Loading...
Staff Report ITEM #7 Page 1 of 3 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Gateway Business Park, Site Plan (Gateway Business Park (Replat), Lot 3A-R2, Block 2) P&Z HEARING DATE: November 19, 2020 STAFF REP.: Mary Paron-Boswell, Sr. Planner LOCATION: Northern terminus of Exchange Circle, south of the DART R.O.W. SIZE OF AREA: 16.41 acres of property CURRENT ZONING: LI (Light Industrial) REQUEST: A site plan to allow two office warehouse buildings on-site (176,606-sf and 139,318-sf), with a common truck courtyard area. APPLICANT: Owner: Engineer: Daniel Gallagher BSREP III Exchange Circle, LLC. Kimley-Horn & Associates, Inc. 1180 Peachtree St. NE 13455 Noel Road, Suite 3380 Two Galleria Office Tower, Suite 700 Atlanta, Ga 30309 Dallas, TX 75240 212-407-7000 972-776-1780 John.morgan@brookfieldproperties.com dan.gallagher@kimley-horn.com HISTORY: City Council approved the Final Plat for Gateway Business Park in 1990. In 1993, Council approved a Replat of Block 2. In 1996, a second Replat with a Site Plan for the adjacent property was approved allowing a 214,000-square foot regional distribution warehouse and a 50,000-square foot retail furniture showroom with a 236,000-square foot future expansion area. In 2017, a replat was approved to allow for the expansion of Haverty’s warehouse on Lot 1R2 to the west. This site is currently vacant. HISTORIC COMMENT: There is no historical significance attached to this property. TRANSPORTATION: Gateway Blvd is a C4U, four-lane undivided collector street. SURROUNDING LAND USE & ZONING: North –office/warehouse; PD-229R-LI South –office/warehouse; LI ITEM #7 Page 2 of 3 East – vacant land and office/warehouse; LI West – office/warehouse; LI COMPREHENSIVE PLAN: Coppell 2030, A Comprehensive Master Plan, designates this area as Industrial Special District DISCUSSION: Site Plan The site is located at the northern terminus of Exchange Circle. The Site Plan illustrates the proposal for two office warehouse buildings. The most southern building is proposed to be 139,318 square feet and the most northern building 176,606 square feet. The two buildings share a common truck court, with the buildings themselves screening the truck court area. There are 355 parking spaces required and 381 parking spaces provided, allowing for flexibility in the use of the building. Each of the drive aisles are designated as fire lanes. A fire lane also extends through the center of the truck court. Landscape Plan/Tree Survey The majority of the site is treeless except for some trees located at the northern portion of the site. Trees that can be saved will remain. The others that fall within the parking spaces, building footprint and drive aisles will be removed. With this development, there are 162 overstory trees to be planted on-site with over half of them being 4” caliper trees, exceeding the minimum requirements. The site meets the landscaping requirements and provides a large 45-ft wide landscape buffer area along the eastern perimeter and a large varying landscape buffer along the northern perimeter and western perimeters as well. The parking areas have the required trees in the parking islands. Building Elevations The buildings are proposed to be up to 44-ft in height and constructed of concrete tilt wall panels with a textured finish and metal panel accents around the entrances. Architectural accents such as reveals, windows, and wall articulations break up the long wall expanses. As mentioned, the truck court area for each building will face one another with the buildings acting as screening from adjacent properties and streets. Dock doors will be located along the truck court area. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of Gateway Business Park, Lot 3A-R2, Block 2, Site Plan subject to the following conditions: 1. A tree removal permit shall be required. 2. All signs shall comply with City Ordinances. 3. Revise the sheets to reflect the updated name of “Gateway Business Park” ALTERNATIVES: 1. Approval of the request 2. Denial of the request 3. Modification of the request ITEM #7 Page 3 of 3 4. Hold this request under advisement ATTACHMENTS: 1. Site Plan 2. Landscape Plan & Tree Survey 3. Building Elevations, Rendering and Material Board