Loading...
CC Memo.Oct 24 Revised1 MEMORANDUM To: Mayor and City Council From: Mindi Hurley, Director of Community Development Date: October 24, 2023 Reference: CONTINUED PUBLIC HEARING: Consider approval of a zoning change request from PD-259R2-SF-7/9 (Planned Development-259 Revision 2 -Single Family-7 & 9) to PD-259R3-SF-7/9 (Planned Development-259 Revision 3 -Single Family-7 & 9), to provide a new concept and detail plan that would allow for a gated community and private streets, over two phases (54 residential lots in Phase 1 and nine (9) residential lots in Phase 2 and associated common area lots). with a change in the amenities provided (a pool and pickle ball courts in lieu of gardens for Lot 2X, Block C). 2040: Enhance the Unique 'Community Oasis' Experience Introduction: This agenda item is a continuation of the October 10, 2023, Public Hearing to consider zoning changes that would convert the subdivision to a private, gated community. At the last City Council meeting the applicant brought forward three “additional conditions” that staff was not informed of prior to the meeting. The item was continued to allow staff an opportunity to review the request and discuss it with the applicant. Staff met with the applicant and the following additional condition is being brought to Council for consideration: 1. Building Permits and entry gates. • This item will be incorporated into the existing PD condition listed as T(2) and will be amended to read: 2. The development of Lot 2X and the entry gates and entry features shall be constructed prior to the issuance of any certificate of occupancy for the first home, other than a model home. The remaining two items raised by the applicant do not need to be PD conditions and can be administratively reviewed/approved. These items are: 1. The use of a material storage lot during the buildout of the subdivision: The applicant has agreed not to place it adjacent to the existing residential neighbors. 2 2. Street sign selection: Public Works staff will review to ensure that the design meets Texas Manual on Uniform Traffic Control Devices (TMUTCD) requirements. Background: This property has gone through several zoning requests since it was purchased in 1999. The last change in July of 2022, saw the number of residential lots for Phase 2 reduced from 20 to nine (9), for a total of 63 residential lots. The residential component and layout of the project is not changing, and the project is currently under construction. The developer has submitted a request to convert the streets from public streets into private streets that the HOA would maintain. Part of this original request was to change the amenities provided on Lot 2X from a farmhouse with garden areas to a lot with an amenity center, pool, pickleball courts, bocce court, grilling station, and cabana. This amenity portion of the request was withdrawn at the Planning and Zoning Commission and the applicant would need to make a new request if they wanted to do something different on this lot. The main request is to convert the subdivision into a private gated community. This would entail having gates at all of the entrances off of Sandy Lake Road (the main entry/exit and the secondary emergency exit by Lot 2X). The subdivision would be accessible to the residents, their guests as well as emergency services. This would not be a manned entrance, but a keypad entrance. There is also a turnaround proposed for those instances where someone either can’t get in or turned onto the street by mistake. The existing PD conditions for the original development will remain, and a few new conditions are being requested. The main change proposed by this request is to convert the existing approved development into a gated community with private streets that the HOA would be required to maintain. This would also include the maintenance of the bridge connecting Phase 1 to Phase 2. Currently, the project is under construction with the utilities for Phase 1 and 2 complete. The streets for the subdivision have already been constructed to meet city standards. If the private gated community is approved, the streets will need to be platted as a common area lot and will have an access and utility easement on them for the city to maintain its utilities. The roadway paving for Phase 1 is also complete. They are working on installing the sidewalks and finishing up the Phase 2 roadway paving. The bridge is up and paving of the roadway on the bridge is part of the Phase 2 roadway paving. Some of the remaining items include installing street signs, streetlights, and gabions as well as submitting the LOMR to FEMA and performing site cleanup. Benefit to the Community: This will add a unique neighborhood to the community. Legal Review: N/A Fiscal Impact: This will eliminate the City’s maintenance costs and responsibility for the streets. Recommendation: On September 21, 2023, The Planning and Zoning Commission recommended unanimous approval (6-0) for a gated community, but not the changes to Lot 2X, subject to the following PD conditions (condition #6 was added subsequent to the PZ meeting): 3 1. All of the previously approved PD conditions remain in place. 2. To allow for a gated community with private streets that must be maintained by the HOA, this would include maintenance of the bridge and street signs. 3. The CCR’s must be updated to address the changes in the maintenance of the streets, bridge, wall maintenance and entry feature maintenance. 4. The existing plats must be vacated, and new plats must be filed that show the streets as private and part of a Common Area, to be maintained by the HOA. 5. To approve the entry feature and sign as presented. 6. Amend existing condition T (2) to read: 2. The development of Lot 2X and the entry gates and entry features shall be constructed prior to the issuance of any certificate of occupancy for the first home, other than a model home. Attachments: 1. PZ Staff Report 2. Blackberry Farm Exhibit Package a. Revised Site Plan b. Community Entry Site Plan c. Entry Sign and Gate Details & Building Perspectives d. Community Entry Planting Plan e. Side Entry Gates & Stone Wall Elevations