Staff ReportITEM # 8
Page 1 of 3
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE NO.: PD-260R3-R, Trinity River Kayak Company
P&Z HEARING DATE: December 17, 2020
C.C. HEARING DATE: January 12, 2021
STAFF REP.: Mary Paron-Boswell, Sr. Planner
LOCATION: 1601 E. Sandy Lake Road
SIZE OF AREA: 1.5 acres of property
CURRENT ZONING: PD-260R2-R (Planned Development-260-Revision 2-Retail)
REQUEST: A zoning change request to PD-260R3-R (Planned Development-260 Revision 3-
Retail), to amend the site plan to allow for the demolition of an existing storage
building and construction of a new structure containing a garage, enclosed storage
area and covered pavilion area.
APPLICANT: Owner:
Jeff Varnell
1601 E. Sandy Lake Rd.
Coppell, Texas 75019
214-714-5051
jeff@trinityriverkayak.com
HISTORY: This property has been zoned for retail uses for over 25 years and was formerly
occupied by a bait shop and a residence. In 2013, the property owner was granted
a rezoning to allow a convenience store and canoe, kayak, paddleboard storage,
rentals and sales (no residence). Given the challenges imposed by reusing existing
buildings and incorporating new construction, this property was rezoned to a
Planned Development District to allow for variances to regulations of the Zoning
and Subdivision Ordinances to accommodate this use, including:
· Variance to the building setback requirements.
· Variance to the masonry requirements for the existing and proposed
buildings.
· Allowance for outside storage.
· Variance to the paving requirement – the fire lane was required to be
concrete, the parking areas were permitted to be asphalt/crushed lime stone.
· Monument sign was permitted to be located 7.5 feet vs. 15 feet from the
R.O.W.
ITEM # 8
Page 2 of 3
· Perimeter landscaping requirement was waived along the east and north
property lines.
· No parking lot landscaping was required.
· Alternative fencing was permitted along the west property line abutting the
residential subdivision.
· The property owner was permitted to retain the Septic System, subject to it
being inspected, certified and brought up to code.
On January 8, 2013 City Council approved this rezoning. A ¾ vote of Council was
required due to over 20% opposition from the abutting homeowners.
After the establishment of this ordinance, the Director of Planning approved a
revised sign plan which allowed for a sign on the fence/wall instead of the approved
monument sign and approved the design and location of the attached sign.
In 2016, a request to amend the allowed uses and signage was approved.
In 2019, a request to amend the site plan to allow for a canopy and storage building,
an enclosed metal storage container and to use the existing building as a live/work
residence was approved by allowing variances to the Zoning Ordinance.
HISTORIC COMMENT: There is no historic significance associated with the subject property.
TRANSPORTATION: Sandy Lake Road is a C4D, four-lane divided collector concrete roadway contained
within a 110-foot right-of-way.
SURROUNDING LAND USE & ZONING:
North - R L Turner FFA Project Center (CFBISD); A (Agriculture)
South - Single Family; Trinity Shores PD-190-SF-9
East - Trinity River; Cities of Dallas and Carrollton
West - Single Family; Trinity Shores PD-190-SF-9
COMPREHENSIVE PLAN: The Coppell 2030 Comprehensive Master Plan, adopted March 22, 2011,
shows the property as suitable for Residential Neighborhood.
DISCUSSION: Last year this site was approved to have a live/work use. The site is home to Trinity River
Kayak. The owner is proposing to do some improvements on site which include the
demolition of an old garage and replacing it with a newer structure. This new structure
will include a garage, additional enclosed storage space and a covered pavilion area.
The existing site has a garage which the applicant is proposing to demolish. It is located
at the end of the paved fire lane/driveway turnaround and in front of the parking lot for the
kayak business. A demolition permit will be required to remove the building. The
proposed new garage will be in the same general area and be accessed from the same paved
fire lane/ driveway. The new building will be approximately 2,500 sf and 100 feet wide.
A quarter of the building will be the new garage (625 sf), another quarter will contain an
enclosed storage space for the business, while the other half of the building (1,250 sf) will
ITEM # 8
Page 3 of 3
contain the covered open pavilion area. The pavilion area is where kayakers can wait in
the shade for their turn to hit the water, especially during the hot summer days. There is
one variance being requested and it relates to the location of the new building. The setback
on the eastern side of the pavilion is requested to be 15-ft in lieu of the required 30-ft. Staff
is not opposed to this request since the eastern portion of the site abuts the Elm Fork Trinity
River. In addition, this will line up with the existing main structure on site and allow the
applicant to use the existing paved access area without having to add additional concrete
on site or lose any parking spaces.
In terms of landscaping there are no new plants or trees proposed. The site was updated
with landscaping in 2019 with the previous request. The building was placed so as not to
disturb the recently planted trees adjacent to the parking area.
The new building itself will be constructed of metal with PBR metal panels. The building
will be powder coated with a Hunter Green color to match the existing main building on
site. The roof will also be PBR metal panels with a Dark Brown color. The pavilion area
will be open and under roof. The poles in the pavilion area will be wrapped in cedar and
stained to match the other buildings on site.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of the PD subject to the following conditions:
1. There may be additional comments may be additional comments at the time of Building Permit
and Detail Engineering Review.
2. A Demolition Permit is required to remove the existing structure.
3. Allow a 15-ft exception to the 30-ft side yard setback for the eastern portion of the new
building.
ALTERNATIVES:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
4. Take under advisement for reconsideration at a later date
ATTACHMENTS:
1. Site Plan
2. Building Elevation
3. Landscape Plan (Existing)