PZ Staff ReportITEM #9
Page 1 of 4
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE No.: PD-311-LI – AstraZeneca Tank Farm
P&Z HEARING DATE: August 17, 2023
C.C. HEARING DATE: September 12, 2023
STAFF REP.: Mary Paron-Boswell, AICP Senior Planner
LOCATION: 508 Wrangler Dr
SIZE OF AREA: 8.015 acres
CURRENT ZONING: LI (Light Industrial)
REQUEST: LI (Light Industrial) to PD-311-LI (Planned Development- 311- Light Industrial)
to allow the construction of a 19,893 square foot accessory tank farm structure and
approximate 3,000 square foot building addition to the existing office/warehouse
building on approximately 8 acres, being a portion of Lot 3R1, Block 8 located at
508 Wrangler Drive, at the request of ML Realty on behalf of AstraZeneca, being
represented by Allen Hager, DPR Construction.
APPLICANT: Owner: Developer:
ML Realty Partners DPR Construction
5950 Berkshire Lane 310 Comal St.
Suite 900 Suite 300
Dallas, TX 75225 Austin, TX 78702
972-265-0138 617-386-6911
rrainwater@holtlunsford.com allenh@dpr.com
Applicant: Engineering:
AstraZeneca DPS
508 Wrangler Dr. 959 Concord St. #100
Coppell, TX 75019 Framingham, MA 01701
508-532-6760
Aidan.Coleman@dpsgropglobal.com
HISTORY: AstraZeneca is a pharmaceutical company located on Wrangler Drive. This
particular location produces one product – Lokelma, which is a prescription
medicine that is used to treat adults with Hyperkalemia. Hyperkalemia is a
condition where the potassium levels in a person’s blood are too high and can lead
to potentially life-threatening health issues, especially for those with chronic kidney
disease (CKD). CKD affects approximately 200 million people worldwide. It is the
ITEM #9
Page 2 of 4
only place where this drug is produced worldwide. Currently they have six (6)
manufacturing lines and are proposing to expand it to eight (8). Staff has previously
approved administratively a parking expansion, minor building expansion and
utility yard. This new building addition requires a PD since they are asking for a
parking variance.
HISTORIC COMMENT: This property has no noted historical significance.
TRANSPORTATION: Wrangler is a four-lane undivided street.
SURROUNDING LAND USE & ZONING:
North: Office Warehouse - Light Industrial (LI)
South: Office Warehouse (LI) & Coppell 9th Grade Center (PD-289R-C)
East: Light Industrial (LI)
West: Vacant - Light Industrial (LI) -9)
COMPREHENSIVE PLAN:
Coppell 2030, A Comprehensive Master Plan, shows this property as appropriate
for Industrial Special District.
DISCUSSION: AstraZeneca has forecasted that the demand for the drug they produce here will
more than double in the next three years. To meet this demand, they are seeking to
expand the manufacturing capacity at this site. This expansion includes the
construction of a building that will hold the chemicals required to make the
Lokelma medicine. This facility operates 24 hours a day/everyday.
Site Plan
This site plan shows two phases, the first is the construction of a new building for
the proposed tank farm and the second is the proposed small 3,000-sf expansion at
the rear of the existing building. This second phase will happen if they need it and
was included because it would take out eight (8) additional parking spaces. Some
additional equipment will be added to the utility yard already existing on the eastern
portion of the site.
The Site Plan shows the tank farm proposed on the rear western side of the site.
This portion of the site has been used up until now as a laydown yard for other work
that has happened on-site. This will now be converted to the building for the tanks,
referred to as the tank farm. Trucks will enter the site from Wrangler Drive and
drive down the eastern side of the building to the rear of the site and then make
their way to the tank farm building on the western portion of the site. The building
will have two bays to receive the trucks. The applicant has provided a turning
template that shows the trucks ability to move into and out of the truck docks. The
building itself will have a subterranean level or pit, and then two levels above that
which will contain the chemical tanks, offices, pump room, break room and waste
room. The new building will have a backup generator on the east side which will
be screened. Nothing at the front half portion of the site will be changing other than
ITEM #9
Page 3 of 4
the existing building will have a backup generator on the east side which will also
be screened.
A PD condition is being requested for parking. There are 237 parking spaces
currently which is above what is required. With the new construction , some
adjustments will be made that will require 45 existing parking spaces to be
removed, and they will be adding back 16 spaces, leaving them with 208 spaces.
As mentioned earlier, if phase 2 is constructed, eight additional spaces would be
removed, leaving 200 spaces in total. We asked the Astrazeneca representatives
about their operational needs and as mentioned in their letter, this is a 24 hour a day
operation and their current average maximum occupancy is 140 employees per day.
They have indicated that the 200 spaces will meet their current and future business
needs based on their operating staffing plan. Staff is in support of the requested
parking variance.
Elevations
The new tank farm building will be made of pre-cast concrete panels to match the
existing building façade both in pattern, paint colors and texture. They will be using
a combination of Sherwin Williams Balanced Beige and Tavern Taupe. Renderings
of the building have been provided as well as photographs of the existing building.
The western length of the interior wall of the tank farm building will be 4 -hour
rated, so as not to interfere with future possible construction on the adjacent lot.
Landscaping
As mentioned earlier, the front half of the site will not be impacted with the new
construction. They will be removing some trees from the site to make way for the
new building and parking spaces, and saving those that they can. In addition, they
will be planting 32 new trees on site in the parking area, around the new building
and along the western perimeter. They will be required to pay approximately
$32,500 in tree mitigation fees. They have provided a landscape plan for the limit
of work area and will be providing a revised plan for the entire limits of their site.
Staff is in support of the request and recommends approval.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of the request subject to the following conditions:
1. There may be additional comments during detailed engineering plan review.
2. Revise the Landscape Plan prior to City Council
3. PD Conditions:
a. To allow for a parking variance and allow 200 parking spaces as shown on the Site Plan.
ALTERNATIVES:
1. Approval of the request
2. Denial of the request
3. Modification of the request
4. Take the case under advisement to a future date
ITEM #9
Page 4 of 4
ATTACHMENTS:
1. Detail Site Plan
2. Elevation Renderings
3. Floor Plan
4. Landscape Plan
5. Narrative
6. Parking Memo