PZ Staff ReportITEM #10
Page 1 of 4
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE No.: PD-309-SF-12 & C, Forest Creek Development, Lots 1 & 2, Blk A
P&Z HEARING DATE: August 17, 2023
C.C. HEARING DATE: September 12, 2023
STAFF REP.: Mary Paron-Boswell, AICP Senior Planner
LOCATION: West side of S. Denton Tap between W. Bethel School Rd. and W. Bethel Rd.
SIZE OF AREA: 2.05 acres of property
CURRENT ZONING: C (Commercial)
REQUEST: C (Commercial) to PD-309-SF-12 & C (Planned Development-309-Single Family-
12 & Commercial), to allow the development of a residence and professional office
building on two lots totaling 2.05 acres of property located on the west side of S.
Denton Tap Road approximately 450 feet north of W Bethel Road, at the request
of Jose Fernando Teruya, FTA Design Studio, Inc.
APPLICANT: Owner:
Eliana & Jose Fernando Teruya
1056 Village Parkway
Coppell, TX 75019
(469) 939-2586
fteruya@fernando-teruya.com
HISTORY: This property is undeveloped and is limited in developable area because of its shape
and the floodplain.
HISTORIC COMMENT: This property has no noted historical significance.
TRANSPORTATION: Denton Tap is a six-lane divided road in a 110’ ROW
SURROUNDING LAND USE & ZONING:
North: Commercial (C)
South: Alexander Court - Residential (PD-220R-SF-12))
East: Commercial (C) across the street
West: Grand Cove Estates - Residential (SF-12)
ITEM #10
Page 2 of 4
COMPREHENSIVE PLAN:
Coppell 2030, A Comprehensive Master Plan, shows this land as appropriate for
Residential Neighborhood use.
DISCUSSION: Site Plan
This piece of property is two acres in size, however, it is oddly shaped and has a
limited amount of land for development, since a good portion of it backs up to the
100-yr floodplain and drop about 20-ft from Denton Tap to the creek at the rear of
the site. Staff has been working with the owner to come up with a plan to allow for
his proposal. Currently the property is zoned Commercial (C). With this proposal
the southern portion of the lot would be rezoned to allow for a residence. The base
zoning would be SF-12 which matches the surrounding residences and also
conforms to the Future Land Use Map. The northern portion of the property would
remain Commercial (C) and an office building is planned to be constructed there.
The owner of the property plans to live in the residence and build an office for his
architecture business next door. The residence would be constructed first. One of
the challenges of this site was the driveway locations. Staff has been working with
the applicant to adjust the driveway for the commercial lot to better align with the
median opening already in place. This will entail adding a left turn lane and making
some median modifications that they will be responsible for. Further analysis will
be done at the time of engineering review.
Lot 1: This site plan shows two lots, the southernmost lot is property would be for
a single residence. This lot is somewhat triangular with a long frontage on S.
Denton Tap and it narrows towards the rear. The base zoning for this lot is proposed
to be SF-12. They are asking for several variances which include a variance to the
front yard setback from 30-ft to 25-ft. and for a lot depth of 57 ft on the north side.
As mentioned earlier, the lot’s irregular configuration and the 100-yr floodplain
limits the development of the lot. Staff is in favor of the reduced front yard setback
and lot depth. The residence as shown will be 5,118-sf and provides a tremendous
side yard and rear yard setback. The two-story building will be on pier and beam
and will have a two-car garage, a circular driveway off Denton Tap and guest
parking, there will be no alley access. They are proposing permeable driveway
paving for a portion of the site and concrete pavement for the circular drive portion.
Staff has no objection to this since they are providing concrete for the circular drive
section in case emergency vehicles need to access the site. There is proposed to be
an eight-foot wall along the front of the property where the garage and entry court
are, with a sliding gate for access to the to this area from the driveway.
Lot 2: The northern lot is proposed to remain commercial. The applicant is
proposing to construct his office here. The property to the north of this is also
commercial. This lot is proposed to have a rectangular 2,990-sf office, with mainly
parking (12 spaces) on the lower level and the offices elevated above. The site will
be accessed from two driveways on Denton Tap which will be concrete and contain
a fire lane. There is a screening wall requirement between residential and
commercial zoning. In this instance the applicant is proposing to utilize a living
screen in between his office and his residence. The residence is also proposed to
ITEM #10
Page 3 of 4
have a gated area by the garage. Staff is in favor of this request. The applicant is
also proposing to use the existing trees as a living screen for the other residential
lots to the west of this property. Staff is also in favor of this request since we do
not want a wall in the middle of the creek in the 100 yr floodplain and since there
is approximately 100 ft from building to building with dense trees in between.
Building Elevations
Both buildings will have a modern look to them with the materials for the residence
being cream colored limestone, Austin “Butterstick” block and charcoal colored
terracotta rainscreen. The roof will be a standing seam metal roof. The office
building will coordinate with the same cream colored limestone, Austin
“Butterstick” block and charcoal colored terracotta rainscreen and a standing seam
metal roof. The office will also have windows running the length of the building
along Denton Tap and a terrace with a pressure treated wood lattice. There doesn’t
appear to be any windows on the rear of the office building. The office building
will also be required to be fire sprinklered. No signage has been proposed for the
building.
Landscaping
Landscaping plans are only required for the commercial lot, but they will be
providing landscaping for both lots. They are proposing to remove trees to be able
to construct both buildings, associated parking, etc. They are proposing to save the
trees that they can. According to their tree mitigation plans are preserving
approximately 72% on Lot 2. Staff will need to verify the tree mitigation fees.
They are showing approximately $18,680 in mitigation fees.
Landscaping is proposed along Denton Tap with a combination of trees, and
groundcover grouped at either end and smaller shrubs in between the driveway
entrances. The applicant is proposing to save as many trees as possible on site and
they are situated around the site including in the parking area and at the residence.
A large percentage of the site will be landscaped or in a natural state, more than the
30% required for lots under 2 acres.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of the request subject to the following conditions:
1. There may be additional comments during detailed engineering plan review.
2. Tree mitigation fees shall be paid at time of tree removal permit.
3. The plat cannot be filed prior to zoning being approved.
4. Park fees are required for the residential lot.
5. PD Conditions:
a. To allow for no alley for the residential portion.
b. To allow a front yard of 25-ft in lieu of 30-ft for Lot 1, Block A.
c. To waive the screening wall requirement between Lot 1 and Lot 2.
d. To allow the existing trees to act as a living screen between Lot 2 and the adjacent residential lots.
e. To allow a screening wall in the front yard as shown on the site plan.
f. To allow for a minimum lot depth of 57.93-ft on the north side of Lot 1.
g. To allow for a privacy and noise barrier wall within the sewer easement via a license agreement.
ITEM #10
Page 4 of 4
h. To allow for residential driveway access on S. Denton Tap Rd.
i. The applicant is responsible for any median modification costs for installing the left turn lane.
j. The office building will be required to be sprinklered.
ALTERNATIVES:
1. Approval of the request
2. Denial of the request
3. Modification of the request
4. Take the case under advisement to a future date
ATTACHMENTS:
1. Detail Site Plan
2. Elevation Renderings & Materials Exhibit
3. Landscape Plan