Loading...
City Council Memo1 MEMORANDUM To: Mayor and City Council From: Mindi Hurley, Director of Community Development Date: August 11, 2020 Reference: Consider approval of PD-295R-HC (Sheraton Four Points Hotel), a zoning change request from PD-295-HC to PD-295R-HC, to approve a Detail Site Plan to allow for an approximate 73,190 square foot four-story hotel on 2.675-acres of property located on the northeast corner of SH 121 and Northwestern Drive, as requested by Mike Clark on behalf of Archway 121 Coppell, Ltd. 2030: Business Prosperity Executive Summary: In 2019, City Council approved a Concept Plan for a gas station, hotel, retail, restaurants and office uses on 8.6 acres, and a Detail Site Plan for a QT convenience store with gas pumps fronting on Freeport Parkway. The QT gas station has since been constructed. The Concept Plan for PD-295-HC originally had the hotel on a different portion of the site, along Northwestern Drive. The property itself will need to be replatted to align with the proposal and prior to any permits granted for construction. Introduction: This is the second phase of development for the overall 8.6 acres. The Detail Site Plan is for a four-story Sheraton Four Points Hotel, approximately 73,200-sf in size. The 130-room hotel will have a full-service restaurant that will be open to the public and each hotel room meet or exceed the minimum room size of 285 sf; a large lobby and atrium area (3,200-sf); a 1,360-sf conference area; and porte-cochere in front of the entrance along SH 121. In addition to these features, hotels are required to provide three additional amenities. This hotel is proposing four additional amenities: a pool (600-sf), a workout facility (1,000- sf), a gift store/pantry (320-sf) and an outdoor plaza area (1,000). Analysis: On July 16, 2020, the Planning and Zoning Commission recommended APPROVAL of PD-295R-HC, subject to the following conditions: 1. There may be additional comments at the time of Building Permit and Detail Engineering Review. 2. The property shall be platted to provide required mutual access, fire lanes and easements prior to development. 3. Private Drive ā€œCā€ containing the off-site mutual access easement and fire lane shall be constructed with this project or construction on adjacent lot, whichever comes first. 4. To allow for one loading zone. 2 5. To allow for a 10-ft setback in lieu of 20-ft on the northeast common boundary line adjacent to the building. 6. To allow for more than 50% parking in the front yard. 7. That the focal point for any art/feature is proposed to be situated on the pedestrian access between the retail and office tract to the northeast. 8. Signs will need to comply with City Ordinances. 9. That the TIA for this overall development be updated with the third phase of development or that the recommended traffic signal be installed with the next phase of development. Legal Review: This did not require city attorney review Fiscal Impact: None Recommendation: The Planning and Zoning Commission recommended APPROVAL of the PD request subject to staff conditions listed above. Attachments: 1. PZ Staff Report 2. Detail Site Plan 3. Landscape & Mitigation Plan 4. Rendering 5. Elevations 6. Exterior Courtyard 7. Material Board Exhibit