NarrativeInternal Memo
DOCUMENT NO.: D22BP111-IM-001 REVISION: C DATE: 08 Aug 2023
2023
SF1047_G
Page 1 of 3
TO: Ms. Mary Paron-Boswell, Sr. Planner, City of
Coppell, TX.
C.C.: Mr. Allen Hager, DPR, Mr. Jerome Doyle,
AstraZeneca
SUBJECT: Project Summary
PREPARED BY: Aidan Coleman, Project Manager, DPS
1. SITE OVERVIEW
The AstraZeneca (AZ) site located at 508 Wrangler Drive, Coppell, TX (Lot 3R-1, Block 8 Park West
Commerce Center / Building 3 / West Facility ) is a single product manufacturing site and the only
AZ site that produces Lokelma. Lokelma is a prescription medicine that is used to treat adults with
Hyperkalemia. Hyperkalemia occurs when the potassium levels in a patient's blood are too high.
It is a condition that can lead to serious and potentially life-threatening health issues. Patients with
Chronic Kidney Disease (CKD) are at a higher risk for Hyperkalemia. CKD affects an estimated 200
million people worldwide. AstraZeneca's vision is to ensure every patient across the globe has
access to the life-saving Lokelma.
The AstraZeneca Coppell Site is approximately 118,185 square feet. The Coppell Site currently
includes 6 manufacturing lines (Process Trains 1 - 6), Warehousing, Starting Material Storage
(Tank Farm), Utility Space, Quality Control Lab and Administrative Areas. The Coppell Site operates
24 / 7 and the existing manufacturing capacity is one-hundred percent utilized to meet the current
patient demand for Lokelma. The Lokelma demand is forecasted to more than double by 2026.
Therefore, AstraZeneca needs to increase the Coppell Site's manufacturing capacity to be able to
meet that demand. AstraZeneca's strategic plan includes the addition of 2 manufacturing lines
(Process Trains 7 and 8), the associated utilities and a separate starting material storage building
(Tank Farm) to the Coppell Manufacturing Site. The additional manufacturing lines will provide the
capacity needed to meet the forecasted global demand for Lokelma.
2. SITE HISTORY
2015 - AstraZeneca acquired Lokelma from ZS Pharma and Coppell Site lease transferred to
AstraZeneca
2018 – Received FDA and European Medicines Agency (EMA) regulatory approval for Lokelma
2019 – Launched commercial distribution of Lokelma
2023 – Lokelma approved in 55 Markets Worldwide
2023 – Tank Farm Design Initiated
Internal Memo
DOCUMENT NO.: D22BP111-IM-001 REVISION: C DATE: 08 Aug 2023
2023
SF1047_G
Page 2 of 3
2025- Tank Farm in Operation
2026- Q1 Train 7 Commercial Production
2026- Q3 Train 8 Commercial Production (TBD)
3. TANK FARM ADDITION
The Aqueous Chemical Tank Farm addition to the site will be used to support the existing and new
manufacturing lines (Process Trains 7 and 8).
The overall facility footprint of the new Tank Farm is approximately 9,500 sf, including both floors.
The building equates to 19,000 sf, including the Truck Unloading Area, the Tank Farm, and the
supporting utilities on the first and second floors.
The project is expected to have a land disturbance area of approximately 2.5 acres, which will
require ground clearing, excavation, and levelling to allow a first-floor elevation to match the
existing cGMP Building. Pacheco Koch, a Westwood company proposed approach to
excavation/grading, site equipment location and will be the site civil engineering firm of record.
Site work also includes utility infrastructure for water mains, sanitary sewer, storm water and
electrical routing.
The Tank Farm portion of the building, which will house the tanks and aqueous chemicals, requires
the addition of nine tanks, eight of which are 17,000 Gallons intended to be fabricated from
stainless steel, and one 10,000-gallon tank which will be Fiberglass Reinforced Polyester (FRP) to
store the raw materials listed below:
• Sodium Hydroxide (NaOH)
• Zirconium Acetate (ZrAc)
• Colloidal Silica
• Hydrochloric Acid (HCl)
It is important to note that the existing Tank Farm already in operation within the site holds the
same chemicals. Thus, no new chemicals are being introduced to the site with the addition of the
new and separate Tank Farm building. The additional starting material storage capacity of the new
Tank Farm is required to support the increased manufacturing capacity with the addition of Process
Trains 7 and 8.
4. City’s review comments (received on July 28,2023) and DPS
Responses
- is there any release of fumes, etc. into the atmosphere?
DPS Response: No, All Hydrochloric Acid vents will be scrubbed prior to venting to atmosphere.
Scrubber design will be managed in Detailed Design phase. All other vents are non-hazardous
vent services.
- Still needing information relating to chemicals and proximity to other
buildings and property lines. As this may affect setback or
construction material/rating of this building.
DPS Response: The Tank Farm Building is considered an H-4 Occupancy Group. Section 307.6
Internal Memo
DOCUMENT NO.: D22BP111-IM-001 REVISION: C DATE: 08 Aug 2023
2023
SF1047_G
Page 3 of 3
High-hazard Group H-4 defines the tank farm building as containing materials that are health
hazards that includes but not limited to Corrosives. The raw materials stored within the tank
farm building are considered corrosives.
1: Tank Farm Building to Existing AZ Manufacturing Facility: Based on the attached civil site
plan, the existing AstraZeneca manufacturing facility is 97.5 Feet off of the tank farm building. As
listed in the 2015 IBC – Table 602 FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR
WALLS BASED ON FIRE SEPARATION DISTANCE there is a greater than 30 f oot distance between
buildings so we would need a 0 Hr fire rating on the exterior wall of the tank farm building.
2: There is a 10 foot side yard setback on the existing property line. The Tank Farm building is
located 14.6 feet off the side yard property line as shown on the attached civil site plan. As
mentioned above, sine we are greater than 30 feet to any building based on the side yard
property line, the exterior wall of the tank farm would be at 0 hours. As a precaution, and should
the adjacent side yard property be developed, we are providing a 4-hour rated interior wall along
the entire length of the tank farm building along the side yard property line. This will protect AZ
from ever having to go back and install a fire rated wall in the future should the adjacent property
ever be developed.
Table 602
FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION
DISTANCE
FIRE
SEPARATION
DISTANCE =
X (feet)
TYPE
OF CONSTR
UCTION
OCCUPANCY
GROUP H (e)
OCCUPANCY
GROUP F-1,
M, S-1 (f)
OCCUPANCY
GROUP
A,B,E,F-
2,I,R,S-
2,U(h)
X ≥ 30 All 0 0 0
(e) For special requirements for Group H occupancies, see Section 415.6
Section 415.6 – Fire Separation Distance: Building must comply with requirements outlined within
this section, which we do.