City Council Memo1
MEMORANDUM
To: Mayor and City Council
From: Mindi Hurley, Director of Community Development
Date: April 12, 2022
Reference: Public Hearing: Consider approval of PD-289R-C, CISD 9th Grade Center Locker Room Building
Addition, a zoning change request from PD-289-C to PD-289R-C (Planned Development-289
Revised- Commercial), to revise the Planned Development and approve a 2,800 square-foot locker
room on 51.59 acres of land located on the southwest quadrant of Wrangler Drive and Crestside
Drive at the request of Coppell Independent School District (C.I.S.D.) being represented Robert
Howman of Glenn Engineering.
2040: Create Business & Innovation Nodes
Executive Summary:
The Coppell Independent School District is requesting to update and revise the Detail Planned Development to
reflect existing and proposed changes to the site. This application is seeking approval to construct a 2,800 square-
foot new locker room to be used for the existing baseball and softball fields.
Introduction:
The property continues to evolve, and a new 2,800 square-foot locker room building is being proposed to be added
to the site to accommodate the baseball and softball athletes. The building will also have storage space and a
changeroom for referees. The building will be located close to the ballfield’s existing concession stand,
maintenance building, and existing parking lot. There are no proposed changes in the parking area which contains
629 spaces and there are no landscaping changes proposed. As depicted on Elevation Sheet, the proposed locker
room building is 18-feet 10-in height and will match the existing buildings on-site. Signage on the building will
consist of the Coppell Cowboy star logo and “COPPELL ISD BASEBALL AND SOFTBALL COMPLEX, written
in 18-inch cast aluminum letters, brushed stainless. Signage for the building will be approximately 67-sf. A sign
permit will be required for the signage.
Analysis:
On March 17, 2022, the Planning and Zoning Commission unanimously recommended APPROVAL (7-0) of PD-
289R-C, subject to the following conditions:
1. The signage be approved as shown.
2. A sign permit will be required.
Legal Review:
N/A
Fiscal Impact:
None
Recommendation:
2
The Planning and Zoning Commission recommended APPROVAL of the PD request subject to staff conditions
listed above.
Attachments:
1. PZ Staff Report
2. Overall Site Plan
3. Detail Site Plan
4. Demolition Plan
5. Elevation & Signage Plan