Staff Report Replat, Phase 2.JulyITEM #7
Page 1 of 3
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE NO.: Blackberry Farm, Replat Phase 2
P&Z HEARING DATE: July 21, 2022
STAFF REP.: Mary Paron-Boswell, Sr. Planner
LOCATION: North side of Sandy Lake Road, 750 feet northeast of Starleaf Road
SIZE OF AREA: 9.209 acres of property
CURRENT ZONING: PD-259R-SF-7/9 (Planned Development-259-Single Family-7 & 9)
REQUEST: A replat of Blackberry Farm Phase 2, reducing the number of residential lots
from 20 to nine, and shortening the cul-de-sac on Windmill Drive
APPLICANT: HBBL Development, Inc. Westwood Professional Services Inc,
c/o The Holmes Builders 2901 Dallas Parkway, Suite 400
225 E. State Highway 121, Suite 120 Plano, TX 75093
Coppell, TX. 75019 (972) 265-4865
(214) 488-5200 Email: Alicia.coronilla@gmail.com
Email: terry@holmesbuilders.com
HISTORY: In early 1999, the applicant applied for rezoning from SF-12 to PD–SF-9 on
28.21 acres to develop 55 residential lots, and the request was denied. In 2012,
Coppell annexed property from Carrollton. The applicant acquired property
from an adjacent property owner and enlarged the request area by 26.6 acres.
This increased the overall residential development to total 82 single-family lots,
with 6 common areas.
In 2013 City Council approved PD-259-SF-7/9 subject to various conditions,
including Flood Plain Study and a tree mitigation fee of $125,000 being paid
prior to construction.
Preliminary Plats and Final Plats for this property were approved in 2014 and
again in 2016, all of which have expired.
On July 19, 2018, the Planning and Zoning Commission again approved a
Preliminary Plat for the 74 lots, and a Final Plat for Phase 1, containing 54 lots,
subject to a significant list of conditions.
On December 11, 2018, City Council, after tabling the request four times at the
request of the applicant, approved the PD, subject to various conditions.
On December 20, 2018, the Planning and Zoning Commission granted a 6-
month extension of the Final Plat approval for Phase One of this development.
ITEM #7
Page 2 of 3
The Final Plat for Phase 1 was extended several times and was ultimately
approved in 2020.
Phase 2, the subject property, was approved in March of 2021, containing 20
residential lots and one common area lot.
The PD for this development was revised in July of 2022, and the proposed plat
reflects the lot changes for Phase 2.
TRANSPORTATION: Sandy Lake Road is an improved, C4D/6, four-lane divided thoroughfare in a six-
lane right-of-way (110 feet).
SURROUNDING LAND USE & ZONING:
North: vacant flood plain, City of Carrollton
South: Blackberry Farm Phase 1
East: vacant flood plain, City of Carrollton
West: landscape nursery, Lakewood Estates; R- Retail and Single Family; (SF-7)
COMPREHENSIVE PLAN:
Coppell 2030, A Comprehensive Master Plan, shows this property as
Residential Neighborhood and Floodplain
DISCUSSION: Phase I of this project contains 54 lots and eight common area lots. The
previous plat for Phase 2 of the project, which is on the northern portion of
Windmill Drive, will still be accessed from a bridge to be constructed over the
creek. It previously contained 20 residential lots and one common area lot. The
residential lots ranged in size from 9,000 to 17,000 square feet, with an average
lot size of 11,637 square feet. The main change for this phase is a reduction in
the number of residential lots from 20 to nine. The majority of the lots for Phase
2 have been combined to create larger lots ranging from 16,000 to 23,000 square
feet. There is one lot, Lot 5R, Block D, that is significantly larger than the
others (83,124-sf) and wraps the cul-de-sac. This lot is requesting PD
conditions that is part of the zoning case. The street leading up to the cul-de-
sac on Phase 2 has been shortened to allow for a tree to be saved on Lot 5R,
Block D, after it was discovered that a bald eagle was nesting there. The replat
serves to replat the lots from 20 to nine, abandon previous easements and create
new easements by this plat.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff is recommending approval of the Final Plat, Phase 2, for Blackberry Farms subject to the following
conditions:
1. There may additional comments generated upon detail engineering plan review.
2. Filing information for off-site easements must be filed and noted on this plat prior to filing this plat.
3. HOA documents must be updated and filed prior to filing this plat.
ALTERNATIVES:
1. Recommend approval of the request
2. Recommend disapproval of the request
3. Recommend modification of the request
ATTACHMENTS:
ITEM #7
Page 3 of 3
1. Replat for Phase 2 of Blackberry Farms