure shall have removable panels to allow for maintenance and inspection access to the enclosed components (piping, heat trace cabling and instrumentation, leak detection instrumentation, exhaust fans, etc.). The rack will be designed to withstand wind speeds of 120 mph, with wind exposure classification C provided by a steel structural frame. The columns supporting the pipe rack will be protected with a concrete pad at the base that is 3-ft high as well as safety guardrails that meet safety requirements. The columns will also be in the landscaped areas which provides further segregation and protection from the parking lot traffic flow. The pipe rack is proposed to be 7’9” tall and 12’5” wide and elevated so that the bottom of the pipe rack would be approximately 23-ft from the ground, approximately 10-ft ITEM #6 Page 3 of 3 higher than the top of an 18-wheeler. A benefit of the pipe rack system versus the underground lines is the accessibility to do maintenance, inspections and repairs if necessary, versus the underground pipe vault which would need to be enclosed and sealed and would require sections of the parking lot to be dug up if they needed to access the underground pipe vault, being more disruptive to the overall operation of the site. Site Plan This site plan still shows two phases, the first is the construction of a new building for the proposed tank farm and the second is the proposed small 3,000-sf expansion at the rear of the existing building if deemed necessary. The PD condition for parking remains, with one slight deviation, the overhead pipe rack system will be installed in a landscape island with bollards in place to allow separation from the parking area, taking up two spaces. If phase 2 is constructed, they would still have 200 spaces in total, as previously approved. The pipe rack would be located towards the back half of the site approximately 517-ft from Wrangler Drive and painted to match the building. Staff is in support of the request and recommends approval. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of the request subject to the following conditions: 1. There may be additional comments during detailed engineering plan review. 2. PD Conditions: a. To paint the pipe rack to match the building. ALTERNATIVES: 1. Approval of the request 2. Denial of the request 3. Modification of the request 4. Take the case under advisement to a future date ATTACHMENTS: 1. Detail Site Plan 2. Pipe Rack Design & Renderings 3. Landscape Plan 4. Narrative 5. Parking Memo