Staff Report.PDITEM # 7
Page 1 of 5
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE No.: PD-250R28-H, Main Street Old Town
P&Z HEARING DATE: March 16, 2023
C.C. HEARING DATE: April 11, 2023
STAFF REP.: Mary Paron-Boswell, Senior Planner
LOCATION: Southwest corner of W. Bethel Road and Main Street
SIZE OF AREA: 0.946 acres of property
CURRENT ZONING: H (Historic)
REQUEST: H (Historic) to PD-250R28-H (Planned Development 250-Revision 28- Historic)
to add this property to the conceptual Planned Development for the Main Street Old
Town Project; creating 7 lots with six (6) proposed two-story buildings (two (2)
mixed-use professional office & residential, one (1) mixed-use medical
office/retail/restaurant & residential, two (2) mixed-use retail/restaurant &
residential, one (1) retail/restaurant), and a common parking lot.
APPLICANT: Developer: Surveyor: Owner:
Chris Collins GPF Architects Chadick Capital, L.P.
560 N. Coppell Rd Greg Frnka Steve Chadick
Coppell, TX 75019 549 Sandy Lake Rd 5850 Lovers Lane, Apt. 353
214-477-0320 Suite 100 Dallas, TX 75206
chriscollins@kw.com Coppell, TX 214-543-3717
gfrnka@gpfarchitects.com srchadick@verizon.net
HISTORY: This property has never been platted. There are two structures on the site.
According to the Historic Resource Survey, the “T” shaped building was built in
1948 as the Coppell Baptist Church, replacing a building erected in 1896. The other
structure, an education building, is an addition to the church that was built in 1953
and housed the kitchen, nursery, and Sunday School rooms. Additional information
regarding the style of the structure has been included as an attachment. In
December of 2022, a request for this site failed by a vote of (3-4) by the Coppell
City Council. The request included 7 lots (three (3) mixed-use office/residential
(Bldgs. 1, 2 and 6), two (2) mixed-use retail/residential (Bldgs. 4 and 5), one (1)
retail building (Bldg. 3) and one (1) common parking lot.)
HISTORIC COMMENT: The site has Historic District zoning and is listed in the Historic Resource Survey
as Priority A (church) and Priority B (education building). According to the survey
Priority A is architecturally and historically significant and Priority B is historically
ITEM # 7
Page 2 of 5
significant. The resource survey lists the “T” shaped church as a one-story
minimalist traditional structure that lacks decorative detailing but does have a front-
facing gabled roof and front porch. The survey also lists the educational building
as being constructed in the minimalist traditional style featuring wood construction,
a front gabled roof and a simple façade.
TRANSPORTATION: West Bethel Road is a two-lane undivided road and Main Street is a two-lane
divided road with angled on-street parking.
SURROUNDING LAND USE & ZONING:
North – Residence & Salon, (H)
South – Office and City parking lot (PD-250R8-H)
East - Restaurant (PD-250R8-H)
West – Office buildings (PD-275-H)
COMPREHENSIVE PLAN:
Coppell 2030, A Comprehensive Master Plan, indicates this property as Old
Coppell Historic District. The Old Coppell Master Plan identifies this area as ideal
for mixed-use with a retail and service concentration for ground floors.
DISCUSSION: Site Plan
The site is located at the southwest corner of W. Bethel Road and Main Street. It
currently contains two buildings that are proposed to be removed from the site to
allow for this development. The site is just under an acre in size and is proposed to
have seven lots containing six new mixed-use buildings and a parking lot. The main
change from the previous submittal to this submittal is the proposed uses for the
buildings, with restaurant uses being added to buildings 3-6 and the addition of
medical office and retail to building 6. Buildings 1 and 2 will front W. Bethel Road.
Building 3 is located at the corner of Main Street and Bethel and the remaining
three buildings (4, 5 & 6) will front Main Street. These will have a similar spacing
as the existing buildings to the south. The proposed uses for the buildings are as
follows:
· Buildings 1 & 2 – office ground floor and residential above.
· Building 3 - retail or restaurant ground floor and retail above.
· Buildings 4 & 5 – retail or restaurant ground floor and residential above.
· Building 6 - medical office or retail or restaurant below and residential
above.
In the buildings with the residential component, the residential portion will be
located on the second floor and will have two garage spaces on the ground level
accessed from the rear of the lot. Lot 7X is not developable and will solely be used
as a common parking lot and is part of the PD conditions. Parking for the site will
be a combination of garage parking, on-street parking on Main Street, parking on
proposed Lot 7X, and parking spaces from the existing public parking spaces
nearby. The number of parking spaces required depends on the uses that will
occupy the buildings. The combination of existing and proposed parking in the
ITEM # 7
Page 3 of 5
area will accommodate the proposed uses. As proposed, using the denser restaurant
uses per building, 118 parking spaces will be required versus the previous proposal
that required 74. This site is proposed to be added to the conceptual Planned
Development for the Old Town/Main Street Project and the existing P.O.A. for
maintenance of the parking lot and amenities (benches, dumpster, trash receptacles,
bike racks, sidewalks between buildings in easements, etc.). A sidewalk will be
built along Bethel Road and connecting sidewalks will be constructed from the
proposed Lot 7X parking lot to the street frontages via a four-foot (4-ft) sidewalk
easement located in between each of the buildings. No signs have been proposed
with this development.
