Loading...
City Council Memo1 MEMORANDUM To: Mayor and City Council From: Mindi Hurley, Director of Community Development Date: July 12, 2022 Reference: Public Hearing: Consider approval of PD-259R2-SF-7/SF-9, a zoning change request from PD- 259R-SF-7/SF-9 (Planned Development- 259 Revised- Single Family-7 & 9) to PD-259R2-SF- 7/9 (Planned Development-259 Revision 2 -Single Family-7 & 9), to permit the development of 63 single-family lots and nine (9) common area lots on approximately 54.855 acres of land located on the north side of Sandy Lake Road, approximately 1380-ft east of MacArthur Blvd, at the request of HBBL Development , Inc., being represented by Westwood Professional Services. 2040: Enhance the “Community Oasis” Experience Executive Summary: This development obtained approval of the PD and plats in 2020 and 2021 with two phases and a total of 74 residential lots and nine (9) common area lots. They have come back to request some additional conditions and make modifications to Phase 2 of the development. Introduction: This current request is similar to the existing PD, except that the number of residential lots has been reduced. Phase 1 contained 54 residential lots and Phase 2 contained 20 residential lots, which were subject to a variety of conditions. The applicant is now revising the plat for Phase 2, reducing the number of residential lots from 20 down to nine (9) and asking for additional PD conditions. Some of the PD conditions relate to the entire subdivision, while others relate specifically to proposed Lot 5R, Block D, located in Phase 2, which the developer plans to occupy himself. Analysis: On June 16, 2022, the Planning and Zoning Commission unanimously recommended APPROVAL (6-0) of PD- 259R2-SF-7/SF-9, subject to the following additional new conditions: The following conditions are being requested as part of this overall amended PD: · The previous PD stated that the minimum house size for Phase 1 (SF-9) would be 3,000-sf. The new request for Phase 1 (SF-9) is to allow for a minimum 2,700-sf house, which is significantly larger than the 1,600-sf required in the SF-9 District. As stated, this is only a minimum and would still allow for larger homes. Staff is in support of this request. · Items V) to Y) have been added to the list of PD conditions: o V) Early start building permits for up to 10 homes may be issued after infrastructure acceptance by the City, in advance of landscape acceptance by the City. Staff is in support of this request. No Certificates of Occupancy will be allowed prior to landscaping being accepted. 2 o W) This subdivision must comply with the American Bald Eagle and Golden Eagle Act of 1940 and regulations promulgated thereunder. This is a federal requirement and serves to protect the habitat of the birds found nesting in a portion of Phase 2. o X) Lots with permitted swimming pools may have a pool cabana with a restroom. Currently the restroom is not allowed, however, this has been a common request and staff is in support of this request. The following conditions are being requested specifically for Lot 5R, Block D, which is located in Phase 2 at the end of the cul-de-sac on Windmill Dr. Lot 5R backs up to a common area. The developer is planning to reside here and is planning to have an accessory dwelling unit for their parents to live in, thus the request for the full kitchen. If at some point in time this home were to be subdivided out of Lot 5R, it would need to meet all of the minimum requirements including house size. The six individual accessory units will be smaller than the main structure but may in total be larger than the main residential dwelling unit, which is listed as a PD condition below. In addition, the type of structures being requested, especially the barns, will be taller than the maximum 12-ft building height for accessory structures, and is also listed as a PD condition below. The last part of the request is to be allowed to have animals and their enclosure on the lot. o Y) The following PD conditions pertain directly to Lot 5R, Block D: 1. Up to six (6) accessory structures with a combined sized not to exceed 8,500-sf. 2. The accessory structures include: a. One (1) detached accessory dwelling unit with a secondary kitchen and bathroom, not to exceed 1,700-sf of living area, 500-sf garage and 300-sf of patio area. b. One (1) shop/barn not to exceed 2,600-sf. c. One (1) barn not to exceed 2,000-sf. d. One (1) aviary not to exceed 600-sf. e. One (1) decorative windmill f. One (1) pool cabana not to exceed 800-sf. 3. Maximum accessory building height 25-ft to the peak. 4. Each accessory structure may be allowed to have a restroom and/or sink. 5. Any horse, cattle, sheep or goat or any other livestock may be allowed within 100-ft of any residence or occupied building on Lot 5R, Block D. 6. Any enclosure, pen, corral or other restrictive area for livestock may be located within 10 ft of any property used for residential purposes on Lot 5R, Block D. 7. Must meet all other livestock requirements. 8. If the Accessory Dwelling Unit were to be subdivided from the main lot, it must meet all residential requirements. Legal Review: Staff and the City Attorney met with the applicant prior to the submittal. Fiscal Impact: None Recommendation: The Planning and Zoning Commission recommended APPROVAL of the PD request subject to staff conditions listed above. Attachments: 1. PZ Staff Report 2. Revised Concept Plan & PD Conditions 3. Lot 5R Study Exhibit