Building Elevations
The development will contain six (6) buildable lots that share common design
elements and materials. They are in compliance with the Historic District design
guidelines. Each of the buildings will be two-story, with heights varying from
roughly 28-ft to just under 35-ft. Building one’s height increased approximately
two feet and building six’s height was reduced by four feet from the previous
submittal. The other buildings’ height did not change, neither did the elevations,
materials and colors. The material board identifies the color palette to be used on
the buildings within the development. A common shingle, brick and stone will be
used in the structures as well as building trims and accent color. The siding and
trims will be cement fiber board lap siding and shingle look siding with wood or
insulated steel front doors painted to match the trim. The two-car garage doors will
be a decorative insulated metal in the Arts and Crafts style. More detailed
information is provided on the elevations themselves for buildings 1-6, along with
the materials and colors proposed. A rendering with different views is also
provided.
Colors are from the Sherwin Williams exterior historic preservation palette. The
color for Building 1 will be Bunglehouse Blue with trims and soffits in a classical
white or light gray; the building is a combination of cement fiber board lap siding
and shingle look siding with decorative brackets and decorative porch poles with a
stone base.
The color for Building 2 will be a Westchester Gray with trims and soffits in a
classical white or light gray; cement fiber board lap siding makes up the elevation
materials. A front porch with a standing seam metal roof with exposed rafter tails
and painted tapered columns on a brick base. This will be carried over to the porch
at the rear of the dwelling but will have a roof matching the main roof of the house.
Architectural brackets will be located over the garage door, and a second story
balcony in the front of the building as well.
Building 3 will be Downing Earth in color, with trims and soffits in a classical white
or light gray; a standing seam metal roof on the turret with a decorative finial, and
stone construction, a wrap-around porch with decorative wood porch poles, a stone
base is located on the ground floor. A second story balcony with wall sconces is
located on the eastern elevation, with wooden railings for all of the balconies and
porch areas.
ITEM # 7
Page 4 of 5
The color for Building 4 will be Downing Stone with trims and soffits in a classical
white or light gray; the cement fiber board siding will be a combination of wood
shingle look and a smoother looking siding with a stone base for a portion of the
front façade, and a balcony on the second story.
The color for Building 5 will be Roycroft Copper Red with trims and soffits in a
classical white or light gray; with vertical cement fiber siding with battens, a front
porch with a standing seam porch roof and architectural brackets over the garage
door.
The color for Building 6 will be Rockwood Blue Green with trims and soffits in a
classical white or light gray; the cement fiber board siding will be a combination of
wood shingle look and a smoother looking siding and a front porch with a standing
seam porch roof a stone base; and dormers on the roof.
Landscaping
There are no changes to the landscape plans from the previous submittal. The
existing trees interior to the site are proposed to be removed. A tree removal permit
will be required to remove trees on-site. There are also some Hackberry trees that
will need to be removed to provide access to this site through the existing city
parking lot located south of this site. The applicant will need to coordinate with the
Parks Department for the removal of those trees and any existing irrigation system.
The developer will be planting additional overstory trees on-site. Per the landscape
plans provided additional Cedar Elm, Chinese Pistache, Lacebark Elm and Texas
Red Oak trees will be planted throughout the site. The yards will have a variety of
landscaping that includes trees, grass, shrubs and groundcovers, with the focus
being the front yards. The parking lot (Lot 7X) will also have trees located in the
islands and western perimeter. The building lots have a range of 32%-36%
landscaping. Per the developer, the POA will maintain all landscaping on-site.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending APPROVAL of the request subject to:
1. There may be additional comments during the Detail Engineering review.
2. Final Plat cannot be filed until buildings have been removed and zoning is approved.
3. Tree removal permit will be required prior to construction.
4. Coordinate with Parks Department for the removal of offsite trees and relocation of irrigation south of
Lot 7X to allow for access via the City’s parking lot.
5. Lot 7X, Block A, Main Street Old Town Addition shall only be used for parking.
6. Lot 7X, Block A, Main Street Old Town Addition will not have street frontage, but will be accessible via
an access easement which will be required between Lot 7X, Block A, Main Street Old Town Addition and
the City of Coppell.
7. Existing 15 parking spaces on Main Street in front of this development shall be counted for this
development on the condition that this development becomes part of the Old Town POA.
8. Existing parking spaces in the “Old Town” area shall be counted towards this development on the
condition that this development becomes part of the Old Town POA.
ITEM # 7
Page 5 of 5
9. The POA shall be responsible for maintenance of the common area, proposed Lot 7X, Block A, Main
Street Old Town Addition, and all landscaping.
10. All signage must comply with H District ordinance requirements.
11. Building 3 will not have any residential uses but may have a commercial occupancy on the second floor.
12. Maximum building height shall not exceed 35-ft above finished floor.
13. The POA shall maintain all amenities including benches, dumpster, trash receptacles, bicycle racks,
sidewalk easements between buildings, etc.
14. The POA shall maintain the private drainage easement.
15. Submit a letter from the Old Town Main Street POA stating that they will accept this development into
their POA and all of the responsibilities and conditions stated above.
ALTERNATIVES:
1. Approval of the request
2. Denial of the request
3. Modification of the request
4. Take the case under advisement to a future date
ATTACHMENTS:
1. Detail Site Plan
2. Landscape Plan
3. Elevations, Rendering & Material Board
4. Parking Plan
5. Historic Society Survey Sheets